Loading...
HomeMy WebLinkAboutSP2014-13ti SEP F "K . A CITY OF GRAPEVINE AV7 SITE PLAN APPLICATION PART 1. APPLICANT INFORMATION rei;�976;3e=* - for Crown Castle, on behalf of Sprint -r39rWAPV6"&g9t., Suite 305 )da ofa icantlagnt: "M�n"arer, �U. 8 226 T02=486—Tfff agent: IM-41MV96 Mobile phone number .f vplicantlayen' Applicant's interest in subject pmpeW. Representative for Cell tower company, Crown Castle, on behalf of Sprint for upgrading cell tower equipment PART 2. PROPERTY INFORMATION Street address ofsubj@o property 5401 Heritage Ave., Le9aJ.descd'pt1ipnofs0bi6ctW rtvt, me -16sil�qtl d tffiad 8 1102'®x 11 - h t) LO+ Size of subject properly 971 sq. ft. fNced Compound area Acres squarefoota-ge Present zoning classification: Give a general descriphron ofthe proposed use or uses for the proposed development,, (0-plb-ei- 6f E3 3:) Rkq-r.Alo PART 3. PROPERTY OWNER INFORMATION Name of current property owner. (`)Jlcqvi'lle lvt & P, V I Oz::N Street address at property owner city / State /ZiP Code ofpmpe)fy owner. 'Ie 02 V-� LA y1k K-eL f, (-,,05 1 Telephone number dtproperty owner- slq- ZSI- S5(�Ok Fax number otprnpaVowner. I S) r7- LA 12A - LA I (P;?- • Attach a final plat, or replat, of the Approved subdivision by city council showing property boundary lines, dimensions, easements, roadways, rail lines, and public rights -of way crossing and adjacent to the tract ( I blueline, copy) • Submit a site plan showing all information required by Section 47-E., Site Plan review requirements (sea attached requirements). b All site plans must conform to the approved concept plan. Any changes to a site plan, approved with a conditional use or a special use, can only be approved by offy council throe the public hearing process. ti SEP SP�z�—d� PART 4. SIGNATURE TO AUTHORIZE FILING OF A FILIAL. SITE PLAN ( i Print Applicant's arae: Applicant's Signature: The State Ofi16` County Of IC -000— (( �Q Before Me t on this day personally appeared (notary) (applicant) lryl� known to me (or proved to me on the oath of card or other document) to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same for the purposes and consideration therein expressed. (Seal) Given under my hand and seal of office this day of A.D. FA Stephanie K. Lentz r NOTARY PUBLIC - ARIZONA MARiCOPA COUNTY Notary In Ar o State Of Fobnjwy 02, 2201 a i zD+1 d Print Property Owner's Name:rty O ner's Sig ature The State Of `t`C ��� County Of % ay- rz, � Before Me a A € CCR irl3 � ��' . on this day personally appeared �' kj MG}4t (notary) (property owner) known to me (or proved to me on the oath of card or other document) to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he executed the same for the purposes and consideration therein expressed. (Seal) Given under my hand and seal of office this -DO day of. Ke, A A.D. _190 t14 FN , Pey� �.