Loading...
HomeMy WebLinkAboutECS 11-22-2019 (2) - Missing Field Values - Missing Field ValuesWe are enclosing:Field Reports For your use As requestedXXX November 22, 2019 Westwood Real Estate Group 1000 Texan Trail Ste. 200 Grapvine, TX 76051 Mr. A.L. Burtin Grapevine Station North-Phase 1 Location: Permits: 63:1045 801 E. Northwest Hwy Grapevine, TX RE: ECS Job # ATTN: 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] ECS Southwest, LLP LETTER OF TRANSMITTAL CC:Westwood Group Development No. 11 - Randy Sawey Les Daigh Excavating and Demolition - Les Daigh City of Grapevine - Donald Dixson ENCL: City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Taylor Hazlewood Acadia Capital Group - Brad Catlett Field Report # 50 11/19/2019 Lot 5 Pave Pour 3 Eli WoodSiddharth Neekhra Principal Engineer Construction Materials Dept. Manager NOV 22 2019 1000.1 Disclaimer 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the activities performed on the report date. 4. Incomplete or non-conforming work will be recorded for future resolution. 3. Where appropriate, this report includes statements as to compliance with applicable project drawings and specifications for the activities performed on this report date. 5. The results of samples and/or specimens obtained or prepared for subsequent laboratory testing will be presented in separate reports/documents. Transmittal Page 1/6 ECS Southwest, LLP 63:1045 50 Grapevine Station North-Phase 1 Tuesday 11/19/2019 Project No. Report No. Day & DateProject 4050 Sandshell Drive, Suite 500 Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] FIELD REPORT 5.00 The undersigned arrived on site, as requested, to observe the placement of 4000 psi concrete for Lot 5 Pavement (Traffic Lanes - Fire Lane) and 3600 psi concrete for Lot 5 Pavement (Parking Areas). Please see the attached sketch. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 55-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. 60°/ Clear 45.00 4.25 0.25 0.00 02:45A 07:00A Lot 5 Pave Pour 3 Location On-Site Time Lab Time Client Grapevine, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Westwood Real Estate Group - A.L. Burtin Trip Charges* Remarks Chargeable Items Weather Mileage* 0.50Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* George Khalil, Sr., — Field TechnicianBy 1800 18690 Transmittal Page 2/6 Transmittal Page 3/6 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 11/19/2019 Westwood Group Clear / 60 None Listed Charley's Concrete Mix Designation:4142 Mix Strength:3600 psi Design Strength:4000 psi B to P min. 8 776 119971 10.0 10.0 03:47 04:15 04:45 0.0058 9 774 119972 10.0 20.0 03:55 04:31 04:50 *4.00 3.00(P)60.00 055 10 751 229973 10.0 30.0 04:06 04:40 05:00 0.0054 11 761 119974 10.0 40.0 04:18 04:55 05:10 0.0052 12 752 119975 10.0 50.0 04:26 05:05 05:20 0.0054 13 777 119982 10.0 60.0 05:14 05:45 06:15 0.0061 * Location:By:George Khalil, Sr.Lot 5 Pavement (Traffic Lanes - Fire Lane) ECS Southwest, LLP WO:5225 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 4/6 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Grapevine Station North-Phase 1 1045 801 E. Northwest Hwy Grapevine, - Tarrant County - TX 76051 11/19/2019 Westwood Group Clear / 60 None Listed Charley's Concrete Mix Designation:4142 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 1 835 119966 10.0 10.0 02:26 03:10 03:25 0.0059 2 779 119967 10.0 20.0 02:47 03:16 03:35 *4.00 3.50(P)65.00 048 3 837 119968 10.0 30.0 02:51 03:28 03:45 0.0054 4 788 119969 10.0 40.0 03:03 03:40 03:55 0.0052 5 795 119970 10.0 50.0 03:17 03:40 04:00 0.0043 6 739 119983 10.0 60.0 05:20 05:45 06:00 0.0040 7 845 119985 10.0 70.0 05:33 06:20 06:45 0.0072 * Location:By:George Khalil, Sr.Lot 5 Pavement (Parking Areas) ECS Southwest, LLP WO:5225 * B to P - Batch to Placement time in minutes 2000.1.1.0 Transmittal Page 5/6 Transmittal Page 6/6