Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COMA2018-2958
n I JUL yKlet gle�r� rvott 6,�� eke �,V& C Y q ( ! U 31 201B p.Mti� DATE OFISSUANCE: SGP 26 20Il 'L<�v�"l' /t(`^ PERMIT#: yl� BUILDING PERMIT APPLICA�1T`I'ON (PLEASE PRINT LEGIBLY—COMPLETE ENTIRE FORM) 4, , JOB ADDRESS: 2900 Genesis Wayassumed (assumed) SUITE#n/a LOT: 1 BLOCK: 1 SUBDIVISION: Fellowship Church BUILDING CONTRACTOR (company name): -JD)t) MooIL CURRENT MAILING ADDRESS: I I 1�'0 1\ , �n)a4sr,N � . CITY/STATE/ZIP:_ A-gl) niok) 1 7� PH:# 5) a00 Fax# PROPERTY OWNER: 2NDIP, LP CURRENT MAILING ADDRESS: 1434 Patton Place CITY/STATE/ZIP: Carrollton,TX 75007 PHONE NUMBER: 214.343.2000 PROJECT VALUE: $5.2 million FIRE SPRINKLERED? YES ✓ NO WHAT TRADES WILL BE NEEDED?(Check Gaes that apply)ELECTRIC ✓ PLUMBING ✓ MECHANICAL ✓ DESCRIPTION OF WORK TO BE DONE: Interior Office Tenant Finish-out USE OF BUILDING OR STRUCTURE: Office & Industrial Warehouse Original Submittal SF 1c�,660 NAME OF BUSINESS: The Trade Group, LLC Original Revision Additional SF Total Square Footage under roof: 184,660 SF Square Foc 131,916 - Total SF 316,576 L✓ I hereby certify that plans have been reviewed and the building will be inspectea uy a cernitea energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings, alterations and additions) 6( I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: EABPRJB8816894 (Not required for 1&2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FR M TH PPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME: Carlos DeSaracho, AIA SIGNATURE 2 � PHONE#:972.233.0400 EMAIL: ` ❑ CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL 1 THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction T e://-40 Permit Valuation: Z cbo Setbacks Approval to Issue Occu anc Grou Y : 4 S• f Fire Sprinkler: YES_ NO_ Front: Electrical `( Division: Building Depth: Left: Plumbing Zoning: Building Width: Rear: Mechanical Occupancy Load: 2 ! TIo✓VS Right: Plan Review Date:o- Building Permit Fee: (.0 Site Plan Approval: j Date: Plan Review Fee: ire Department: 3 Date: o Lot Drainage Fee: I3l Public Works Departments Date: Sewer Availability Rate: Health Department: Date: Water Availability Rate: Approved for Permit: Date: Total Fees: Lot Drainage Sub Approved: Total Amount Due: PO.BOX 951W,GRAPEVINE,TX]6099(81])4103165 0,FORMMSPERMITAPPLIGATIONS s/'ia („ fy ��,,11QQ�' BUILDING --- COMMERCIAL ALTERATION GRA VINE. INE. Issue Date:September 26,2019 •1 E• S A 5`z' PROJECT DESCRIPTION:Tenant Finish-Out"The Trade Group,LLC" PROJECT# (817)410.3010 WwW.mygOV.us COMA-18-2958 Inspections Permits City of Grapevine P.O.Box 95104 — LOCATION TENANT LEGAL Grapevine,TX 76099 2900 Genesis Way The Trade Group, LLC No.586James Gibson Survey (817)410-3165 Voice Grapevine,TX 76051 Tr 2j (817)410-3012 Fax CONTRACTOR INFORMATION Bob Moore Construction,Inc. *CONDITIONAL USE REQUIRED? NO 1110 N.Watson Rd. CONSTRUCTION TYPE II-B Arlington,TX 76011 OCCUPANCY GROUP g/g1 (817)640-1200 Phone (817)640-1250 Fax *OCCUPANCY LOAD 1021 (817)994-3953 Mobile *ZONING DISTRICT BP **NAME OF BUSINESS The Trade Group OWNER **APPLICANT NAME Carlos DeSaracho,AIA **APPLICANT PHONE NUMBER 972-233-0400 143 Ip Lp *SITE PLAN/SPECIAL USE/CU? 434 Patton PI Ste 190 YES SP17-19 Carrollton,TX 75007 1)Certified Energy Code Inspected YES 2)Accessibility Review YES AVAILABLE INSPECTIONS 3)Control Number EABPRJB8816894 � Building Framing(required) � Building Bracing/Sheathing(required) 4)Asbestos Survey NO f Building Energy Code(required) Acreage � Final Fire Dept Inspection(required) APPROVED TO ISSUE ELECTRIC YES � Building Final(required) APPROVED TO ISSUE HOOD NO APPROVED TO ISSUE MECHANICAL YES APPROVED TO ISSUE