Loading...
HomeMy WebLinkAboutECS 3-18-2020 - Missing Field Values - Missing Field ValuesCONCRETE, GROUT, AND MORTAR TESTS LETTER OF TRANSMITTAL TO:Westwood Group Development No. 11 DATE: RE: PERMIT #: ATTN: JOB NO.: LOCATION: We are enclosing: Grapevine Station North-Phase 1 1045 Clint Baker 801 E. Northwest Hwy, Grapevine, TX 1000 Texan Trail Ste. 200 Grapevine, TX 76051 Tarrant County CC: By: Attached Materials Engineering Division Concrete Reports: 45 For Your Use As Requested X X X X City of Grapevine - Donald Dixson City of Grapevine - Scott Cannon Westwood Group Development No. 11 - Randy Sawey Acadia Capital Group - Brad Catlett Les Daigh Excavating and Demolition - Les Daigh Westwood Group Development No. 11 - Taylor Hazlewood 03/20/2020 ECS Southwest, LLP4050 Sandshell Drive, Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax] Disclaimer TX Registered Engineering Firm # F-8461 Siddharth Neekhra Subsidiary Regional Manager Eli Wood Construction Materials Dept. Manager Transmittal Page 1/4 1. This report (and any attachments) shall not be reproduced except in full without prior written approval of ECS. 2. The information in this report relates only to the sample test specimens obtained on the date sampled. 3. The primary purpose of this report is to present the laboratory test results for the indicated sample test specimens. For a full compliance evaluation of construction events that the specimens represent, this test report must be used in conjunction with the related field report. 4. Non-conforming test results will be recorded for future resolution. 5. Test results that do not meet the required strength levels at the specified ages are marked “ LOW TEST RESULTS”. 3/20/2020Print Date: EWood Transmittal Page 2/4 Concrete Cylinder Strength ReportProject: Cast Date: Set Designation:A 02/18/2020 Project: Location: Grapevine Station North-Phase 1 801 E. Northwest Hwy, Grapevine, TX Design Strength: Report No.: 4000 psi 45 1045ECS Southwest, LLP4050 Sandshell Drive, Fort Worth, TX 76137 (682) 350-2250 [Phone] (817) 847-8616 [Fax]Acceptance Age:28 days TX Registered Engineering Firm # F-8461 Owner: Arch.: Struc. Eng.:Whitworth Engineering - Russell Whitworth Westwood Group Development No. 11 - Clint Baker Conc. Contr.: Gen. Contr.: Client: Placement Location:Lot 6 Pavement Pour 1 Lot 6 Pavement Pour 1Approx. Location Set Represents: Sample #Test Date Test Age Curing Type (F/L) Average Computed Diameter (in) Avg. CrossSectional Area (in²) Breaking Load (lbs) Rounded Compr. Str. (psi) Brk. Type Cap Type Date to Lab Lab Tech 63-1045-45-1 02/21/2020 3 Lab U 02/19/2020 63-1045-45-2 02/25/2020 7 Lab 4.00 12.56 66880 5320 5 U 02/19/2020 AB 63-1045-45-3 03/17/2020 28 Lab 4.00 12.56 81824 6510 3 U 02/19/2020 ab 63-1045-45-4 03/17/2020 28 Lab 4.00 12.56 85792 6830 3 U 02/19/2020 ab 63-1045-45-5 03/17/2020 28 Lab 4.00 12.56 87064 6930 3 U 02/19/2020 ab 63-1045-45-6 04/14/2020 56 Lab U 02/19/2020 Sampling in accordance with (iaw) ASTM C172, except that samples may have been taken from the beginning of the load after a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap Type B are tested using bonded caps iaw ASTM C617, and cylinders denoted with Cap Type N (none) meet the planeness requirements of ASTM C39 and are tested without caps. Break Types are classified as: Type 1, 2, 3, 4, 5 or 6 iaw C39. Initial Curing Conditions 3.5% (P) 5.00in. 11:29 AM 124621 Air Content: Slump/Slump Flow: 60°FConcrete Temperature: 12:25 PMTime Sampled: -Fresh Unit Weight: 50°FAir Temperature: Hany PascalesTested by: Field Test Data Truck No.: Mix Strength: 710 4000 psi Concrete Supplier: Mix Designation: Added Water: Charley's Concrete 4518 - Batch Time: Ticket No.: Insulated Ice OtherHeated Curing Tank No Curing BoxX CooledCuring Box Supplier Information (If ReadyMix) Placement Information 3/20/2020Print Date: EWood Transmittal Page 3/4 Final Review BY: Remarks: 3/20/2020Print Date: EWood Transmittal Page 4/4