Loading...
HomeMy WebLinkAboutIA2020-2077 7� 1 3LD DATE OF ISSUANCE: ✓y PERMIT#: BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY-COMPLETE ENTIRE FORM) JOB ADDRESS: /IO D E. SUITE # LOT: BLOCK: SUBDIVISION: BUILDING CONTRACTOR(company name): - Tk CURRENT MAILING �- Tr t n 1 '5'. A /80 CITY/STATE/ZIP: l0'e Tx 7(0/55 PH:#bq-(,3$_QSZ5 Fax# 214- 639-05-Z8 PROPERTY OWNER: er .+4er. '7 CURRENT MAILING ADDRESS: 2✓�-Q ) S ,9V D•A /, CITY/STATE/ZIP: D� � I X /52(p l PHONE NUMBER: 40 !cy - o 9?iCO�; PROJECT VALUE: $ ��, 0d� FIRE SPRINKLERED? YES NO _ WHAT TRADES WILL BE NEEDED?(Check Goes that apply)ELECTRIC_ PLUMBING MECHANICAL I? DESCRIPTION OF WORK TO BE DONE: �rn0 Andre -Pduvr Cone 4C 'In f7wr k.r g oT USE OF BUILDING OR STRUCTURE: NAME OF BUSINESS: N /A v Total Square Footage under roof: Square Footage of alteratiou/additiou: /8 N�(Q I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with I� State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings, alterations and additions) I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for I&2 family dwellings) I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE AP ROPRLITE STATE AND OR FEDERAL AGES CY_�}S.{)� f I / PRINT NAME: pce I 1 l�G A-'d SIGNATURE zof PHONE#:p U 11 - 312- 918'4 E CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Type: I& Permit Valuation: $ Of/O — Setbacks Approval to Issue Occupancy Grou Fire Sprinkler: YES NO Front: Electrical Division: Building Depth: Left: Plumbing Zoning: Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review Approval: Date: Building Permit Fee: �7a ,7 Site Plan Approval: Date: Plan Review Fee: �7 Fire Department: Date: -92-20 Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Health Department: Date: Water Availability Rate: Approved for Permit: _ Date: -1720 Total Fees: 20, Lot Drainage Submitted/' Approved: Total Amount Due: , '7.S P.O.BOX 951M,GMPE NE.TX 7099(817)610.3165 O:FORM5IOSPERMITPPPMGTION31ro2-Ray.11101,We6,LW,flro9,HH FAST=TRAK CONSTRUCTION, INC. Management*Design*Construction Permit#IA-20-2077 8/26/2020 Attu. Vicki Hecko Ms. Hecko, our customer has decided not to complete this project at this time (permit# IA-20-2077), this is the concrete work at 1100 E. Dallas Road. We applied for this permit, but we've never paid for it, at this time we are requesting that you cancel this permit& please provide us a confirmation that it has been removed from your system. If we are to complete this project in the future, we will apply for a new permit. Thank you, Brett Leedy Project Manager Fast Trak Construction, Inc. 14500 Trinity Blvd. Suite 180 0 Fort Worth,TX 761557 ♦ 214.638.0525 Phone ♦ 214.638.0528 Fax