PLUMBING YES County Tarrant Fire Sprinkler System? YES Square Footage 184660 VALUATION 5200000 What is use of Building/Structure? Office/Warehouse Zoning BP-Business Park FEES TOTAL=$12,023.56 *Building Permit Fee(Value) $ 12,023.56 PAYMENTS TOTAL=$12,023.56 MYCON General Contractors, Inc. (Charles R. Myers) Cash on 0910612018 ($27,327.71) Note:EXEMPT-FOR RECORDS ONLY MYCON General Contractors, Inc. (Charles R. Myers) $27,327.71 Payment Voided Cash on 0910612018 MYGOV.Us City of Grapevine I BUILDING---COMMERCIAL ALTERATION I COMA�18.29581 Printed 09126h9 at 8:12 a.m. Page 1 of 3 t7{ j BUILDING --- COMMERCIAL ALTERATION Gll.yP,t�'1 Issue Date:September 26,2019 ' PROJECT DESCRIPTION:Tenant Finish Out"The Trade Group" p p a'7 E. \ t �" p"[Referto permit l8-1818 for inspection data.Field inspector did not enter inspection results on permit 18-2958 so files are being merged.This file being archived to retain information,fee amounts paid 8 waived.$84.00 revision fee due on this project. '� Transferred fee due to 18-1818 so this could be archived] PROJECT# (817)410-3010 www.mygov-us City of Grapevine COMA-18-2958 Inspections Permits P.O.Box 95104 Grapevine,TX 76099 (817)410-3165 Voice LOCATION TENANT LEGAL (817)410-3012 Fax 2900 Genesis Way The Trade Group,LLC The Trade Group Blk 1 Lot 1 Grapevine,TX 76051 No.586James Gibson Survey Tr 2j CONTRACTOR INFORMATION Bob Moore Construction, Inc. *CONDITIONAL USE REQUIRED? NO 1110 N.Watson Rd. *CONSTRUCTION TYPE II-B Arlington,TX 76011 *OCCUPANCY GROUP B/S1 (817)640-1200 Phone (817)640-1250 Fax *OCCUPANCY LOAD 1021 (817)994-3953 Mobile `ZONING DISTRICT BP **NAME OF BUSINESS The Trade Group **APPLICANT NAME Carlos DeSaracho,AIA OWNER 2nd Ip Lp **APPLICANT PHONE NUMBER 972-233-0400 1434 Patton PI Ste 190 *SITE PLAN/SPECIAL USE/CU? YES SP17-19 Carrollton,TX 75007 1)Certified Energy Code Inspected YES 2)Accessibility Review YES AVAILABLE INSPECTIONS 3)Control Number EABPRJB8816894 Building Framing(required) 4)Asbestos Survey NO � Building Bracing/Sheathing(required) Building Energy Code(required) Acreage Final Fire Dept Inspection(required) APPROVED TO ISSUE ELECTRIC YES Building Final(required) APPROVED TO ISSUE HOOD NO APPROVED TO ISSUE MECHANICAL YES APPROVED TO ISSUE PLUMBING YES County Tarrant Fire Sprinkler System? YES Square Footage 316576 VALUATION 5200000 What is use of Building/Structure? Office/Warehouse Zoning BP-Business Park FEES TOTAL=$12,023.56 *Building Permit Fee(Value) $12,023.56 PAYMENTS TOTAL=$12,023.56 MYCON General Contractors, Inc. (Charles R. Myers) Cash on 0910612018 ($27,327.71) Note:EXEMPT-FOR RECORDS ONLY MYCON General Contractors, Inc. (Charles $27,327.71 MYGOV.US City of Grapevine l BUILDING---COMMERCIAL ALTERATION I COMA-18-29581 Printed 08/11/20 at 9.50 a.m. Page l of Note:EXEMPT-FOR RECORDS ONLY MYCON General Contractors, Inc. (Charles R.Myers) Cash on 1111312018 ($15,304.15) Note:PREVIOUS ENTRIES INCORRECT. ONLY PARTIAL CREDITS MYCON General Contractors, Inc. (Charles R. Myers) Payment Voided Cash on 1111312018 $15,304.15 Note:RE-ADJUST PREVIOUS CREDITED FEES DUE TO PW CREDITS Bob Moore Construction, Inc. (Larry Knox) Check on 09/26/2019 ($12,023.56) Note:CK#3000 NOTICES 1)ALL work must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE, 2)A copy of the signed permit and approved plans must be on site at all times. 