Loading...
HomeMy WebLinkAboutItem 10 - Denton Creek TrailITEM # MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGERrC?Y MEETING DATE: NOVEMBER 20, 2012 SUBJECT: RESOLUTION AUTHORIZING AWARD OF A CONSTRUCTION CONTRACT FOR THE DENTON CREEK TRAIL EROSION CONTROL PROJECT AND TO APPROPRIATE FUNDS FROM THE UNAPPROPRIATED BALANCE OF THE STORMWATER DRAINAGE UTILITY FUND RECOMMENDATION: City Council to consider approving a resolution authorizing the award of a construction contract to ARK Contracting Services for the Denton Creek Trail Erosion Control Project and to appropriate $215,349.00 from the unappropriated balance of the Stormwater Drainage Utility Fund. The Silver Oaks Apartments, adjacent to the project, have contributed half of the total construction cost of $370,174.50. FUNDING SOURCE: Unappropriated balance of the Stormwater Drainage Fund to Account #116- 48941 -535- 1 -0012. BACKGROUND: The Fiscal Year 2013 Budget has $525,000.00 allocated for the construction of this project in the Stormwater Drainage Utility Fund. Staff has recommended that the City award the construction contract to ARK Contracting in the amount of $740,349.00. There are sufficient funds in the unappropriated balance of the Stormwater Drainage Utility Fund to appropriate the additional $215,349.00 required. The allocation is necessary because the City is acting as general contractor and as such a full appropriation of the full contract amount is required for audit purposes, even though we have received $370,174.50 from the apartment owner. A total of six contractors bid on the erosion project and the low bid was received from ARK Contracting Services. Below are the bids received for the construction project: CONTRACTOR BASE BID ARK Contracting Services $ 740,349.00 Humphrey and Morton Construction $ 845,879.00 Austin Filter Systems, Inc. $ 957,697.00 Hayward Baker — Olden Division $ 968,876.10 November 16, 2012 (2.24 PM) Earth Builders, LP $'1,342,835.00 DCI Contracting, Inc $ 1,553,327.00 Staff recommends the Council award a construction contract for repair of the erosion along Denton Creek to ARK Contracting in the amount of $740,349. J Mljcb November 16, 2012 (2:24PM) 1 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING THE CITY MANAGER OR THE CITY MANAGER'S DESIGNEE TO AWARD A CONSTRUCTION CONTRACT FOR THE DENTON CREEK TRAIL EROSION CONTROL PROJECT AND TO APPROPRIATE FUNDS FROM THE UNAPPROPRIATED BALANCE OF THE STORMWATER DRAINAGE UTILITY FUND AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City of Grapevine, Texas desires to repair the erosion to the Hike and Bike Trail along Denton Creek and provide drainage improvements to prevent future erosion in the affected area; and WHEREAS, the Fiscal Year 2013 Budget has $ 525,000.00 allocated for the construction of this project in the Stormwater Drainage Utility Fund; and WHEREAS, the City of Grapevine has sufficient funds in the unappropriated balance of the Stormwater Drainage Utility Fund; and WHEREAS, the Silver Oaks Apartments, adjacent to the project are contributing half of the total construction cost; and WHEREAS, the City of Grapevine's Parks and Recreation Department has a need to repair the Denton Creek Hike and Bike Trail. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated in the above preamble are true and correct and are incorporated herein as if copied in their entirety. Section 2. That the City Council of the City of Grapevine enters into a construction contract with ARK Contracting Services. Section 3. That the sum of $ 215,349.00 be appropriated from the unappropriated balance of the Stormwater Drainage Utility Fund to Account # 116- 48941- 5351- 00012. Section 4. That the City Manager, or his designee, is authorized to take all steps necessary to consummate the repairs and erosion control to the Denton Creek Trail. Section 5. That this resolution shall take effect from and after the date of its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 20th day of November, 2012. APPROVED: ATTEST: APPROVED AS TO FORM: RES. NO. 2