Loading...
HomeMy WebLinkAboutItem 19 - Roof ReplacementILYA 1:4 jyj [*]I 1[0� M [01ij, IS] ZfA FROM: BRUNO RUMBELOW, CITY MANAGER SUBJECT: APPROVAL •I A RESOLUTION FOR A ROOF REPLACEMENT CONTRACT FOR THE WATER TREATMENT CHEMICAL BUILDING City Council to consider approval of a resolution for a roof replacement contract for the water treatment chemical building with Weatherproofing Technologies, Inc. through an established Cooperative Agreement with The Cooperative Purchasing Network (TCPN). Funding for this purchase is currently available in account 200-43360-534-0 (Water Supply Infrastructure & Maintenance) for a total amount not to exceed $25,608.49. This purchase will be made in accordance with an existing Cooperative Agreement with The Cooperative Purchasing Network (TCPN) as allowed by Texas Local Government Code, Section 271.102, Cooperative Purchasing Program. Bids were taken by the cooperative and a contract was awarded to Weatherproofing Technologies, Inc. The Facilities staff and Purchasing reviewed the contract for specification compliance and pricing and determined that the contract would provide the best product, service and pricing for meeting the needs of the City. The contractor will: - Setup safety equipment and protection for work area over chemical building and treatment area. - Tear -off existing BUR roof and metal flashings to existing perlite insulation and place in dumpster. - Repair/replace any damaged insulation. - Install a 1/2" dens deck cover board with fastener's to original metal deck per FMG 1-90. 7/18/2014 10:56:32 AM - Replace bad wood nailer or add wood nailer where needed to a minimum of 8" above roof line. - Install a single ply fully adhered TPO 60 mil. - Install new perimeter NRCA flashing detail. - Install Alphaguard base/mat and top coat on all scupper details and brick ledge below block parapet wall. - Remove/grind all loose mortar joints on coping and parapet wall and install new matching mortar and caulk as needed. - Inspect and repair any damaged, loose or open laps on the metal roof areas as needed. -Two-year contractor workmanship warranty. -10 Yr. Roof Warranty. The existing roof is over 24 years old and repair costs are increasing every year due to leaks. Roofs in this area typically last around 15 - 20 years. Staff recommends approval. CH/BS 7/30/2014 1:04:46 PM RESOLUTION NO. o4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING THE CITY MANAGER OR THE CITY MANAGER'S DESIGNEE TO PURCHASE A ROOF REPLACEMENT CONTRACT FOR THE WASTE WATER CHEMICAL BUILDING THROUGH AN ESTABLISHED COOPERATIVE AGREEMENT AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City of Grapevine, Texas is a local government in the State of Texas and as such is empowered by the Texas Local Government Code, Section 271.102 to enter into a cooperative purchasing program agreement with other qualified entities in the State of Texas; and WHEREAS, The Cooperative Purchasing Network (TCPN) is a qualified purchasing cooperative program as authorized by the Texas Local Government Code; and WHEREAS, the City of Grapevine, Texas has established a Cooperative Agreement with TCPN and wishes to utilize a contract meeting all State of Texas bidding requirements; and WHEREAS, TCPN has established a contract #R5101 Job Order Contracting Services with Weatherproofing Technologies, Inc.; and WHEREAS, the City of Grapevine, Texas has a need to replace the roof on the water treatment chemical building. NOW, - •` RESOLVED BY THE CITY COUNCILOF *F GRAPEVINE,TEXAS: Section 1. That all matters stated in the above preamble are true and correct and are incorporated herein as if copied in their entirety. Section 2. That the City Council of the City of Grapevine authorizes a roof replacement contract for the water treatment chemical building from Weatherproofing Technologies, Inc. for a total amount not to exceed $25,608.49. Section 3. That the City Manager or his designee is authorized to take all steps necessary to consummate the purchase of said water treatment chemical building roof replacement. Section 4. That this resolution shall take effect from and after the date of its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 5th day of August, 2014. F."1109*1 FWAI a a W� ' �69M, I RES. NO. 2