3)The project address must be clearly posted at the job site. READ AND SIGN I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City of Grapevine.I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL A ENGV-(&. Signature j pyty MYGOVDS City of Grapevine.I BUILDING---COMMERCIAL ALTERATION I COMA-18-2958 I Printed 09/26119 at 8:12 a.m. Page 2 of 3 Texas Department of Licensing and Regulation OFFICE COPY Architectural Barriers Project Registration Confirmation Page Thursday, May 10, 2018 EABPRJB8816894 PERSON FILING FORM Name: Robert Bryant Phone: 972-233-0400 Person Address: 1600 N. Collins Blvd.Suite#1000, Richardson,TX 75080 Ras Number: 140 Project Name: The Trade Group Project Address: The Trade Group Grapevine, TX 76051 County: Tarrant TENANT Contact Name: Phone: Contact Address: BUILDING/FACILITY Name: The Trade Group FACILITY Owner:The Trade Group Phone:214-343-2000 Owner Address: 1434 Patton Place#190, Carrollton, tx 75007 Contact Name: Chris Stone Phone: Contact Address: Contact Email: DESIGN FIRM Name: Allliance Architects Phone: 972-233-0400 Firm Address: 1600 N. Collins Blvd. Suite#1, Richardson,tx 75080 Designer Name: Carlos deSaracho, AIA Emai: Type of License:Architect License Number: 14677 PROJECT DESCRIPTION Start Date: 07/2018 Completion date: 02/2019 Estimated Cost: $16,000,000.00 Type of Work: New Construction Type of Funds: This project is privately funded, on private land for private use. Are the private funds provided by a tenant?Yes State Lease No. : Scope of Work: New Concrete tilt-up building Does this building(s)have more than one level?Yes Are there any elevators,escalators, or platform lifts in this building?Yes Are there any boiler in this building?No This AB Project registration Confirmation Page, construction documents, and applicable fees must be submitted in accordance with the Texas Administrative Code Chapter 68, Rule 68.51. If TDLR will be performing the review or inspection services, see Rule 68,80. If a RAS will be performing the review or inspection services, please contact the RAS as they set and collect their own fees, see Rule 68.75. In accordance with Rule 68.52, the owner of a building or facility must also obtain an inspection from the department or a registered accessibility specialist not later than the first anniversary of the completion of construction. Request for inspection shall be made by completing the Request for Inspection form and submitting it no later than 30 calendar days after the completion of construction. -aR 5 JUL " 11�1 OFFICE COPY BUILDING CODE REVIEW SUMMARY AND CHECKLIST TO BE COMPLETED BY PLANS EXAMINERS ADD RESSS,-2 DATE 7-31-f6 NEW CONSTRUCTION _ . RENOVATION ALTERATION JS/yf �pe ADDITION TENANT FINISH OUT HISTORIC ZONING DISTRICT PERMITTED USE YES .� NO / CONDITIONAL USE: YES ✓ NO_ SPECIAL USE: YES_ NO_ SITE PLAN: YES ✓IVO_ PERMIT#'/ 245g DATE LOCATION ON PROPERTYA//A.- E�C�sT� EXTERIOR WALL(S) RATING: NORTH HR EAST HR SOUTH HR WEST HR DISTTO PROP LINE (FEET) N E S W REQUIRED YES NO HR RATING HORIZ VERT USE AND OCCUPANCY OCCUPANCY CLASSIFICATION Group Division Group S Division I Group Division Group Division Group Division Group Division Group Division Group Division Group Division Fire Sprinkler YES ✓ NO Required YES_✓NO Fire Alarm YES .'NO_ Required YES 'ENO SPECIAL OCCUPANCIES Special Occupancies Yes No- tl,-� Group Division Group Division Group Division OCCUPANCY SEPARATIONS REQUIRED YES NO_/ HR RATING HORIZ VERT NON-SEPARATED USES YES_ NO SEPARATED USES YES NO DEMISING WALL_ PARTY WALL TENANT SEPARATION MAXIMUM ALLOWABLE FLOOR AREA% F,,cj'57GG Maximum Allowable Floor Area per Table + Area Increase + Sprinkler increase = Total Maximum Height including increases MAXIMUM ALLOWABLE BUILDING HEIGHTNA IF;,(, T"!.4 Maximum Allowable Height per Table +Story Increase + Sprinkler increase = Total Maximum Height including increases INCREASES Frontage Sprinklers Unlimited Area NUMBER OF STORIES: SEPARATED USES UNITY FORMULA CONSTRUCTION TYPE Type of Construction: Type IA Type IB Type IIA Type IIB ✓ Type IIIA Type IIIB Type IV— Heavy Timber_Type VA Type VB Protected: Unprotected: FIRE RESISTIVE CONSTRUCTION Required: Yes_ No�FW_ FB, Shaft Openings Opening Area Allowed Per Table Rated Opening FIRE WALL FIRE BARRIER SMOKE PARTITION OCCUPANTLOAD . TOTAL SQUARE FOOTAGE 192.d 6 ALTERED SC. FTG: SQUARE FOOTAGE OF USE/OCCUPANT LOAD FACTOR = OCCUPANT LOAD FOR BUILDING Group J3 Division��l77 m/ /00 = —• Group .