HomeMy WebLinkAboutORD 1988-059 ORDINANCE NO. 88-59 AN ORDINANCE OF THE CITY OF GRAPEVINE, TEXAS AMENDING THE WATER DISTRIBUTION SYSTEM MASTER PLAN AS APPROVED BY THE CITY COUNCIL ON MARCH 19, 1985; PROVIDING A SEVERABILITY CLAUSE; DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE �� BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1 . That the summary of estimated costs contained on page 1 . 3 of the Water Distribution System Master Plan (the "Master Plan") is hereby amended to read as follows: '� YEAR ESTIMATED COST 1986 $ 233,388 1987 1, 882 , 945 1988 2 , 449, 324 1989 939, 948 1990 7 , 430, 445 1991 273 , 405 1986-1991 13,209,455 1992-2027 8, 130, 299 1986-2027 $21,339, 754 " Section 2. That the second full paragraph on page 7 . 8 of the Master Plan is hereby amended to read as follows: "Only two pipelines are proposed from 2001 through ��:� ultimate development. The first is a 20-inch pipeline along Northwest Highway from Fairway Drive nort - eastward to International Parkway. The second is a 30-inch pipeline along State Highway 121 from Hall-Johnson Road to Timberline Drive. These two pipelines will be required to move large quantities of water from one section of town to another as the demands increase in the future. The elimination of a previously planned 36 inch pipeline along State Highway 121 from Hall-Johnson Road south to the TRA supply point has been deleted from the plan as a result of the planned new TRA supply point on Pool Road at the � south city limit line. " Section 3 . That Table 8 . 1 of the Master Plan is hereby amended to read as follows : �� TABLE 8 . 1 City of Grapevine Water Distribution System Master Plan ��`� Proposed 1986 Through 1991 Improvements Program Year Description 1985 Total Estimated Cost 1986 1) 12-inch Ball Street Distribution Pipeline $ 175 , 313 2) Clean Water Treatment Plant Trans- mission Pipelines 58 , 075 1986 Total $ 233 ,388 1987 3) 10-inch Glade Road Distribution Pipeline $ 98 , 175 4) 16-inch and 12-inch Dallas Road Distribution Pipelines 243 ,375 5) 16/20-inch Northeast Transmission Pipeline 517 ,294 6) 12-inch Northeast Distribution Pipe- lines 762, 163 7) 12-inch Mustang Drive Distribution Pipeline 123 ,338 8) 8-inch State Highway 26 Distribution Pipelines 138 , 600 1987 Total $ 1 , 882 ,945 �� 1988 9) 10/16/12-inch Dove Road Transmission Pipeline $ 1 , 018 ,861 10) 12-inch Snakey Lane Distribution Pipeline 218 ,213 11) 20-inch and 16-inch State Highway 121 Distribution Pipelines 1 ,212 ,250 1988 Total $ 2,449 , 324 1989 12) 12-inch and 8-inch Parr Lane Distri- bution Pipelines $ 310,052 13) St. Louis Southwestern R.R. Distri- bution Pipelines 154 ,963 29) 20-inch State Highway 26 Transmission Line 206, 221 30) 20-inch Transmission Line; Ruth Wall- Fairway 268, 712 1989 Total $ 939, 948 1990 14) Water Treatment Plant Improvements $ 6, 492, 992 15) 12-inch State Highway 360 Distri- bution Pipeline 259, 325 16) 8-inch Northwest Distribution Pipe- lines 341, 141 17) 8-inch Ruth Wall-Bushong Distribution ° `° Pipelines 213, 978 31) 33-inch Pool--Hall-Johnson Transmission Line 123, 009 �`"k� 1990 Total $ 7, 430, 445 1991 18) Kimball Road Distribution Line 273, 405 1986 THROUGH 1991 TOTAL $ 13 , 209, 455 " Estimated total cost for the 1986 through 1991 program is $13,209 ,455. The largest expenditure is $6 , 492, 992 in 1990 when the water treatment plant capacity is increased from 4. 0 MGD to 8. 0 MGD and additional storage and high service pumping facilities are constructed. Improvements recommended from 1992 through 2027 (ultimate development) are shown in Table 8 . 2. The total 1985 estimated cost of these improvements is $8 , 130,299. The largest single expenditure during this period is $1 ,650, 825 for a 1 .5 MG elevated tank. Section 4 . That Table 8 . 2 of the Master Plan is hereby amended to read as follows: �� Table 8 . 2 City of Grapevine Water Distribution System Master Plan Proposed 1992 Through 2027 Improvements 1985 Total Descri tion Estimated Cost 19) 30/24-inch State Highway 121 Transmission Pipeline $1 ,158 ,882 20) 20-inch and 16-inch Ball Street Transmission Pipeline 677 , 963 21) 1 . 