Loading...
HomeMy WebLinkAboutItem 18 - State Highway 121 CC ITEM#18 MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER�fL,�,,- MEETING DATE: MAY 21, 2013 SUBJECT: RESOLUTION APPROVING A TRAFFIC SIGNAL CONSTRUCTION AGREEMENT WITH TXDOT FOR STATE HIGHWAY 121 RECOMMENDATION: it Council consider a resolution approving a National Highway System Agreement for State-Contracted Traffic Signal Construction with the Texas Department of Transportation stipulating a reimbursement not to exceed $21,578.00, for the State Highway 121 (Section 13) project, authorize City Manger to execute said agreement, and take any necessary action. BACKGROUND: The Texas Department of Transportation (Tx T) is currently completing design of improvements to State Highway 121 (Section 13), encompassing the interchanges with Grapevine Mills Boulevard/Sandy Lake Road and Freeport Parkway. It is expected that this project will be out for bids in summer 2013. This project includes reconstruction of the traffic signals at the two interchanges listed above. The temporary traffic signals at these locations are owned by Tx DOT and maintained by the City. This arrangement will continue aft er construction of the permanent improvements is complete. Since the City will operate and maintain the permanent traffic signals, it is most practical and cost efficient for the signal controllers and cabinet assemblies to be compatible with the equipment that the City utilizes at other intersections. The City and State staffs agree that it is in the best interest of of agencies forte City to furnish the equipment for installation by the State's contractor. This agreement provides the means for the State to reimburse the City fort actual cost oft equipment to be furnished in an amount not to exceed $21,578.00. Staff recommends approval. JSL/MP May 15,2013(12:20 M) CC ITEM#18 RESOLUTION NO. S(4 A14-L- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING A NATIONAL HIGHWAY SYSTEM AGREEMENT FOR STATE-CONT ED TRAFFIC SIGNAL CONSTRUCTION WITH THE TEXAS DEPARTMENT OF TRANSPORTATION AND PROVIDING AN EFFECTIVE DATE WHEREAS, the State owns and maintains a system of highways and roadways, including State Highway 121, located within the boundaries of the City of Grapevine, Texas; and WHEREAS, the State is preparing to construct roadway improvements to to Highway 121 including traffic signal improvements at the intersections of State Highway 121 at Grapevine Mills Boulevard/Sandy Lake Road and at Freeport Parkway, called the "Project"; and WHEREAS, the City and State is to cooperate in the construction of this Project; and WHEREAS, the City maintains the traffic signals at the intersections of State Highway 121 at Grapevine Mills Boulevard/Sandy Lake Road and at Freeport Parkway; and WHEREAS, the City desires that traffic signal equipment be installed with the Project that is compatible with existing City equipment; and WHEREAS, the City has proposed to furnish traffic signal equipment for the State's contractor to install at the two intersections with the State reimbursing the City fort cost oft equipment provided; and WHEREAS, it is in the best interest of the City and the State for the City to assist the State by furnishing traffic signal equipment on the Project; and WHEREAS, the City Council deems the adoption o f t his Resolution to be in the best interests oft health, safety, and welfare of the public. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated in the preamble are found to be true and correct and are incorporated herein for all purposes. CC ITEM#18 Section 2. That the City Council of the City of Grapevine, Texas, hereby authorizes and approves entering into this National Highway System Agreement for State-Contracted Traffic Signal Construction with the Texas Department of Transportation. Section 3. That this resolution shall be effect from and after its passing. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, on the 21st day of May, 2013. APPROVED: ATTEST: APPROVED AS TO FORM: ORD. NO. 2