HomeMy WebLinkAboutSFRA2020-3156 E \J 0 DATE OF ISSUANCOIC '
T s x a s 'C�'\O PERMIT#: 00-315 .E
BUILDING P RMIT APPLICATION
(PLEASE PRINT LEGIBLY—COMPLETE ENTIRE FORM)
JOB ADDRESS: 1904 Cheshire Dr SUITE #
LOT: 1 BLOCK: 3 SUBDIVISION: Town Park Add
BUILDING CONTRACTOR(company name): Structured Foundation Repairs Inc.
CURRENT MAILING ADDRESS: 13301 Trinity Blvd. #133
CITY/STATE/ZIP: Euless, TX 76040 PH:# 972-484-1200 Fax# 972-484-1215
PROPERTY OWNER: David Hickey
CURRENT MAILING ADDRESS: 1904 Cheshire Dr
CITY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 817-201-1324
PROJECT VALUE: $ 3876.00 FIRE SPRINKLERED? YES NO X
WHAT TRADES WILL BE NEEDED?(Check ones that apply)ELECTRIC_ PLUMBING_ MECHANICAL
DESCRIPTION OF WORK TO BE DONE: Install 7 concrete pilings to stabilize foundation
USE OF BUILDING OR STRUCTURE: Residence
NAME OF BUSINESS:
Total Square Footage under roof: 2273 Square Footage of alteration/addition:
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department(required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for 1&2 family dwellings)
❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS,ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND
OR FEDERAL AGENCY(S). //��
PRINT NAME: Patricia Palos SIGNATURE /-q�2i.(,6(L
PHONE#: 972-484-1200 EMAIL:
Q CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: Permit Valuation: $ Setbacks Approval to Issue
Occupancy Group: Fire Sprinkler: YES NO X, Front: Electrical "--
Division: Building Depth: Left: Plumbing —
Zoning: Building Width: Rear: Mechanical
Occupancy Load: Right:
Plan Review Approval: Date: �/ 3 �O BuildingPermit Fee:
Site Plan Approval: Date: Plan Review Fee:
Fire Department: Date: Lot Drainage Fee:
Public Works Department: Date: Sewer Availability Rate:
Health Department: Date: Water Availability Rate:
Approved for Permit: Date: Total Fees:
Lot Drainage Submitted: Approved: Total Amount Due:
P.0.BO%8518C,GRAPEVINE,TX 76689(617)4163165 ;r� S
O'FORNIMSPERMITAPPLICATIONS iN 11 5 1/ A/
BUILDING --- RESIDENTIAL ALTERATION
ill9C V IF�. Issue Date:October 20,2020
T e 1 t PROJECT DESCRIPTION:Install(7)Concrete Pilings to Stabalize Foundation
PROJECT# (817)410-3010 www.mygov.us
SFRA-20.3156 Inspections Permits
City of Grapevine -- —
LOCATION LEGAL
Grapevine,,T TX 76099
P.O.Box 1904 Cheshire Dr. Town Park Addition Ph li Elk 3 Lot 11
X
Grapevine,TX 76051 No.3220 Tr 11
(817)410-3165 Voice *06755852*
(817)4103012 Fax
CONTRACTOR INFORMATION
Structured Foundation Repairs, Inc. **APPLICANT NAME Patricia Palos
13301 Trinity Blvd.#133 **APPLICANT PHONE NUMBER 9724841200
Euless,TX 76040 County
(972)484-1200 Phone Tarrant
(972)484-1215 Fax Fire Sprinkler System? NO
Square Footage
VALUATION 3875
OWNER
David J Hickey FEES TOTAL=$150.00
1904 Cheshire Dr Building Permit Fee, ($150.00 Flat Fee)Simple
Grapevine,TX 76051-7719 Alteration $150.00
AVAILABLE INSPECTIONS PAYMENTS TOTAL=$150.00
Building Final(required)
Structured Foundation Repairs, Inc. (Thomas
Kidd)
Other on 0910312020 ($150m)
Note:CC2789
NOTICES
1)ALL work must be done in compliance with the 2006 INTERNATIONAL
BUILDING CODE.