�. LESUE R. KRA1NEfZi(E MY COMMISSION EXPIRES,> ('^1 ' �+Febuq i3,Y01$ Nota` I&And For State Of Texas SSP 8 2014 SP14-13 SEPTEMEBR 18, 2014 5401 HERITAGE AVENUE SPRINT LOT 1R1A, BLOCK 1, HERITAGE HIGH SCHOOL ADDITION LJ SPRINT DA03XC147 — 5401 HERITAGE AVENUE Please add the signature block found below and number the sheets in consecutive order, i.e. 1 of 2 within the block. Please add case number — SP1 4-13 to the lower right hand corner within the title block of each sheet. SITE PLAN CITY OF GRAPEVINE APPROVED APPROVAL DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH ANY CODES OR ORDINANCES. PLANNER DATE SHEET OF DEPARTMENT OF DEVELOPMENT SERVICES MINIMUM SIZE 3"X 4" THIS SIGNATURE BLOCK MUST APPEAR ON EACH PAGE OF THE SUBMITTAL AND FINAL REVISIONS. NUMBER EACH SHEET AS PER EXAMPLE BELOW' SHEET 1 OF 4; SHEET 2 OF 4; SHEET 3 OF 4; SHEET 4 OF 4, ETC. Please provide an overall site plan which depicts the as -built conditions (football and baseball fields, proximity to W.D. Tate Avenue, etc.) on the subject site. Overall Site Plan The overall site plan and the proposed enlarged equipment may be consolidated onto a single sheet. Enlarged Equipment Plan The enlarged equipment plan and the overall site plan may be consolidated onto a single sheet. Tower Elevation Plan Please provide an elevation cutaway view of the security fence and ground equipment in conjunction with the monopole. Please revise the Title Sheet Drawing Index as neccessary. For the final submittal sheets N1, N2, N3, A5, E1, E2, G1, and the Land Field Services sheets are not required. For verification purposes please The above comments must be reflected in the revised submittal, which upon review, can be administratively approved. Please submit the revised documents to the Department of Development Services at 200 South Main Street. The revised submittal shall include: Two (2) unbound, unfolded and unstapled blackline copies of each sheet, (minimum size 22"x 34'). 14-4 From: To" 1019A Fax:19 414 (b `476 q Pages: 19, 1 -S 5- Phone: Date: 11 Urgent 0 For Review 11 Please Comment El Please Reply 0 Please Recycle 0 Comments: 09/18/2014 THU 17:10 FAX U001 ********************* *** FAX TX REPORT *** ********************* TRANSMISSION OK JOB NO. 2524 DEPT. ID 2420 DESTINATION ADDRESS 917244164769 PSWD/SUBADDRESS DESTINATION ID ST. TIME 09/18 17:09 USAGE T 01'07 PGS. 3 RESULT OK NTf —1 RA, To:��,�11 UM� 4f) jA%jqW`- From: + i�J-C Fax:1 R> - '4710 Pages: Phone: ` '✓ Date: Re:� S�� 4V T cc: 0 Urgent 0 For Review 0 Please Comment 0 Please Reply Cl Please Recycle 9 Comments: October 22, 2014 Jeremy Underwood Crown Castle 5350 N 48t" St #305 Chandler, AZ 85226 Re: Case No. SP14-13 To Whom It May Concern: This letter is to verify that your Site Plan Review application SP14-13, located at 5401 Heritage Avenue #Cell and platted as Lot 1R1A, Block 1, Heritage High School was approved per the attached site plan on October 21, 2014. Please find enclosed an approved site plan set for your records No site plan approval shall be valid for a period longer than one (1) year from the date such approval is issued, unless a building permit is issued and construction is actually begun within that period, and is thereafter diligently pursued to completion or an occupancy permit is obtained and a use commenced within that period. Approval of an application does not authorize any work in conflict with any Codes or Ordinances of the City of Grapevine Any changes to a site plan approved with a conditional use ora special use can only be approved by city council through the public hearing process. If you have any questions relative to your building permit, please contact the Plans