� DivisionG_pL//G0 547. Group Jc� Division Group Division Group Division / _ Length of pews/benches # of Fixed Seating # of Booths TOTAL OCCUPANT LOAD - I®Z l EXITING AT GRADE: Number of Exits Required 3 Number of Exits Provided 46 a Total Exit Width Required �204 ;z ` Total Exit Width Provided OTHER FLOORS: ,��co�/� CONVERGENCE: Number of Exits Required 7i Number of Exits Provided Total Exit Width Required Total Exit Width Provided 7 OCCUPIED ROOFS: Number of Exits Required Number of Exits Provided Total Exit Width Required Total Exit Width Provided OA-- Correct Placement 45>1' % Diagonal served 1/3 Diagonal Served ,i Correct Swing of Exit Doors ES Door Landings XF5 Length -ff'IWidth .44 Hardware: Panic or Fire Exit Accessible N/A Travel Distance © Common Path Occupancy Type SS• Stairs Yes No Rise/Run Rails Guards Landing Rated Shaft_ Rated Openings Penetrations Width Height INTERIOR ENVIRONMENT A'/OT,Ic�Gv./ i✓LkNS Floor/Wall Coverings: Flame-spread Smoke Index RESTROOMS J�G7�0 an/ PA4W S Impervious Floor Coverings: Yes_ No_ Impervious Wall Coverings: Yes— No / REQUIRED SPECIAL INSPECTIONS Steel ✓ Welding'High-strength bolts Details ✓ Concrete Materials Masonry_Wood Soils Pile foundations Pier foundations Sprayed fire- resistant materials Density_Bond strength. Mastic and intumescent fire-resistant coatings_Exterior insulation and finish systems (EIFS) Special inspection for smoke control 0 her Notes: Ar I ALL Ir-f aw ,- s ✓16fcc.� PX /a1 /1GtoftOd.�/Gf /v/ry oA AEv AAfar ,.f tic /ate+ o� /� s� ��v-� / � ,4s :5rt•c�iPfOarr/ 61.�.✓S /�1yk7F/f�iaOT /20 CC) /t/d WA. tit 4 r-c%f Pt-04 Ala, o✓L G I-a rG/e!�g .deal GO,,eaWkGc-- Vwf �Ai✓��iO l ���N%7 �0 2 r--AfOvFGIA10 GGewva---1 _ SHid/5 1%ov zA �jc /7"" �r��G%r�/E�-. .fff QJ" ^ � (c( oca--T7o,✓ S / A4 S[l¢l.,G fll GGo.�O.�i�lG� /�//77 / i'(5.�� /7 t Zo/ Qa Oid-5 LiAWfe, Rises / �fi 6 Alp — o C/ pP i1f/lam f/F.ST��' / i/ L nt/Er c!/.V Oi.K//6F /6 r3�uJr/ E�C�i.Fus!?�2.ui .r-4rl��u �.clO/�•t!7 /rlT,aG s��/���/..✓� /sk/Tri Biriioi.✓L_ l - MAY 8 2019 BOB MOORE CONSTRUCTION, INC. 1110 N. WATSON ROAD ARLINGTON, TX 76011 (817) 6 -1200 FAX (817) 640-1250 C1 May 8, 2019 Mr. Don Dixson City of Grapevine y 200 S. Main Street Grapevine, TX 76051 RE: Request for 180-day extension Permit 18-2958 2900 Genesis Way Dear Mr. Dixson, The referenced interior finishout permit is due to expire on or about May 12, 2019. On behalf of the property owner Trade Group, due to delays in closing on the loan for construction financing, we request a one-time 180-day extension. Please let me know if you have any questions or require additional information. Regard RickpfeiI Senior Project Manager Bob Moore Construction, Inc. c.c. Guita McIlroy David Hurst COMcheck Software Version 4.0.6.2 Envelope Compliance Certificate OFFICE COPY Project Information Energy Code: 2015 IECC Project Title: The Trade Group Location: Grapevine, Texas Climate Zone: 3a Project Type: New Construction Vertical Glazing/Wall Area: 17% Construction Site: Owner/Agent: Designer/Contractor: Grapevine,TX Chris Stone Carlos deSaracho,AIA The Trade Group Alliance Architects Grapevine,TX 1600 N. Collins Blvd. Suite #1000 Richardson,TX 75080 972-233-0400 Building Area Floor Area 1-Office: Nonresidential 34224 Additional Efficiency Package High efficiency HVAC.Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist report. Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factors.) Perimeter Floor 1:Slab-On-Grade:Unheated,[Bldg. Use 1 -Office](c) 1075 --- --- 0.730 0.730 Roof 1: Insulation Entirely Above Deck,High Albedo Roof Exemption= 34224 --- 30.0 0.032 0.039 Performance data not applicable or available,[Bldg.Use 1 -Office] NORTH Insulated Panels:Solid Concrete:9"Thickness,Normal Density,Furring: 1901 --- 10.0 0.084 0.123 None,[Bldg.Use 1 -Office] Window 1:Metal Frame:Fixed,Pont.Specs.:Product ID Solarban 60, 1274 -- --- 0.400 0,460 trifab 451T,SHOO 0.29, PF 0.22,VT 0.53,[Bldg. Use 1 -Office](b) Exterior Wall 3:Solid Concrete:9"Thickness,Normal Density,Furring: 3047 19.0 0.0 0.127 0.123 Metal,[Bldg. Use 1 -Office] Window 2:Metal Frame:Fixed, Pert.Specs.:Product ID Solarban 60, 445 -- --- 0.400 0.460 trifab 451T,SHGC 0.29,PF 0.22,VT 0.53,[Bldg.Use 1 -Office](b) Door 1:Insulated Metal,Swinging,[Bldg.Use 1 -Office] 21 -- -- 0.500 0.610 Semi-Exterior Wall 4:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 1573 19.0 0.0 0,094 0.064 EAST Exterior Wall 2:Solid Concrete:9"Thickness, Normal Density,Furring: 211 19.0 0.0 0.127 0.123 Metal,[Bldg.Use 1 -Office] Semi-Exterior Wall 1:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 3391 19.0 0.0 0.094 0.064 Door 2:Insulated Metal,Swinging,[Bldg. Use 1 -Office] 42 -- -- 0.500 0.610 Project Title: The Trade Group Report date: 07/27/18 Data filename: N:\dgn\q-t\Trade Group 17181\III_DesignW_Documentation\1_COMCheck\The Trade Group Page 1 of 9 Interior-2105 I ECC.cck JUL 31201[; Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factorm Perimeter Semi-Exterior Wall 3:Steel-Framed,24"o.c.,[Bldg. Use 1-Office] 3325 19.0 0.0 0.094 0.064 Semi-Exterior Wall 5:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 3819 19.0 0.0 0.094 0.064 Door 4:Insulated Metal,Swinging,[Bldg.Use 1 -Office] 84 -- --- 0.500 0.610 SOUTH Semi-Exterior Wall 2:Steel-Framed,24"o.c.,[Bldg.Use 1 -Office] 3428 19.0 0.0 0.094 0.064 Door 3: Insulated Metal,Swinging,[Bldg.Use 1 -Office] 21 -- --- 0.500 0.610 Exterior Wall 4:Solid Concrete:9"Thickness,Normal Density,Furring: 1343 19.0 0.0 0.127 0.123 Metal,[Bldg.Use 1 -Office] Exterior Wall 5:Solid Concrete:9"Thickness,Normal Density,Furring: 2214 --- 10.0 0.084 0.123 None,[Bldg.Use 1-Office] Window 3:Metal Frame:Fixed,Pert.Specs.:Product ID Solarban 60, 494 --- --- 0.400 0.460 trifab 451T,SHGC 0.29,PF 0.22,VT 0.53,[Bldg.Use 1 -Office](b) Door 5:Glass(>50%glazing):Metal Frame,Entrance Door, Perf. 21 --- --- 0.400 0.770 Specs.:Product ID Solarban 60,trifab 451T,SHGC 0.29,PF 0.22,VT 0.53,[Bldg. Use 1 -Office)(b) WEST Exterior Wall 6:Solid Concrete:9"Thickness,Normal Density,Furring: 11043 -- 10.0 0.084 0.123 None,[Bldg.Use 1 -Office] Window 4:Metal Frame:Fixed,Perf.Specs.:Product ID Solarban 60, 3628 --- --- 0.400 0.460 trifab 451T,SHGC 0.29,PF 0.22,VT 0.53,[Bldg.Use 1 -Office](b) Door 6:Glass(>50%glazing):Metal Frame, Entrance Door,Pert. 42 -- -- 0.400 0.770 Specs.:Product ID Solarban 60,trifab 451T,SHGC 0.29,PF 0.22,VT 0.53, [Bldg.Use 1 -Office](b) (a) Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c) Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope PASSES: Design 3% better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented In this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4 6.2 an o comply with any applicable mandatory requirements listed In the Inspection Checklist. Robert Bryant - Project Coordinator 7/27/18 Name-Title Signat Date Project Title: The Trade Group Report date: 07/27/18 Data filename: N:\dgn\q-t\Trade Group 17181\III—Design\A_Documentation\1—COMCheck\The