2)A copy of the signed permit and approved plans must be on site at all times.
3)The project address must be clearly posted at the job site.
READ AND SIGN
I hereby certify that the foregoing is correct to the best of my knowledge and all
work will be performed according to the documents approved by the Building
Department and in compliance with the City of Grapevine Ordinance regulating
construction. It is understood that the issuance of this permit does not grant or
authorize any violation of any code or ordinance of the City of Grapevine. I
FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY,AND
THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR
OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR
FEDERAL AGE (S).
ignature Date
MYGOV.US City of Grapevine I BUILDING--RESIDENTIAL ALTERATION I SFRA-20-3156 I Printed 10/20120 at 1:48 p.m. Page 1 of 2
ALL CHANGES REQUIRE
APPROVAL
Adam ADJFn,rF-y�..(�/IShc DBg LANS
CROSSTOWNTampa:(813)702-3398 1 Dallas/Ft.Worth(469) 751-7694
AMMMULAN&SHALL BE
KEPT ON JOBSITE ATALL TIMES
Date: August 28, 2020 CONTRACTOR SHALL CALL FOR
Attention: Structured Foundation Repairs, Inc. (via e-mail) INSPECTIONS:
(g 17) 410-301 Q
Subject: Structural Foundation Initial Inspection Report
1904 Cheshire Dr., Grapevine, TX. 76051 CONTRACTOR REGISTRATION
WILL BE REVOKED UPON
To Whom It May Concern:
PERMIT EXPIRATION.
Crosstown Engineering(CE)was retained to conduct a review of the provided pier plan prepared by Struc-
tured Foundation Repairs, Inc. (SFR)to determine if it is a reasonable limited plan of repair.
CE visited the subject site to interview the property owner, observe the structure and terrain, and to verify
the floor elevation data.
We observed brick cracks, drywall cracks, foundation cracks and brick joint separations that indicated set-
tlement was occurring on the right and left sides of the structure. These observations are confirmed by floor
elevation data.
SFR has proposed to perform the following in the approximate locations of the structure as indicated on the
limited repair plan to support the foundation:
Install 7 total pilings (6 exterior, 1 exterior with concrete breakout).
We recommend moving 1 piling on the front to the back of the structure. Based on our observations, it is
our opinion that the proposed plan of repair is reasonable. Because the structure has endured pre-repair
foundation differential movement, residual differential elevation and perceptible floor slope may remain
following the limited foundation repairs. This limited repair plan is intended to provide a reasonable repair
to improve the performance of the foundation and is not intended to level the foundation. The contractor
shall determine the amount of elevation correction needed based on the reaction of the structure during the
lift in order to minimize damages and additional stress.
CITY OF GRAPEVINE
Please see the Disclosure & Disclaimer, pier detail (if providlEkEM ED fQRQ< I3TrRWQMN
mation and do not hesitate to call us if you have any questions.
SHEET: I OF:
Sincerely, RELEASE DOES NOT AUTHORIZE ANY WORK IN
CONRICT WITH THE BUILDING CODE OR ZONING ORDINANCE
Crosstown Land Development Services CITY qpP - ..... S TO BE KEPT ON
Engineering Firm(F-15944)
� SAT ALL TIMES
XJ
Adam Green, P.E. AAA: BY:
Professional Engineer(TX#116597) BU CTIONDIVISION:
REISASProvide Signed and Sealed EASEMENTSPUBLIC RIGHTMY TO N-OF-WR AY.
letter from Registered IWC3ESMUSTBEAPPROV
Engineer confirming site Foundation Report
inspection and approval of PageIgf4 1904 CHESHIRE DRIVE
pier installation when 20-3156
work is complete. OFFICE COPYstall 7 Concrete Pilings
Adam A. Green,P.E. (FL&TX),MBA
CROSSTOWNTampa:(813)702-3398 1 Dallas/Ft.Worth(469)751-7694
DISCLOSURE&DISCLAIMER
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expan-
sion,contraction or densification of the soils etc. This soil movement could possibly cause the foundation to move
after the remediation plan within the attached report has been implemented and may impact the stability of the foun-
dation and cause damage.
