Loading...
HomeMy WebLinkAboutECS 10-17-2019 (5) - Missing Field Values - Missing Field ValuesWe are enclosing:Field Reports For your use As requestedXXX October 17, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 45 10/08/2019 Lot 5 Pave Pour 2 Eli WoodSiddharth Neekhra Principal Engineer Construction Materials Dept. Manager OCT 17 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/5 ECS Southwest, LLP 63:1045 45 Grapevine Station North-Phase 1 Tuesday 10/08/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 7.00 The undersigned arrived on site, as requested, to observe the placement of 4000 psi concrete for Lot 5 Pavement (Traffic Lanes - Fire Lane) and 3600 psi concrete for Lot 5 Pavement (Parking Areas). Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, air content, and batch to placement time, with the exception of high slump values. The contractor was notified. 65°/ Clear 45.00 5.75 0.25 0.00 :: Lot 5 Pave Pour 2 Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* George Khalil, Sr., — Field TechnicianBy 1800 16444 Transmittal Page 2/5 Transmittal Page 3/5 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 10/08/2019 Westwood Group Clear / 65 None Listed Charley's Concrete Mix Designation:Multiple (see remarks)Mix Strength:Multiple (see remarks)Design Strength:Multiple (see remarks) B to P min. 1 839 446027 10.0 10.0 12:00 12:15 12:30 *6.00 3.00(P 75.00 0 Mix. Des.: 4142 Mix Str.: 3600 psiDes. Str.: 3600 psi30 2 839 446027 10.0 20.0 12:00 12:15 12:25 0.0025 3 753 446028 10.0 30.0 12:00 12:36 12:45 0.0045 4 834 446029 10.0 40.0 12:21 12:46 01:00 *6.00 3.50(P 75.00 0 Mix. Des.: 4518 Mix Str.: 4000 psiDes. Str.: 4000 psi39 5 716 446030 10.0 50.0 12:30 12:55 01:15 0.0045 6 839 446031 10.0 60.0 01:15 01:42 02:00 0.0045 7 842 446032 10.0 70.0 01:19 01:45 02:05 0.0046 8 753 446033 10.0 80.0 01:35 02:15 02:30 0.0055 10 716 446035 10.0 90.0 02:05 02:25 02:45 0.0040 9 834 446034 10.0 100.0 01:52 02:50 03:15 0.0083 * Location:By:George Khalil, Sr.Lot 5 Pavement (Traffic Lanes - Fire Lane) and Lot 5 Pavement (Parking Areas) ECS Southwest, LLP WO:4372 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 4/5 Transmittal Page 5/5