Examiner, at (817) 410-3165. If you have any further questions regarding your site plan approval, please feel free to contact me at (817) 410-3155. Sincerely, .,'dSusan Batte Planning Technician DEVELOPMENT SERVICES DEPARTMENT The City of Grapevine - P.O. Box 951.04 - Grapevine, Texas 76099 0 (817) 410-3154 Fax (817) 410-3018 • www.grapevinetexas.gov February 10, 2014 Heather Drew Crown Castle 5350 North 48th Street Suite 305 Chandler, AZ 85226 (480) 735-6932 Subject: Carrier Designation: Crown Castle Designation: Engineering Firm Designation: Site Data: Dear Heather Drew, sP�u-�3 JfB+T URF'' B+T Group 1717 S. Boulder, Suite 300 Tulsa, OK 74119 (918) 587-4630 btwo btgrp.com Structural Analysis Report Sprint PCS Co -Locate Carrier Site Number: Carrier Site Name: Crown Castle BU Number: Crown Castle Site Name: Crown Castle JDE Job Number: Crown Castle Work Order Number: Crown Castle Application Number: B+T Group Project Number: Scenario B DA03XC147 N/A 876445 Heritage High School 258594 706601 214793 Rev. 6 88274.002.01 5401 Heritage Avenue, Colleyville, Tarrant County, TX Latitude 32° 53'23.22", Longitude -97° 6'9.92" 116.75 Foot - Monopole Tower B+T Group is pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above mentioned tower. This analysis has been performed in accordance with the Crown Castle Structural `Statement of Work' and the terms of Crown Castle Purchase Order Number 615131, in accordance with application 214793, revision 6. The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC7: Existing + Reserved + Proposed Equipment Sufficient Capacity Note: See Table 1 and Table 2 for the proposed and existing/reserved loading, respectively. The analysis has been performed in accordance with the TIA/EIA-222-F standard and IBC 2006 based upon a wind speed of 70 mph fastest mile. All equipment proposed in this report shall be installed in accordance with the attached drawings for the determined available structural capacity to be effective. We at B+T Group appreciate the opportunity of providing our continuing professional services to you and Crown Castle. If you have any questions or need further assistance on this or any other projects please give us a call. �k OF Respectfully submitted by:`��� B+T Engineering, Inc. , d JOH, ;.._ II 99 '96 Shardul Kadam, E.I. John W. Kelly, P.E., S.E. 0 Project Engineer Vice President COA: F-9683 Expires: 12/31/2014�,�i tnxTower Report - version 6.1.4.1 t' SEP 8 2014 116.75 Ft Monopole Tower Structural Analysis Report Project Number 88274.002. 01, Application 214793, Revision 6 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Proposed Antenna and Cable Information Table, 2 - Existing and Reserved Antenna and Cable Information Table 3 - Design Antenna and Cable Information 3) ANALYSIS PROCEDURE Table 4 - Documents Provided 3.1) Analysis Method 3.2) Assumptions 4) ANALYSIS RESULTS Table 5 - Section Capacity (Summary) Table 6 — Tower Components vs. Capacity 4,1) Recommendations 5) APPENDIX A tnxTower Output 6) APPENDIX B Base Level Drawing 7) APPENDIX C Additional Calculations tnxTower Report - version 6.1.4.1 February 10, 2014 CC/ BU No. 876445 Page 2 116.75 Ft Monopole Tower Structural Analysis Report Project Number 88274.002.01, Application 214793, Revision 6 1) INTRODUCTION This is a 116.75 ft. monopole mapped by Vertical Structures, I wind speed are unknown. 