NO WARRANTY IS EXPRESSED OR PYIPLIED BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS
FOUNDATION OR THE REPAIRS THERETO. Diligent foundation maintenance to maintain consistent soil condi-
tions along the perimeter should reduce further problems after the recommendations within this report have been
implemented. However,seasonal moisture variations,water leaks,erosion and other factors may affect the stability
of the foundation and put it in danger of further damage.
REPORT LIMITATIONS
This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the
property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current
conditions observed at the time of the inspection. THERE IS NO WARRANTY,EXPRESSED OR IMPLIED,CON-
CERNING THIS ENGINEERING REPORT.
The information in this report supersedes any verbal comments,expressed or implied,made by Crosstown Land De-
velopment Services or its principals,agents or employees. The client agrees that neither CLDS nor its employees or
owners will be responsible for:
1.Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite drilling and
testing of the recovered samples,
2.Knowledge of cracks,vertical differential displacement of floors without uncovering of the floor by the client;and
3.Any other element such as joists or beams and other structural members that is boxed or otherwise not readily
available to CE for viewing,and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance
of the facility at the time of this structural survey. Compliance with any code or specification other than as expressly
noted is specifically excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and
DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN
THE FUTURE.
This report was prepared expressly for the client and expressly for the purposes 1' ission
for use by any other person for any purpose,or by the client for diffe p(,p to 4 ro e-Mted in
writing by CE. N TRUMION
CE SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIOHE CONTRACTOR Of)121S SUBCON-
TRACTORS PERFORMING WORK ON THIS PROJECT,OR TFft8E9
FORM THE WORK IN ACCORDANCE WITH THE RF. �IdyI I[IRT%WML8 ta>aa&'2y r.�a�� RK IN
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE OR PROCEDURES O T A - RDINANCE
TIONS INCIDENTAL THERETO. CITY APPROVED PLANS TO BE KEPT ON
CE expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A rAL11 cT1MW
pressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose wft resi�l pect to ,
this report. THE REPORT UNDER THIS AGREEMENT IS T INION OF CE AND THE NO WAR-
RANTIES THAT EXTEND BEYOND THE DESCRIPTION 5 IVI
Foundation Report F�SF(]AFS AT APPt TC1 CONSTRUCTION iCTION IN
Page 2 of EASEMENTS OR PUBLIC RIGHT-OF-WAY.
ALL CHANGES MUST BE APPROVED
PRESSED PILING SPECIFICATIONS
SIDE VIEW FRONT VIEW
EXISTING
STRUCTURE
- FOUNDATION
STEEL SHIMS
CONCRETE
CYLINDERS
SOIL
-- CONCRETE
CAP
12"LENGTH
6"DIAMETER
AND/OR
W LENGTH
4"DIAMETER
/ PILE SECTIONS
W TENSILE STRENGTH
Z PROVIDEDBYTWO
0
COLUMNS OF#3 OR
w #4 SCHEDULE 60
m REBAR EPDXY OR
GROUT IN PLACE.
2N
0
UJ W
Z0
Z Q
J F '
a
0
w REBAR SHALL
w PREVENTLATERAL
a
DISCONNECT
BETWEEN
CYLINDERS. 12",18"
OR 24"SECTIONS
MAYBE USED.
crry OF I611A
RELGREEASTl7T p
S E
LEASE D ESONOTAUTHO -AA'Ei§N5t?EN_�I
1904 Cheshire Dr., Grapevine, TX. 76051 CONFLICT WITH E BUILDING GODEC�k
-. C �j
C ROSSTOW TBPE FIRM ")751-76 4-DALLAS NgrOPLE>(ERING COM j
DATE. _
BUILDING INSPECTION DIVISION:
EASEMENTS OR PUBLIC RIGHT�OF-WAY.
