Loading...
HomeMy WebLinkAboutECS 1-3-2020 - Missing Field Values - Missing Field ValuesWe are enclosing:Field Reports For your use As requestedXXX January 3, 2020 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 53 12/31/2019 Lot4Lot6 Sidewalks Eli WoodSiddharth Neekhra Principal Engineer Construction Materials Dept. Manager JAN 3 2020 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/5 ECS Southwest, LLP 63:1045 53 Grapevine Station North-Phase 1 Tuesday 12/31/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 4.50 The undersigned arrived on site, as requested, to observe the placement of 3600 psi concrete for Lot 4 / Lot 6 Sidewalks. Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, air content, and batch to placement time. The slump was higher than design parameters. The superintendent was notified. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. Prior to the placement of concrete, the reinforcing steel was observed and appeared to installed in accordance with the project drawings and specifications. 52°/ Sunny 45.00 3.25 0.25 0.00 10:00A 01:15P Lot4Lot6 Sidewalks Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* David McAllister, — Field TechnicianBy 1800 19681 Transmittal Page 2/5 Transmittal Page 3/5 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 12/31/2019 Westwood Group Sunny / 52 None Listed Charley's Concrete Mix Designation:4142 Mix Strength:3600 psi Design Strength:3000 psi B to P min. 1 2141 122529 10.0 10.0 10:44 11:13 11:37 *5.00 5.90(P 56.00 053 * Location:By:David McAllisterLot 4 / Lot 6 Sidewalks ECS Southwest, LLP WO:5920 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 4/5 Transmittal Page 5/5