Loading...
HomeMy WebLinkAboutCOMA2020-40961 Connie Cook From:Don Dixson Sent:Wednesday, December 9, 2020 3:39 PM To:Lawrence Gray; Morris Carrejo; James Adams; Connie Cook; Guita McIlroy; Vicki Hecko; Arnoldo Ramirez; Hans Strayer; Mark Meyers; Scott Leavelle Subject:FW: [EXTERNAL] vestibule enclosure Here is the email confirming the erection and removal date. Make a copy and place in the file. Don Dixson, CBO Assistant Building Official Grapevine Development Services 200 S Main St Grapevine Texas 76051 817-410-3129 817-454-1966 TSBPE – I-2426 RAS – 1425 CEO – 4170 From: Gus Tolleson [ Sent: Wednesday, December 9, 2020 3:33 PM To: Don Dixson < Cc: Rick Kessinger < Subject: FW: [EXTERNAL] vestibule enclosure *** EXTERNAL EMAIL COMMUNICATION - PLEASE USE CAUTION BEFORE CLICKING LINKS AND/OR OPENING ATTACHMENTS *** Good afternoon Don, If you could please see your email at the bottom of this thread, I have included the answers (highlighted) to the bullet points you had sent that are required for the installation of the Great Wolf Lodge Vestibule. This should be everything, per our conversation, that you need to get this project rolling. Let me know if there is anything else you need from me, but otherwise, I appreciate the help on the phone earlier! 2 Best, Gus Tolleson USA Canvas Shoppe 10119 Gardner Road Dallas, TX 75220 Cell: 469-866-1773 l Office: 972-484-7633 l Fax: 972-620-0364 From: Rick Kessinger Sent: Friday, December 4, 2020 11:05 AM To: Keith Furnas Subject: Re: [EXTERNAL] vestibule enclosure We just need an install and removal date. Get Outlook for iOS From: Rick Kessinger < Sent: Friday, December 4, 2020 11:04:19 AM To: Keith Furnas < Subject: Re: [EXTERNAL] vestibule enclosure Yes to all the above. Get Outlook for iOS From: Keith Furnas < Sent: Friday, December 4, 2020 11:01:00 AM To: Rick Kessinger < Subject: FW: [EXTERNAL] vestibule enclosure See below. Can you get me the answers? Keith Furnas | General Manager Great Wolf Lodge - Grapevine Grapevine, Texas Direct: 817-722-3878 From: Don Dixson < Sent: Friday, December 4, 2020 10:58 AM To: Keith Furnas < Subject: RE: [EXTERNAL] vestibule enclosure Mr. Furnas: 3 I checked the permit historical file for the ‘membrane structure’, and talked with Mr. Stombaugh relating to a meeting you all had back in October 2020. If you could verify that the membrane structure is: 1. Being used to aid in climate control Yes 2. Offering energy savings and Yes 3. Of a temporary nature by an install and removal date as well as Yes, installation of the vestibule is to be the week of December 14th, 2020, and the removal of the vestibule is to be April 15th, 2021 4. Not a permanent addition to the existing building structure Yes I do not see why the membrane structure supplied by the manufacturer/representative would need to comply with the plan review comments letter issued. As, submitted for permit on 11/16/2020, the impression from the drawings as submitted were that this entry vestibule was of a permanent nature. The plans indicate a structure; but do not address any material types for the super-structure or façade materials. Once the temporary structure is documented as such; the contractor may proceed with the installation of the membrane structure. Regards, Don Dixson, CBO Assistant Building Official Grapevine Development Services 200 S Main St Grapevine Texas 76051 817-410-3129 817-454-1966 TSBPE – I-2426 RAS – 1425 CEO – 4170