ALL CHANGES MUST BE APPROVED CHANGES MUST BE APPROVED
CONSTRUCTION NOTE: IF INTERIOR PILING LOCATIONS ARE SHOWN PLEASE NOTE: IF EXISTING-P,UNGS ARE SHOWN ON THIS MAP,THEIR
ON THIS MAP THEY ARE APPROXIMATED ANDQARE LOCATED WITHOUT LOCATION WAS PROVIDED BY THE CLIENT AND IS APPROXIMATE. CE
KNOWLEDGE OF THE LOCATIONS OF THE INTERIOR GRADE BEAMS. DOES NOT CERTIFY THEIR PERFORMANCE OR EXISTENCE. IFTHE
THE CONTRACTOR SHALL MAKE FIELD JUDGEMENTS-BASED OFF OF READER WOULD LIKE TO DETERMINE-IF THEY ARE ACTUALLY PRESENT,
THEIR GRADE BEAM INVESTIGATIONS AND OBSERVED SLAB QUALITIES THEY MUST CONTACT THE OWNER OR CONTRACTOR TO OBTAIN AN
TO FIELD LOCATE THE FINAL INTERIOR PIER LOCATIONS. FINAL SCOPE ENGINEERING CERTIFICATE FOR THEM.
CHANGES SHALL BE A PPROVED-BY THE ENGINEER OF RECORD.
i - -
I
r---------------T
I _
I COVEREED I
I NON-MONOLITHIC
NON- I I -- PATIO I- -
I
MONOLITHIC:
- I _
S -0.7 -1.0 13
-1.0 1
A
S- -0.4 FP
-0.9 ! -=0.7 2 -- --
-0.3 - -0.5 -- --
0.3 . 3
-- - 0:0 -1.2 -
-0.2 1
1 -0.4 10 4
_ -0.1 A/C - I
A/C
-0.2- -0.1 0.1 - 41 -
- 5 CE RECOMMENDS
0.0 ONO- MOVE PILING TO BACK
LITHIC _02 - �-O,7 OF STRUCTURE -
I I 5
1 _
I L1 7 i
SAN I I
DAN 1
1 -
FRONT
• INSTALL 7 TOTAL PILINGS (6 EXTERIOR, 1 EXTERIOR WITH CONCRETE BREAKOUT).
• CE-RECOMMENDS: MOVE 1- PILING TO THE BACK OF THE STRUCTURE. —
LIMITED REPAIR PLAN *NOT TO SCALE-ALL LOCATIONS APPRO oFr``
PRE-LIFT ELEVATIONS BY CE(08.27.20) 0.0 POST-LIFT ELEVATIONS BYC "k9 R 0
/�/�Ry .! k's°a,
.............................::..:..1
LEGEND HEET: , AD A,GREEN
ELEVATION BASEPOINT PROPOSED PAD/BLOCK X E IN F
—PROPOSED BEAM 0 EXISTING PAD/BLOCK ^ N OES N T AU�RU� A v 'RfsS
�r MffiM LIN G CODE OR ZON 3
—EXISTING BEAM PROPOSED PIER ® EXISTING BREAKOUT �q�o
CR(l Ti
M
TBPE FIRM F-15944 -
CROSSTOWN f
ENGINEERING FOUNDATION REPAIR DA� 9) BUILDINGDINS ECTIION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRU TION 1
1904 CHESHIRE DR. , GRASP 0R LIC7110r ,AY.
A S T B A ROVED
NOV 18 2020
Adam A. Green, P.E. (FL&TX), MBA
CROSSTOWNTampa: (813)702-3398 1 Dallas;Pt Worth(469)751-7094
"
Date: September 24, 2020
Attention: Structured Foundation Repairs.Inc. (SFR) (via e-mail)
Subject: Final Report&Inspection
1904 Cheshire Dr., Grapevine,TX
Dear Structured Foundation Repairs, Inc. and Property Owner:
Structured Foundation Repairs, Inc. (the contractor) ed Crosstown Engineering (CE) to visually in-
spect foundation repairs completed by Structure atioqn Repairs, Inc. Crosstown Engineering visited
the property,conducted a visual inspection, neclthat all work,including any approved changes,
has been completed per our original re
to /20.
