HomeMy WebLinkAboutORD 1989-057 ORDINANCE NO. 89-57
AN ORDINANCE OF THE CITY OF GRAPEVINE,
TEXAS, AMENDING THE CODE OF ORDINANCES, BY
AMENDING APPENDIX E, ARTICLE II , STANDARD
SPECIFICATIONS FOR CONSTRUCTION--STREETS AND
DRAINAGE AND APPENDIX E, ARTICLE III,
STANDARD SPECIFICATIONS FOR CONSTRUCTION--
�"" WATER DISTRIBUTION AND SANITARY SEWER SYSTEM
RELATIVE TO UTILITY EMBEDMENT DETAIL
SPECIFICATIONS; PROVIDING A SEVERABILITY
,�,,; CLAUSE; DECLARING AN EMERGENCY AND PROVIDING
AN EFFECTIVE DATE
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE,
TEXAS:
Section 1 . That Appendix E, Articles II and III of the City
of Grapevine, Texas, relating to Standard Specifications for
Construction--Streets and Drainage and Standard Specifications
for Construction--Water Distribution System and Sanitary Sewer
System are hereby amended in the following particulars and all
other sections, subsections, paragraphs, sentences, definitions,
phrases and words of said Code of Ordinances are not amended, but
shall remain intact and are hereby ratified, verified and
affirmed.
Section 2 . That the City Code, Appendix E, Article II,
Item 7 . relative to Storm Drains is hereby amended by deleting
Item 7 . 9. entitled Pipe bedding and backfill, by renumbering
Item 7 . 10 . as Item 7 . 9 . and renumbering the remainder of Item 7.
�� accordingly, and by amending the said Item 7 . 10 . as renumbered to
7. 9. so that it shall hereafter read as follows:
"7 . 9 . Embedment and backfill within rights-of-way.
(1) Gravel meeting the gradation requirements
of Article III, Item 15 . 4 shall be placed
such that the material will be slightly
above the underside of the pipe after
compaction and to a minimum depth of six
(6) inches under the concrete pipe .
(2) After the concrete pipe has been laid and
the joints sealed, sand meeting the
gradation requirements of Article III , Item
15 . 3 . shall be placed under the haunches of
the pipe and on the sides of the pipe, in
lifts not to exceed twelve (12) inches in
depth. The sand shall be placed equally on
both sides of the pipe in order that the
pipe will not be displ'aced and, if
necessary, the pipe shall be blocked
against the sides of the trench to insure
�4� that no displacement occurs. The sand
placed under the haunches of the pipe shall
be worked into place by hand during the
time it is deposited into the trench.
After the sand has been placed adjacent to
the pipe in twelve (12) inch lifts, the
lifts shall be mechanically compacted. The
remainder of the trench shall be backfilled
with sand meeting the gradation require-
ments of Article III, Item 15. 3 . When the
distance to the edge of the trench nearest
to the existing or proposed edge of
pavement or back of curb is greater than
three (3) feet, the trench may be
backfilled to the top of the trench with
native material after the sand backfill has
been placed to a level twelve (12) inches
above the top of pipe. The native material
shall be free of clods and organic material
such as roots or tree branches. All embed-
ment and backfill shall be placed in a
maximum of twelve (12) inch lifts and
mechanically compacted to obtain a density
not less than ninety-five percent (95�) of
�� the Standard Proctor Density for sand or
gravel and ninety percent (900) of the
Standard Proctor Density for native
,�, material. The embedment and backfill is to
be wetted to approximately optimum moisture
content. Additional lifts shall not be
placed until the lift being compacted has
obtained a density of at least ninety-five
percent (95�) of the Standard Proctor
Density for sand and ninety percent (90�)
of the Standard Proctor Density for native
material. The contractor shall furnish
necessary water. "
Section 3. That the City Code, Appendix E, Article III,
Item 2 . relative to Excavating, backfill and pipe embedment is
hereby amended by amending Item 2. 7 . to read as follows:
"2 . 7 . Embedment and backfill around pipe and
structures.
Sanitary sewer pipe shall be embedded on a
minimum of six (6) inches of gravel meeting the
gradation of Article III, Item 15 . 4 . All
waterlines shall be bedded on a minimum of six
� (6) inches of sand meeting the gradation of
Article III , Item 15 . 3 . Backfill above the
embedment shall be with full depth sand which
complies with the gradation set forth in Article
III, Item 15. 3 . When the distance to the edge
of the trench nearest to the edge of existing or
proposed edge of pavement or back of curb is
greater than three (3) feet, and/or within an
easement, the trench may be backfilled to the
top of the trench with native material after the
sand backfill has been placed to a level at
least twelve (12) inches above the top of pipe.
The native material shall be free of clods and
organic material such as roots or tree limbs.
All embedment and backfill shall be wetted to
approximate optimum moisture and compacted using
mechanical methods in lifts not to exceed twelve
(12) inches and shall achieve a minimum density
of ninety-five percent (95�) of the Standard
Proctor Density for sand or gravel and ninety
percent (90$) of the Standard Proctor Density
for native material. Additional lifts shall not
be placed until the lift being compacted has
reached the required density. "
Section 4 . That the City Code, Appendix E, Article III,
Item 2 . relative to Excavation, backfill and pipe embedment is
�"' hereby amended by deleting Item 2 . 10 . relative to Pipe embedment
and material, and renumbering the remainder of Item 2.
accordingly.
Section 5 . That the City Code, Appendix E, Article III,
Item 15 . relative to Pipe embedment is hereby amended by amending
Item 15. 1 . to read as follows:
"Item 15 . Pipe embedment and backfill.
