Loading...
HomeMy WebLinkAboutItem 10 - Motor Control CenterMEMOTO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: DECEMBER 1, 2020 SUBJECT: APPROVAL OF THE TREATMENT TRAIN TWO MOTOR CONTROL CENTER ENGINEERING SERVICES CONTRACT FOR WASTEWATER TREATMENT RECOMMENDATION: City Council to consider the Treatment Train Two Motor Control Center engineering services contract with Gupta & Associates, Inc. FUNDING SOURCE: Funds are available in the Utility Enterprise Capital Fund 200 in an amount not to exceed $28,000. BACKGROUND: Gupta & Associates, Inc. (GAI) will perform the design for the replacement of Treatment Train Two Motor Control Center at the Wastewater Treatment Plant which has been in service since 1986. The Motor Control Center is, in essence, a large industrial electrical control panel for electrical distribution, instrumentation and controls. It provides power for the air blowers, clarifiers, approximately 10 pumps, lighting and is critical for the operation of Train Two. This contract also provides design for connection to a transfer switch which will allow the MCC to run off generator backup during power outages. GAI will design the project and will provide bidding support for the installation. Construction costs of the proposed Motor Control Center is estimated to be $380,000. Staff recommends approval.