2) ANALYSIS CRITERIA r= r SEP 8 201 February 10, 2014 CCI BU No. 876445 Page 3 design code and The structural analysis was performed for this tower in accordance with the requirements of TIA/EIA-222-F Structural Standards for Steel Antenna Towers and Antenna Supporting Structures using a fastest mile wind speed of 70 mph with no ice, 18.6 mph with 0.75 inch ice thickness and 50 mph under service loads. Table 1 - Proposed Antenna and Cable Information Center Mounting Line Number Antenna Antenna Number Feed Feed Line Level (ft) Elevation of Manufacturer Antenna Model of Feed Line Note (ft) Antennas Sprint Tma (ft) Lines Size (in) 3 3 Ericsson 80OMHZ SMR FILTER 3 Ericsson RRUS 31 B25 3 Nokia FZHJ-RRH 116.0 117.0 1 5/8 -- 3 Nokia RADAR FILTER 3 Tongyu TYDA-252718DER4-65P Communication Table 2 - Existina and Reserved Antenna and Cable Information Mounting Center Line Number Antenna Number Feed Line 118.0 Level (ft) Elevation Of Manufacturer Antenna Model of Feed Size (in) Note Sprint Tma (ft) Antennas 15/8 3 Lines 9 Ericsson tnxTower Report - version 6.1.4.1 3 Kmw Comm. KMWK-DTMA-HBXWM-17- 118.0 065 -010T -EF 3 Sprint Tma SPRINT TMA W/ ANT 6 15/8 3 9 Ericsson RRUS-11 117.0 6 Rfs Celwave IBC1900HG-1 116.0 3 Ericsson RRUS-11 9 Rfs Celwave ACU -A20 -N 117.0 2 Rfs Celwave APXV9ERR18-C 3 1 3116 1 1 Rfs Celwave APXVERR18-C 1 Platform Mount [LP 601-1] 116.0 1 -- Side Arm Mount [SO 101-3] 3 Nokia FRIA 3 Nokia FRIG 2 Nokia FXFB 105.0 2 Raycap RNSDC-7771-PF-48 1 1 114 2 104.0 6 Rfs Celwave APX17DVW-17DWV-S 3 Rfs Celwave ATMAA1412D-1A20 3 Rfs Celwave APXV18-206517S-ACU 12 1 5/8 1 104.0 1 -- Platform Mount [LP 305-1] 68.1 68.1 6 -- 23" Stadium Light -- -- 1 tnxTower Report - version 6.1.4.1 116.75fYMonopole Tower Structural Analysis Report Project Number 88274.082.0tApplication 2Y4793 Revision February /0,2014 CC/ 8UNo. 876445 Page 4 Mounting Center Line Number Antenna Number Feed Line Mounting Level (ft) Elevation Of Manufacturer Antenna Model of Feed Size (in) Note Antennas Manufacturer Antennas Lines Size (in) Lines 1 - � StadiumLights Mount � - _ _ -� - / 23^Stadium Light 65.6 5 34.0 34.0 2�-- -- - '- - -�-- ---- T-�- l-��- 7 - �____�__ |GhadiumUghto Notes: 1) Existing Equipment u) Reserved Equipment u) Equipment r000Removed Tnhipu-np-minn Ant=nnp andCmb|e Information InfommtiomNot Available 3) ANALYSIS PROCEDURE r=h/�A-n°,"""a"+=P,""/tio* F_ Document Remarks Online Application Tower Mapping Previous Structural analysis Foundation Drawing Geotech Report Antenna Configuration 3.1) Analysis Method Sprint Co -locate Revision #1 214793 / CG|biteo |Vertical Structures Date: 0G/25/20O7i 2066674 | CCI Sites SSC, Project No. TX -0061-B 3947959 CCI Sites | MaloufEngineering |nd,Inc. Job No: B7'OQ4 / Reed Engineering Group � � Project Nn3261 Crown CAD Package 1616542 CCI Sites � 1531914 CCI Sites Dote 02/05/2014 CCI Sites hnxTmxer(version 81.41).acommercially ovoilab|aanalyaiaeoftwarepaokage.waaueedhoonaaiea three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis ieincluded inAppendix A. 3.2) Assumptions 1) Tower and structures were built in accordance with the manufacturer's specifications. 