15 . 1 . General: All water, sanitary sewer and
storm drainage pipe will be installed with
sand and/or granular embedment. In some
cases, a concrete cradle or encasement will
be used, as shown on the plans and specified
herein. Sand or gravel embedment shall meet
the requirements specified herein. Should
existing soil conditions dictate different
embedment details, alternate types of
embedment may be used with approval of the
Director of Public Works. Backfill will be
� with sand meeting the requirements specified
herein or native material if the trench is
located a minimum of three (3) feet from
�,,, existing or proposed street paving or in an
easement. "
Section 6 . That the City Code, Appendix E, Article III,
Item 15 . relative to Pipe embedment and backfill is hereby
amended by amending Items 15. 3 . through 15. 5. to read as follows:
"15. 3 . Type 1, sand embedment and backfill:
Sand for embedment or backfill shall be free
flowing sand such that the material, when wet,
will not form a mud ball or tend to cling
together. The material shall follow the
gradation set forth below, with a ± 2�
allowable tolerance, and shall have a
plasticity index for that part passing the
Number 40 sieve not greater than two (2) ,
unless written approval is obtained from the
Director of Public Works.
$Wt
Retained on 3/8 inch sieve Og
� Retained on No. 4 sieve 0 - 5�
Retained on No. 8 sieve 0 - 20�
Retained on No. 16 sieve 15 - 30�
Retained on No. 30 sieve 35 - 75g
Retained on No. 50 sieve 70 - 90g
Retained on No. 100 sieve 90 - 100$
Retained on No. 200 sieve 97 - 100�
15 . 4 . Type 2, gravel embedment:
Gravel for embedment and/or encasement shall be
washed gravel ranging in size from
three-quarter (3/4) inch diameter to
one-quarter (1/4) inch diameter meeting the
gradation set forth below, with a ± 2�
allowable tolerance. The material shall be
free from clay and organic material.
$Wt
Retained on 1-3/4 inch sieve 0�
Retained on 1-1/2 inch sieve 0 - 5$
Retained on 3/4 inch sieve 30 - 650
Retained on 3/8 inch sieve 70 - 90�
,�, Retained on No. 4 sieve 95 - 1000
15 . 5. Approval of material:
The contractor shall submit laboratory reports
for gradations, densities and optimum moisture
of material he proposes to use for the
embedment and backfill to the City Staff for
approval. The City Staff' s approval must be
obtained before delivering the material to the
site. "
Section 7 . That the City Code, Appendix E, Article III,
Item 15. relative to Pipe embedment and backfill is hereby
amended by amending Item 15. 8 . to read as follows:
"15. 8 . Installing embedment and backfill:
After the trench bottom is brought to proper
elevation and graded to uniform slope, the
contractor shall install the initial or bedding
layer of embedment up to a grade slightly
higher than that required for the bo�tom of the
pipe and shall scoop out recesses to receive
the pipe bells. The pipe shall then be placed
on the initial bedding and brought to grade by
tamping. Each pipe section shall have uniform
bearing on the embedment for the length of the
pipe, except immediately at the joint. Where
required, adjustment to the pipe grade shall be
made by scraping away or filling with embedment
material . Wedging or blocking of the pipe will
not be permitted. With the pipe set firmly on
grade, the bell holes shall be filled and the
bedding material extended upward to the proper
elevation. Then the sand backfill material,
meeting the gradation requirements of Item
15. 3 . , or native material shall be added to
complete the pipe zone backfill. The native
material shall be free of clods and organic
material such as roots or tree limbs. The
embedment and backfill shall be placed in lifts
not to exceed twelve (12) inches in depth,
properly wetted to approximate optimum moisture
and mechanically compacted in place to a
minimum density of ninety-five percent (95$) of
the Standard Proctor Density for sand and
gravel and ninety percent (900) of the Standard
Proctor Density for native material.
Additional lifts shall not be placed until the
lift being compacted has reached the density
required. This may require some hand work by
� the contractor. Under no circumstances may the
material from trench excavation be returned to
the trench within the pavement section and the
three (3) foot strip beyond the pavement edge
unless laboratory analysis of the material is
performed and written approval is obtained from
the Director of Public Works. "
Section 8 . That the City Code, Appendix E, Article III ,
Item 15 . relative to Pipe embedment and backfill is hereby
amended by deleting Item 15. 9 . entitled Select material on pipe
zone and renumbering the remainder of Item 15. accordingly.
Section 9 . If any section, article, paragraph, sentence,
clause, phrase or word in this ordinance, or application thereto
any person or circumstances is held invalid or unconstitutional
by a Court of competent jurisdiction, such holding shall not
affect the validity of the remaining portions of this ordinance;
and the City Council hereby declares it would have passed such
remaining portions of this ordinance despite such invalidity,
which remaining portions shall remain in full force and effect.
Section 10. The fact that the present ordinances and
regulations of the City of Grapevine, Texas, are inadequate to
properly safeguard the health, safety, morals, peace, and general
`�" welfare of the public creates and emergency which requires that
this ordinance become effective from and after the date of its
passage, and it is accordingly so ordained.
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
GRAPEVINE, TEXAS on this the 5th day of September � 1989 .
APPROVED:
�--���'��-�,���--
William D. Tate
Mayor
'�*'`' ATTEST:
� �
L 'nda Huff
City Secretary
APPROVED AS TO FORM:
r
�..�/
Adrienne C. Leonard
City Attorney