Trade Group Page 2 of 9 interior-2105 IECC.cck °FFICEMPV Transmittal ALLIANCE Project: Trade Group, Permit#18-2958 Project No.: 17181 Date: 08/24/18 To: Mr. Don Dixson,Jr. City of Grapevine 200 S. Main Street Grapevine, Texas 76051 Phone: 123.456.7890 Items Transmitted: El originals ❑ Specifications ❑ Proposal 0 Prints ❑ Shop Drawings ❑ Other. ❑ Reproducible ❑ Samples Ouantity Date Description 08/24/18 Response Letter to Permit Review Comments 3 Associated Revised Drawings based on review comment responses Mr Dixson, Thank you for your review commets on the above project. I have included three copies of the revised drawings. If all comments are approved, please let me know and we will send you three full sets of drawings for you to stamp approved for construction and issue to the Contractor for their use. Thanks again for your help and we look forward to working with the City of Grapevine on this project. Carlos A. deSaracho,AIA Principal Alliance Architects, Inc. ❑ Overnight O Courier ❑ Mail ❑.Hand Delivery ❑ Fax/pages: Sent By: Carlos A. deSaracho, &A cc: Principal Alliance Architects,Inc. 1 1600 N,Collins Boulevard Suite 1000 I Richardson,Texas 75080 1 9722U0400 1 www.alliancearch.com OFRCECM ALLIANCE Architecture Interiors Master Planning Project Management August 24, 2018 Mr. Don Dixson,Jr. Assistant Building Official City of Grapevine Grapevine Development Services 200 S. Main St. Grapevine, Texas 76051 Re: 2900 Genesis Way—The Trade Group— Permit#18-2958 Dear Mr. Dixson, We are in receipt of the Building Permit review comments for the Tenant Finish-out portion of the above referenced project. Thank you for your time in reviewing the project and providing us with the attached comments. Below you will find our response to the items noted for your review. SPECIFIC COMMENTS: P EASE NOTE THAT THERE ARE SEVERAL CITY DEPARTMENTS INVOLVED IN THE RELEASING OF THE PERMIT FOR ISSUANCE. DEVELOPMENT SERVICES PLAN REVIEW MAY BE COMPLETE, BUT THERE MAY BE HOLDS FROM OTHER DEPARTMENT REVIEWS. 11 ESPONSE: Understood 2. REVIEW OF THE RESPONSE TO COMMENTS DOCUMENT SUBMITTAL MAY TAKE UP TO 10 BUSINESS DAYS TO COMPLETE. .RESPONSE: Understood 63. SHEET IA 2.01 —THERE ARE MULTIPLE NON-COMPLIANT AREAS WITH THE COMMON PATH OF EGRESS TRAVEL. THE COMMON PATH OF EGRESS SHALL BE IN ACCORDNACE WITH 2O06 IBC SECTION 1014.3ISI,00REQUIRED. RESPONSE: Please refer to attached sheets LS 1, LSP2 and IA2.01. 4. ALL HORIZONTAL SLIDING DOORS SHALL BE IN ACCORDANCE WITH 2O06 IBC SECT 1008.3.3. � RESPONSE: Please refer to sheet IA6.01 `5�_ANY ACCESS CONTROLLED EGRESS DOORS SHALL BE IN ACCORDANCE WITH 2006 IBC SEC. 1008.1.3.4. RESPONSE: Please refer to sheet IA6.01. // 'd. JPECIAL INSPECTIONS ARE IDENTIFIED ON THIS PROJECT AND SHALL BE IN ACCORDANCE WITH 2O06 IBC SEC 1704.1. ADD NOTE REGARDING SPECIAL INSPECTIONS TO SHEET S-8; SPECIFYING THE APPLICABLE SPECIAL INSPECTION ITEMS INDIVIDUALLY. REVISION REQUIRED RESPONSE: Understood Alliance Architects,Inc. 11600 N.Collins Boulevard,Suite 1000 1 Richardson,Texas 75080 1972.233.0400 1 August 24,2018 Mr.Don Dixson Page 2 of 3 7. SHEET S1.5 THERE APPEARS TO BE A CONFLICT WITH THE NORTH POINT ARROW BETWEEN THIS SHEET AND SHEET IA2.01. CLARIFY. RESPONSE: Please refer to revised sheet S1.5. 8. SUMP PUMP PIPING IS PROHIBITED IN THE ELEVATOR SHAFT IN ACCORDANCE WITH 2006 IPC SEC 301.6. REVISION REQUIRED. F/j. /RESPONSE: This has been corrected per telephone conversation with City of Grapevine. . SHEETS P100 AND P101 —ADD NOTE FOR END OF LINE CLEAN-OUTS. REVISION REQUIRED. RESPONSE: Please refer to revised sheets P100 and P101. e!:::)lL- 10. SHEETS P100 AND P101 —ADD NOTE FOR DOUBLE CLEAN-OUT WHERE SAINTAR EXITS BUILDING FOUNDATION. RESPONSE: Please refer to revised sheets P100 and P101.] 