2) The tower and structures have been maintained in accordance with the manufacturer's specification. 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified inTables 1 and 2and the referenced drawings. 4) When applicable, transmission cables are considered as structural components for calculating wind loads aaallowed byT|A/E|A-222-F. 5) Mount areas and weights are assumed based onphotographs provided. This analysis may be affected if any assumptions are not valid or have been made in error. B+T Group should benotified todetermine the effect onthe structural integrity ufthe tower. tnxTower Report - version 6.1.4.1 Center Number Number Feed Mounting Line Of Antenna Antenna Model of Feed Line Level (ft) Elevation Antennas Manufacturer Lines Size (in) InfommtiomNot Available 3) ANALYSIS PROCEDURE r=h/�A-n°,"""a"+=P,""/tio* F_ Document Remarks Online Application Tower Mapping Previous Structural analysis Foundation Drawing Geotech Report Antenna Configuration 3.1) Analysis Method Sprint Co -locate Revision #1 214793 / CG|biteo |Vertical Structures Date: 0G/25/20O7i 2066674 | CCI Sites SSC, Project No. TX -0061-B 3947959 CCI Sites | MaloufEngineering |nd,Inc. Job No: B7'OQ4 / Reed Engineering Group � � Project Nn3261 Crown CAD Package 1616542 CCI Sites � 1531914 CCI Sites Dote 02/05/2014 CCI Sites hnxTmxer(version 81.41).acommercially ovoilab|aanalyaiaeoftwarepaokage.waaueedhoonaaiea three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis ieincluded inAppendix A. 3.2) Assumptions 1) Tower and structures were built in accordance with the manufacturer's specifications. 2) The tower and structures have been maintained in accordance with the manufacturer's specification. 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified inTables 1 and 2and the referenced drawings. 4) When applicable, transmission cables are considered as structural components for calculating wind loads aaallowed byT|A/E|A-222-F. 5) Mount areas and weights are assumed based onphotographs provided. This analysis may be affected if any assumptions are not valid or have been made in error. B+T Group should benotified todetermine the effect onthe structural integrity ufthe tower. tnxTower Report - version 6.1.4.1 116.75 Ft Monopole Tower Structural Analysis Report Project Number 88274.002.01, Application 214793, Revision 6 4) ANALYSIS RESULTS Table 5 - Section Capacity (Summary) February 10, 2014 CCI BU No. 876445 Page 5 Section Elevation (ft) Component Size Critical P (K) SF*P_allow % Pass / Fail No. 74.5-36.91 T e Type Element (K) Capacity L1 116.75 - 1 115.25 L2 115.25 - 74.5 L3 74.5-36.91 L4 36.91 -0 Pole TP14x14x0.375 1 -2.112 855.299 'i 2.3 Pass Pole TP20.82xl4x0.25 2 _ -6.048 842.635 81.4 Pass Pole TP28.08x19.885x0.344 3 10.934 1554.851 82.9 Pass Pole TP35.01x26.677x0.344 4 -17.246 1994.808 92.3 Pass :Summary Pole (1-4) 92.3 Pass RATING = 92.3 Pass Table 6 - Tower Component Stresses vs. Capacity — LC7 Notes Component Elevation (ft) % Capacity Pass / Fail 1 Anchor Rods Base 96.0 Pass 1 Base Plate Base 35.1 Pass 1 Base Foundation Base 51.6 Pass Structure Rating (max from all components) = 96.0% Notes: 1) See additional documentation in "Appendix C — Additional Calculations" for calculations supporting the % capacity consumed. 