Based on information provided by S d Foundation Repairs, Inc. and visual observations, it appears
that the following was performed:
• Installed 7 total pilings (6 exterior, 1 exterior with concrete breakout).
• Adjusted 2 existing pilings.
Changes to the repair plan include: 2 existing pilings were adjusted and the CE recommendation to move 1
piling from the front to the back was not completed. The elevation data obtained during the inspection
indicates the foundation is supported by pilings to prevenrther downward movement and may have been
lifted. In some cases, the pilings are meant to supp*t foundation and minimal to zero lift was inten-
tional.
We recommend post-lift plumbing tests be on the sewer and potable plumbing lines and that
any leaks be immediately repaired. T pair plan is intended to provide reasonable repair to
improve the performance of the foun nd is not intended to level the foundation. The contractor
determined the amount of elevation corr ion needed based on the reaction of the structure during the lift
in order to minimize damages and additional stress.
If you have any questions or need additional information,please call our office.
Sincerely,
Crosstown Land Development Services E od
Texas Engineering Firm(F-15944)
�l
REEN'..
Adam Green, P.E.,MBA 9/24/20 ,//LLjO .4CEN5E�'S�L/
L�1�`S/ONAI flNj�
Professional Engineer(TX#116597)
Foundation Report
Page I of 3
Adam A. Grccn, P.E. (FL&TX), MBA
CROSSTOWNTampa: (813)702-3398 1 ll las/Ft.Worth(469) 751-769h
DISCLOSURE&DISCLAIMER
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due to expan-
sion, contraction or densification of the soils ere. This soil movement could possibly cause the foundation to move
after the remediation plan within the attached report has been imple ented and may impact the stability of the foun-
dation and cause damage.
NO WARRANTY IS EXPRESSED OR IMPLIED BY T GI ER AS TO THE PERFORMANCE OF THIS
FOUNDATION OR THE REPAIRS THERETO. D' dation maintenance to maintain consistent soil condi-
tions along the perimeter should reduce furth im r the recommendations within this report have been
implemented. However, seasonal moisture v ion , r leaks,erosion and other factors may affect the stability
of the foundation and put it in danger of furthe e.
REPORT LIMITATIONS
This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the
property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current
conditions observed at the time of the inspection. THERE IS NO WARRANTY,EXPRESSED OR IMPLIED,CON-
CERNING THIS ENGINEERING REPORT.
The information in this report supersedes any verbal commend expressed or implied,made by Crosstown Land De-
velopment Services or its principals, agents or employees liens agrees that neither CLDS nor its employees or
owners will be responsible for:
1.Knowledge of the subsurface conditions w sive geotechnical data obtained from onsite drilling and
testing of the recovered samples,
2.Knowledge of cracks,vertical differen d' lacement of floors without uncovering of the floor by the client;and
3.Any other element such as joists or be d other structural members that is boxed or otherwise not readily
available to CE for viewing,and releases CE from any liability attributable to such knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance
of the facility at the time of this structural survey. Compliance with any code or specification other than as expressly
noted is specifically excluded.
The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and
DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY NOT MANIFEST IN
THE FUTURE.
This report was prepared expressly for the client and expressly for the purposes indicated by the client. Permission
for use by any other person for any purpose,or by the client for different purpose is denied unless otherwise stated in
writing by CE.
CE SHALL HAVE NO LIABILITY FOR ACTS OR S BY THE CONTRACTOR OR HIS SUBCON-
TRACTORS PERFORMING WORK ON THIS PRO R E FAILURE OF THE CONTRACTOR TO PER-
FORM THE WORK IN ACCORDANCE WI PAIR PLAN. CE IS NOT RESPONSIBLE FOR THE
CONSTRUCTION MEANS, METHODS SEQUENCE OR PROCEDURES OR THE PRECAU-
TIONS INCIDENTAL THERETO.