1 f. SHEET P105—SHOW LOCATION OF THE GAS METER AND LOCATION OF GAS ENTRY INTO THE BUILDING AS APPLICABLE. RESPONSE: Gas meter and entry was shown on Shell Package Drawings per telephone conversation with City of Grapevine. q6NOTE TO PLUMBING GENERAL NOTES FOR THE ELEVATOR SUMP PUMP SHALL BE IN ACCORDANCE WITH ASME 17.1. REVISION REQUIRED. RESPONSE: Note has been added to the Plumbing General Note as requested. e 13. SHEET P201 —ADD GAS LINE RISER DIAGRAM. SPECIFYING THE DIMENSION TO THE MOST REMOTE POINT OF USE. REVISION REQUIRED. RESPONSE: Please refer to revised sheet P502. V_ .� 14. ADD NOTE TO SHEET P201 SPECIFYING THE MUNIMUM DIMENSION OF 101-BETWEEN EXHAUST/PLUMBING VENT TERMINATIONS AND ANY INTAKE/OPENING INTO THE BUILDING. REVISION REQUIRED. RESPONSE: Please refer to revised sheet P201. GENERAL COMMENTS: 1. SHEET TAS—ADD NOTE THAT TAS REVIEW/INSPECTION/APPROVAL IS BY A THIRD PARTY INSPECTION FIRM LICENSED BY THE STATE OF TEXAS—TDLR. RESPONSE: We have contracted with Code Solutions, Ms. Connie Fleming, R.A.S.#140, y to perform the TAS review/inspection/approval for this project. AL 2. L EGRESS DOORS ARE TO BE OPENABLE FROM DIRECTION OF EGRESS WITHOUT THE USE OF KEY, SPECIAL EFFORT OR KNOWLEDGE. PROVIDE HARDWARE INFORMATION ON COMMENTS FOR DOOR SCHEDULE. RESPONSE: Please refer to sheet IA6.01. 61L 3. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT PERMITTED. RESPONSE: Please refer to sheet IA6.01, no flush /surface bolts are being specified or J used or, this project, 4.THE PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2015 IECC. VERIFICATION OF COMPLIANCE SHALL BE SUBMITTED TO THE CITY BY AN ICC CERTIFIED ENERGY CODE INSPECTOR PRIOR TO THE ISSUANCE OF BUILDING FINAL APPROVAL OR CERTIFICATE OF OCCUPANCY. RESPONSE: Understood Alliance Architects,Inc. I 1600 N.Collins Boulevard,Suite 1000 1 Richardson,Texas 75080 1972.233.0400 1 August 24,2018 Mr.Don Dixson Page 3 of 3 09- 5. ALL CHANGES FROM THE CITY APPROVED PLANS WILL REQUIRE REVISED PLANS SUBMITTED AND ADDITIONAL REVIEW FEES DUE. RESPONSE: Understood If you have any questions or require any additional information, please do not hesitate to contact me at either 972-900-9984, or by email at Again, thank you to you and your team for the above comments and we look forward to working with you on this project. incerety, Carlos A. dISaracho, Principal Alliance Architects, Inc. Cc: Enclosures: Alliance Architects,Inc- 1 1600 N.Collins Boulevard,Suite 1000 1 Richardson,Texas 75080 1972.233.0400 I w aNancearch.conn ,,'RAPE City of Grapevine Building Inspection Department Plan Review Comments P.O. Box 95104 Phone: (817) 410-3129 Grapevine, Texas 76051 Fax: (817) 410-3536 NAME OF PROJECT: THE TRADE GROUP PERMIT # 18-2958 ADDRESS: 2900 GENESIS WAY REVIEW DATE: 8/10/18 ASSISTANT BUILDING OFFICIAL: DONALD DIXSON JR NUMBER OF STORIES: TWO TOTAL SQ. FT: 184660 ZONING: OCCUPANCY: B/S-1 OCCUPANT LOAD: 1021 EXITS REQUIRED: 3 FIRE SPRINKLERED: YES CONSTRUCTION TYPE: II-B CU: SP 17-19 SPECIFIC COMMENTS: 1. PLEASE NOTE THAT THERE ARE SEVERAL CITY DEPARTMENTS INVOLVED IN THE RELEASING OF THE PERMIT FOR ISSUANCE. DEVELOPMENT SERVICES PLAN REVIEW MAY BE COMPLETE, BUT THERE MAY BE HOLDS FROM OTHER DEPARTMENT REVIEWS. 2. REVIEW OF THE RESPONSE TO COMMENTS DOCUMENT SUBMITTAL MAY TAKE UP TO 10 BUSINESS DAYS TO COMPLETE. 3. SHEET IA 2.01 —THERE ARE MULTIPLE NON-COMPLIANT AREAS WITH THE COMMON PATH OF EGRESS TRAVEL. THE COMMON PATH OF EGRESS SHALL BE IN ACCORDNACE WITH 2O06 IBC SECTION 1014.3. REVISION REQUIRED. 4. ALL HORIZONTAL SLIDING DOORS SHALL BE IN ACCORDANCE WITH 2O06 IBC SECT 1008.3.3. 