Loading...
HomeMy WebLinkAboutItem 07 - FP Original Town of Grapeviner ITIEIT,10 TO: THE HONORABLE MAYOR, MEMBERS OF THE CITY COUNCIL, AND THE PLANNING & ZONING O RUMBELOW, CITY MANAGER �t2- MEETING DATE: NOVEMBER 20, 2012 SUBJECT: FINAL PLAT APPLICATION LOT 2R, BLOCK 4, ORIGINAL TOWN PORTION OF • T 3, BLOCK 4, ORIGINAL TOWN OF GRAPEVINE) PLAT APPLICATION FILING DATE ..................... ............................... November 6, 2012 APPLICANT .......... ............................... ........................Anthony Bologna, BIATWIC, LLC. REASON FOR APPLICATION ................. ............................... Platting three lots into one PROPERTY LOCATION ........... ............................... ............................520 S. Main Street ACREAGE............................................. ............................... ..........................0.741 acres ZONING...................................................................................... ............................... CBD NUMBER OF LOTS ........................................................................... ..............................1 PREVIOUS PLATTING .................................................. ............................... 1913 & 2011 CONCEPTPLAN ......................................................................... ........................SU12 -03 SITEPLAN .................................................................................... ............................... No OPEN SPACE REQUIREMENT .................................................... ............................... No AVIGATION RELEASE ..................................... ............................... ............................Yes PUBLIC HEARING REQUIRED ........................ ............................... ............................Yes 0AAGENDA12012111- 20- 1210TOG R.doc PLAT INFORMATION SHEET FINAL PLAT APPLICATION LOT 2R, BLOCK 4, ORIGINAL TOWN OF GRAPEVINE (BEING A REPLAT OF LOTS 1R1, 2 AND A PORTION OF LOT 3, BLOCK 4, ORIGINAL TOWN OF GRAPEVINE) GENERAL: • The applicant, Anthony Bologna is platting this 0.741 acre site from three lots into one lot. The property is located at 520 S. Main Street. STREET SYSTEM: • The development has access to Main Street. • ALL abutting roads: ❑ are on the City Thoroughfare Plan: ® are not on the City Thoroughfare Plan: ❑ Periphery Street Fees are due as follows: Type of Roadway Cost 1 LF ❑ Major Arterial (A) ❑ Major Arterial (B) ❑ Minor Arterial (C) ❑ Minor Arterial (D) ❑ Collector (E) ❑ Collector (F) ❑Sidewalk ❑Curb & Gutter $ 234.571 LF $ 178351 LF $ 203.061 LF $ 170.331 LF $ 170.331 LF $ 150.98 / LF $ 25.001 LF $ 10.00/1-F ® Periphery Street Fees are not due: TOTAL STORM DRAINAGE SYSTEM: • The site drains east to Main Street. Length Cost • The developer will be required to design for onsite as well as offsite drainage in accordance with the requirements of the City of Grapevine's Code of Ordinances. 0:IAGENDA12012111- 20- 1210TOG R.doc IV. WATER SYSTEM: ® The existing water supply system bordering the subject site is adequate to serve the development. ❑ The existing water supply system bordering the subject site is not adequate to serve the development. Additional off site water system improvements will be necessary to serve the site. V. SANITARY SEWER SYSTEM: ® The existing sanitary sewer collection system bordering the subject site is adequate to serve the development. ❑ The existing sanitary sewer collection system bordering the subject site is not adequate to serve the development. V1. MISCELLANEOUS: ® Water and Wastewater Impact Fees are not required for: Lot 2R, Block 4, Original Town of Grapevine ❑ Water and Wastewater Impact Fees are due prior to the issuance of building permits: ❑ Single Family Residential ( $ 2,7781 Lot) ❑ Multifamily ( $ 1,291 1 Unit) ❑ Hotel ( $ 47,631 1 Acre) ❑ Corporate Office ( $ 22,0231 Acre) ❑ Government ( $ 7,6881 Acre) ❑ Commercial 1 Industrial ( $ 6,3521 Acre) ® Open Space Fees are not required for: Lot 2R, Block 4, Original Town of Grapevine ❑ Open Space Fees are required for: ❑ R -5.0, Zero Lot District ( $ 1,416.001 Lot) ❑ R -7.5, Single Family District ( $ 1,146.001 Lot) ❑ R -12.5, Single Family District ( $ 1,071.001 Lot) ❑ R -20.0, Single Family District ( $ 807.001 Lot) 0:IAGENDA120 1 211 1- 2 0- 1 210TOG R.doc Public Hearing Only Variances were required on the following items: ❑ Front building line ❑ Rear building line ❑ Lot width & depth ❑ Max. Impervious Area ❑ The following items associated with this plat are not in accordance with the current subdivision standards: �.....,, 50' ROW dedication not met: Developer is proposing to dedicate variable width private access easements throughout the development. The access easements will be owned and maintained by a Home Owners Association (HOA). ❑ Length of cul -de -sac street exceeds the 600 -foot limit: ❑ Driveway Spacing not met. STATEMENT OF FINDINGS: A. The City has determined that the right -of -way and easements required to be dedicated for streets, utilities, drainage, access, sidewalks and other municipal needs and services are consistent with the City's ordinances and master plan, are reasonable and are connected to the proposed project In the following manner: ❑ The right -of -way provides for future widening of public streets that will serve the development of this site. ❑ The onsite utility easements provide for a utility network to serve the development of this site. The onsite drainage easements provide for a drainage network to serve the development of this site. The onsite access easements provide cross access capabilities to this site and surrounding property. ® The onsite sidewalk easements provide for a sidewalk network to serve the development of this site. 0:IAGENDA12012111- 20- 121OTOG R.doc B. The City further finds that the required dedication is related both in nature and extent to the impact of the proposed development as follows: ❑ The right -of -way is necessary to provide for future widening of public streets that will serve the development of this site. ❑ The onsite utility easements are necessary to provide for a utility system to serve this development and connect to existing utilities on surrounding property. ❑ The onsite drainage easements are necessary to provide for storm drainage improvements to serve the development of the site. ❑ The onsite access easements are necessary to provide cross access capabilities to this site and surrounding property. ® The onsite sidewalk easements are necessary to provide for a sidewalk network to serve the development of this site. ® All of the dedications benefit the development to at least the extent of the impact of such on the development. Vill. RECOMMENDATION: The members of the City Council and The Planning & Zoning Commission consider the following motion: "Move that the City Council (Planning and Zoning Commission) approve the Statement of Findings and the Final Plat of Lot 2R, Block 4, Original Town of Grapevine." 0:IAGENDA12012111- 20- 1210TOG R.doc