CE expressly DISCLAIMS ANY WARRA OF FITNESS FOR A PARTICULAR PURPOSE and the client ex-
pressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to
this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WAR-
RANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT.
Foundation Report
Page 2 of 3
CONSTRUCTION NOTE: IF INTERIOR PILING LOCATIONS ARE SHOWN PLEASE NOTE:IF EXISTING PILINGS ARE SHOWN ON THIS MAP,THEIR
ON THIS MAP THEY ARE APPROXIMATED AND ARE LOCATED WITHOUT LOCATION WAS PROVIDED BY THE CLIENT AND IS APPROXIMATE. CE
KNOWLEDGE OF THE LOCATIONS OF THE INTERIOR GRADE BEAMS. DOES NOT CERTIFY THEIR PERFORMANCE OR EXISTENCE. IF THE
THE CONTRACTOR SHALL MAKE FIELD JUDGEMENTS BASED OFF OF READER WOULD LIKE TO DETERMINE IF THEY ARE ACTUALLY PRESENT,
THEIR GRADE BEAM INVESTIGATIONS AND OBSERVED SLAB QUALITIES THEY MUST CONTACT THE OWNER OR CONTRACTOR TO OBTAIN AN
TO FIELD LOCATE THE FINAL INTERIOR PIER LOCATIONS. FINAL SCOPE ENGINEERING CERTIFICATE FOR THEM.
CHANGES SHALL BE APPROVED BY THE ENGINEER OF RECORD.
f_______________l
I
COVEREED
i j NON-MONOLITHIC
NOW I PATIO I
I I I
(MONOLITHIC:
2A IA
v
-0.9 -0.9
( -0.7 -01..0
-1.0) -0.8) -0.5)
(-0.2) (-1.0
, -0.1)
(-0.8) (-0.6)
-0.8 -0.6 F
P
(-0.7) (0.0) (0.0)
0.3 -0.5
0.3 3
4)
0.0 (-1.2
-0 2 (0.0) -1.2
_0.4 (0.0) 40 4
-0.1 (0.0 �"", -„ A/C
(0.0) n i P', A/C
-0.2 (0 U q ;2 r
-0 1 0.'1 .
(0.0) (0.0) u 41 a NOT COMPLETED:
'0.0 (0.1) ONO- (0.0) CE RECOMMENDED
3„ CITRIC 0.2) -0.7 MOVING PILING#7
TO BACK
I
6 OFSTRUCTURE
I L I 7 I
L9/V✓ DAN
FRONT
• INSTALLED 7 TOTAL PILINGS (6 EXTERIOR, 1 EXTERIOR WITH CONCRETE BREAKOUT).
• ADJUSTED 2 EXISTING PILINGS.
• NOT COMPLETED: CE RECOMMENDED MOVING PILING #7 PILING FROM THE FRONT TO THE BACK.
LIMITED REPAIR PLAN *NOT TO SCALE-ALL LOCATIONS APPROXIMATE* =-EOF TF`�N
PRE-LIFT ELEVATIONS BY CE(08.27.20) 0.0 POST-LIFT ELEVATIONS BYCE(9.24.20) (X.X) _ f'�S'
LEGEND r/1,
v'""I REEN
ELEVATION BASEPOINT INSTALLED PAD/BLOCK X EXISTING PIER "��6597
INSTALLED BEAM EXISTING PAD/BLOCK O INSTALLED BREAKOUT �1jo ..410ENSE�''��'
EXISTING BEAM INSTALLED PIER EXISTING BREAKOUT 9.24.20
CROSSTOWN ENGINEERING
CROSSTOWN TBPE FIRM F-15944 -
(469)-751-7694 -DALLAS METROPLEX
ENGINEERING I FOUNDATION REPAIR