5 MG Elevated Storage Tank 1 ,650 ,825 22) 12-inch Business 114 Distribution Pipeline 154 ,963 23) 12-inch Parr Road Development Pipeline 168, 438 24) 12-inch State Highway 114 Distribu�ion Pipeline 183 ,425 25) 12-inch State Highway 360 Development Pipe- lines 919 ,655 26) 16-inch and 12-inch Northeast Development Pipelines 265 ,650 27) 20-inch Northeast Supply Pipeline 479, 931 �� 28) 30-inch State Highway 121 Supply Pipeline 554, 921 32) 33/30-inch Hall-Johnson Road Supply Pipeline $ 859 , 745 1992 THROUGH 2O00 TOTAL $8 , 130 ,299 " Section 5 . That Appendix A of the Master Plan is hereby amended by the addition of Item Nos. 29-32, inclusive, which shall read as follows: "29) State Highway 26 Transmission Line A-31 30) Ruth Wall-Fairway Transmission Line A-32 31) Pool--Hall-Johnson Transmission Line A-33 32) Hall-Johnson Road Supply Line A-34" Section 6 . That Table A-2 of the Master Plan is hereby amended by amending Item No. 28 and by the addition of Item Nos. 29-32, inclusive, which shall read as follows: �� Estimated Construction Cost - Water Line Description: 28) State Highway 121 Supply Line; b3�A� Hall-Johnson Road North �, Estimated Construction Date: 1990 Item Quantity Unit Cost Cost 30-inch Pipeline 5, 920 LF $74. 10 $438, 672 Subtotal $438 , 672 Contingencies 15°s $ 65, 801 Estimated Construction Cost $504, 473 . Engineering and Administration 10� $ 50, 448 TOTAL ESTIMATED COST $554, 921 Estimated Construction Cost - Water Line Description: 29) 20" Transmission Line; Water Treatment Plant to S.H. 26 """�"" Estimated Construction Date: 1990 Item Quantity Unit Cost Cost � 20-inch Pipeline 3, 300 LF $49 . 40 $163, 020 Subtotal 163, 020 Contingencies 15� $ 24, 453 Estimated Construction Cost $187, 473 Engineering and Administration 10$ $ 18 ,748 TOTAL ESTIMATED COST $206,221 Estimated Construction Cost - Water Line Description: 30) 20" Transmission Line; Ruth Wall Street to Fairway Drive Estimated Construction Date: 1989 Item Quantity Unit Cost Cost ��� 20-inch Pipeline 4, 300 LF $49 . 40 $212, 420 Subtotal $212,420 Contingencies 15� $ 31 , 863 Estimated Construction Cost $244 , 283 Engineering and Administration 10� $ 24 ,429 TOTAL ESTIMATED COST $268 , 712 Estimated Construction Cost - Water Line Description: 31) 33" Transmission Line; TRA Supply Point at Pool Road to Hall-Johnson Estimated Construction Date: 1990 Item Quantity Unit Cost Cost 33-inch Pipeline 1 ,100 LF $88 . 40 $ 97,240 Subtotal $ 97,240 Contingencies 15� $ 14 ,586 � � Estimated Construction Cost $111 , 826 Engineering and Administration 10$ $ 11, 183 TOTAL ESTIMATED COST $123 ,009 Estimated Construction Cost - Water Line Description: 32) Hall-Johnson Road Supply Line Estimated Construction Date: 2001 - 2027 Item Quantity Unit Cost Cost 30-inch Pipeline 4 , 400 LF $74. 10 $326 , 040 33-inch Pipeline 4 ,000 LF $88 . 40 353 ,600 Subtotal $679 , 640 °�� Contingencies 15� $101 ,946 Estimated Construction Cost $781 , 586 Engineering and Administration lOg $ 78 , 159 TOTAL ESTIMATED COST $859 ,745 " Section 7 . If any section, article, paragraph, sentence, clause, phrase or word in this ordinance, or application thereto any person or circumstances is held invalid or unconstitutional by a Court of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance; and the City Council hereby declares it would have passed such remaining portions of this ordinance despite such invalidity, which remaining portions shall remain in full force and effect. Section 8 . The fact that the present ordinances and regulations of the city of Grapevine, Texas, are inadequate to properly safeguard the health, safety, morals, peace, and general welfare of the public creates an emergency which requires that this ordinance become effective from and after the date of its passage, and it is accordingly so ordained. � PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 6th day of ��tember . 1988• APPROVED: �n/ i=��-,��� Mayor ATTEST: C ' ty Secr ta APPROVED AS TO FORM: «.�:>,� s.,�, City Attorney �` ,