5. ANY ACCESS CONTROLLED EGRESS DOORS SHALL BE IN ACCORDANCE WITH 2006 IBC SEC. 1008.1.3.4. 6. SPECIAL INSPECTIONS ARE IDENTIFIED ON THIS PROJECT AND SHALL BE IN ACCORDANCE WITH 2O06 IBC SEC 1704.1. ADD NOTE REGARDING SPECIAL INSPECTIONS TO SHEET S-8; SPECIFYING THE APPLICABLE SPECIAL INSPECTION ITEMS INDIVIDUALLY. REVISION REQUIRED 7. SHEET S1.5 THERE APPEARS TO BE A CONFLICT WITH THE NORTH POINT ARROW BETWEEN THIS SHEET AND SHEET IA2.01. CLARIFY. 8. SUMP PUMP PIPING IS PROHIBITED IN THE ELEVATOR SHAFT IN ACCORDANCE WITH 2O06 IPC SEC 301.6. REVISION REQUIRED. 9. SHEETS P100 AND P101 —ADD NOTE FOR END OF LINE CLEAN-OUTS. REVISION REQUIRED. 10. SHEETS P100 AND P101 —ADD NOTE FOR DOUBLE CLEAN-OUT WHERE SAINTAR EXITS BUILDING FOUNDATION. 11. SHEET P105 —SHOW LOCATION OF THE GAS METER AND LOCATION OF GAS ENTRY INTO THE BUILDING AS APPLICABLE. 12. ADD NOTE TO PLUMBING GENERAL NOTES FOR THE ELEVATOR SUMP PUMP SHALL BE IN ACCORDANCE WITH ASME 17.1. REVISION REQUIRED. 13. SHEET P201 —ADD GAS LINE RISER DIAGRAM. SPECIFYING THE DIMENSION TO THE MOST REMOTE POINT OF USE. REVISION REQUIRED. 14. ADD NOTE TO SHEET P201 SPECIFYING THE MUNIMUM DIMENSION OF 10'- BETWEEN EXHAUST/PLUMBING VENT TERMINATIONS AND ANY INTAKE/OPENING INTO THE BUILDING. REVISION REQUIRED. GENERAL COMMENTS: 1. SHEET TAS —ADD NOTE THAT TAS REVIEW/INSPECTION/APPROVAL IS BY A THIRD PARTY INSPECTION FIRM LICENSED BY THE STATE OF TEXAS—TDLR. 2. ALL EGRESS DOORS ARE TO BE OPENABLE FROM DIRECTION OF EGRESS WITHOUT THE USE OF KEY, SPECIAL EFFORT OR KNOWLEDGE. PROVIDE HARDWARE INFORMATION ON COMMENTS FOR DOOR SCHEDULE. 3. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE NOT PERMITTED. 4. THE PROJECT SHALL BE DESIGNED TO COMPLY WITH THE 2015 IECC. VERIFICATION OF COMPLIANCE SHALL BE SUBMITTED TO THE CITY BY AN ICC CERTIFIED ENERGY CODE INSPECTOR PRIOR TO THE ISSUANCE OF BUILDING FINAL APPROVAL OR CERTIFICATE OF OCCUPANCY. 5. ALL CHANGES FROM THE CITY APPROVED PLANS WILL REQUIRE REVISED PLANS SUBMITTED AND ADDITIONAL REVIEW FEES DUE. Please review comments and have designers add all review comments, required information and created changes, all clouded within NEW PLAN SETS. Please provide three copies of corrected complete sets of plans. Plan size may not exceed 36" in any dimension. A copy of this plan review letter with designer responses shall accompany the "response to comments" sets of drawings. Provide one set to city that is bolted if plans are over 10 pages. Thank you for your time and consideration. APPLICATION RECEIVED: 7/31/18 1ST COMMENTS: 8/10/18 REVISIONS RECEIVED: REVISIONS REVIEWED: PERMIT ISSUED: Vicki Hecko From: Vicki Hecko Sent: Monday, August 26, 2019 9:10 AM To: Morgan Mueller Subject: RE: Receipt with Estimate - 2900 Genesis Way 9/6/2018 - Message was left with Carlos DeDSaracho,AIA/ Mycon General Contractors, Inc. that this permit is ready for pick up. Computer records currently indicate that Bob Moore Construction, Inc. is Contractor on this permit. Permit Fee Due -$12,023.56 Vicki Hecko Building Inspections City of Grapevine 817-410-3166 From: Morgan Mueller [mailto:morgan@jdkinc.com] Sent: Monday, August 26, 2019 8:09 AM To:Vicki Hecko < Subject: RE: Receipt with Estimate -2900 Genesis Way Vicki, Can you give me a status update on the approval of this permit, or point me to the person who can update me? Thank you, Morgan Mueller Operations Manager i JDK Associates, Inc. 2425 W. Ammann Rd. Bulverde, TX 78163 Ph: (830) 980-4037 From: Vicki Hecko < Sent:Wednesday, August 21, 2019 2:22 PM To: Morgan Mueller< Subject: Receipt with Estimate -2900 Genesis Way Please see attached. Vicki Hecko Building Inspections City of Grapevine 817-410-3166 1