2) Capacities up to 105% are considered acceptable based on analysis methods used. 4.1) Recommendations The tower and its foundation have sufficient capacity to carry the existing and proposed loads. No modifications are required at this time. GC,CC��IFP, � SEP s 2014 tnxTower Report - version 6.1.4.1 DESIGNED APPURTENANCE LOADING TYPE ELEVATION TYPE ELEVATION Lightning Rod 3/4"x 8'(E) 116.75 (2)APXI7DWV-17DWV-Sw/mount 104 TYDA-252718DER4.65P w/ Mount 116 Pipe (R) Pipe (P) FXFB (R) 104 TYDA-252718DER4-65P w/ Mount 116 FXFB(R) 104 Pipe (P) FRIA (R) 104 TYDA-252718DER4-65P w/ Mount 116 FRIA (R) 104 Pipe (P) FRIA (R) 104 800MHZ SMR FILTER (P) 116 FRIG (R) 104 ............. 80OMHZ SMR FILTER (P) 116 FRIG (R) 104 800MHZ SMR FILTER (P) 116 FRIG (R) 104 RRUS 31 B25 (P) 116 ATMAA1412D-tA20(R) 1.04 RRUS 31 B25 (P) 116 ATMAA1412D-tA20 (R) 104 RRUS 31 B25 (P) 116 (R) 104 FZHJ-RRH (P) 116 RNSDC-7771-1A20 RNSDC-7771-PF-48 (R) 104 FZHJ-RRH (P) 116 RNSDC-7771-PF48 (R) 104 FZHJ-RRH (P) 116 APXV18-206517S-ACU w! Mount Pipe 104 RADAR FILTER (P) 116 (E) '.RADAR FILTER (P) 116 APXV18-206517S-ACU w/ Mount Pipe 104 RADAR FILTER (P) 116 (E) APXV9ERR18-C w/ Mount Pipe (E) 116 APXV18-206517S-ACU w/ Mount Pipe 104 APXVERR18-C w/ Mount Pipe (E) 116 (E) APXV9ERR18-C w/ Mount Pipe (E) 116 Platform Mount [LP 305-1] (E) 104 RRUS-11 (E) 116 23" Stadium Light (E) 68.08 RRUS-11 (E) .116 .23" Stadium Light (E) '.68.08 RRUS-11 (E) .116 23" Stadium Light (E) 68.08 (3) ACU -A20 -N (E) '116 23" Stadium Light (E) 68.08 (3) ACU -A20 -N (E) 116 23" Stadium Light (E) 68.08 (3) ACU -A20 -N (E) 116 23" Stadium Light (E) 68.08 Side Arm Mount [SO 101-3] (E) 116 Stadium Lights Mount (E) 66.83 Platform Mount [LP 601-11 (E) 116 23" Stadium Light (E) 65.58 6'x 2" Mount Pipe (E) 114 23" Stadium Light (E) 65.58 (2) APXI7DWV--17DW V -S w/ Mount 104 23" Stadium Light (E) 65.58 Pipe (R) 23" Stadium Light (E) 65.58 (2) APXI7DWV--17DW V -S w/ Mount 104 23" Stadium tight (E) 65.58 Pipe (R)...... (2) Stadium Lights (E) 134 MATERIAL STRENGTH GRADE Fy Fu GRADE Fy Fu A572-65 165 ksi 180 ksi TOWER DESIGN NOTES 1. Tower is located in Tarrant County, Texas. 2. Tower designed for a 70 mph basic wind in accordance with the TIA/EIA-222-F Standard. 3. Tower is also designed for a 19 mph basic wind with 0.75 in ice. Ice is considered to increase in thickness with height. 4. Deflections are based upon a 50 mph wind. 5. TOWER RATING: 92.3% AXIAL 30 K TEAR MOMENT C 130 kip -ft TORQUE 0 kip -ft ph WIND - 0.750 in ICE AXIAL 17K MOMENT < 1285 kip -ft TORQUE 1 kip -ft REACTIONS - 70 mph WIND p �`J 11 '. �I SEP 8 2, Ll 1' B+T Group j= 1717 S. Boulder, Suite 300 Q`T ra.;_ Tulsa, OK 74119 Phone: (918) 587-4630 FAX: 918 5874630 Job: 88274.002.01- Heritage High School, TX (BU# 87644 Protect: Client: Crown Castle Drawn by: skadam App'd: code: TIA/EIA-222-F Date: 02/10/14 scale: NTS Path: Dwg No. E-1 f C 0 R 0 TIA/EIA-222-F - 70 mph/19 mph 0.750 in Ice Vx _ _ _ __ Vz Global Mast Shear (K) 5 10 15 10 Maximum Values Mx Mz B+T Group 1717 S.Boulder, Suite 300PfOJeC B -T =:- t Tulsa, OK 74119 Phone: (918) 587-4630 FAX: 918 587-4630 Job: 88274.002.01- Heritage High School, TX (8U# 87644 — Client: Crown Castle Drawn by: skadam APP d' code: TIA/EIA-222-F Fate: 02/10/14 Scale: NTS Path Dwg No. E-4 C G R Deflection (in) D I TIA/EIA-222-F - Service - 50 mph 0 Tilt (deg) i I [Client: I it � ' I I code: TIA/EIA-222-F i Path: Dwg No. E-5 i / / I � i I i I II I� i I , / i a I i � / / r 5 Maximum Values Twist (deg) 0 0.05 0.1 0 0.05 o.t B+T Group 1717 S. Boulder, Suite 300oect: Q T -__ + Tulsa, OK 74119 Phone: (918) 587-4630 FAX: 918 587-4630 b 88274.002.01- Heritage High School, TX (BU# 87644 [Client: Crown Castle Drawn by:skadam MPd' code: TIA/EIA-222-F Date: 02/10/14 Scale: NTS Path: Dwg No. E-5 C ig 4i R Feed Line Distribution Chart 0'-116'9" Round Fiat App In Face _ - _ - _ App Out Face • • Truss Leg Face B B+ -T Group ob:88274.002.01- Heritage High School, TX (BU# 87644 Project OI �( r . Drawn by: skadam App'd: vI I OI VI Dale: 02/10/14 scale: NTS I I I I � v• Wf I cl U ' f I I bI I Face B B+ -T Group ob:88274.002.01- Heritage High School, TX (BU# 87644 Project 1717 S.Boulder, Suite 300 diem: Crown Castle Drawn by: skadam App'd: G -T , ..„ Tulsa, OK 74119 code: TIA/EIA-222-F Dale: 02/10/14 scale: NTS Phone: (918) 587-4630 Path: Dwg No. E-7 FAX 918 587 4630 X: WxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 1 of 16 B+T Group Project Date 1717 S.Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle skadam FAX, (918) 587-4630 TowerInput There is a pole section. This tower is designed using the TIA/EIA-222-F standard. The following design criteria apply: Tower is located in Tarrant County, Texas. Basic wind speed of 70 mph. Nominal ice thickness of 0.750 in. Ice thickness is considered to increase with height. Ice density of 56.000 pcf. A wind speed of 19 mph is used in combination with ice. Temperature drop of 50.000 °F. Deflections calculated using a wind speed of 50 mph. A non-linear (P -delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1.333. Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Tapered Pole SectionGeometry Section Elevation Section Splice Number Top Bottom Wall Bend Pole Grade in in' Length Length of Diameter Diameter Thickness Radius 14.494 16.452 ft ft ft Sides in in in in 16.452 Ll 116.750-115.25 1.500 0.000 12 14.000 14.000 0.375 1.500 A572-65 4.923 0 36.833 541.237 5.448 3.082 12.328 21.554 16.559 894.303 (65 ksi) L2 115.250-74.500 40.750 2.600 12 14.000 20.820 0.250 1.000 A572-65 102.348 2136.140 10.645 4.408 12.823 29.071 30.701 3014.587 9.930 14.545 (65 ksi) L3 74.500-36.910 40.190 3.510 12 19.885 28.080 0.344 1.375 A572-65 14.345 6.228 18.118 36.245 38.371 5885.795 12.411 18.135 324.551 11926.216 (65 ksi) L4 36.910-0.000 40.420 Gusset Gusset Grade 12 26.677 35.010 0.344 1.375 A572-65 Thickness Aj Factor Stitch Bolt Stitch Bolt (perface) (65 ksi) I Tapered Pole Properties Section Tip Dia. Area I r C 11C J XQ w w/t in in' in' in in in' in' in, in LI 14.494 16.452 389.837 4.878 7.252 53.756 789.915 8.097 2.747 7.325 14.494 16.452 389.837 4.878 7.252 53.756 789.915 8.097 2.747 7.325 L2 14.494 11.069 267.110 4.923 7.252 36.833 541.237 5.448 3.082 12.328 21.554 16.559 894.303 7.364 10.785 82.923 1812.100 8.150 4.910 19.639 L3 21.135 21.630 1054.222 6.996 10.300 102.348 2136.140 10.645 4.408 12.823 29.071 30.701 3014.587 9.930 14.545 207.253 6108.370 15.110 6.604 19.212 L4 28.367 29.147 2579.805 9.427 13.819 186.691 5227.384 14.345 6.228 18.118 36.245 38.371 5885.795 12.411 18.135 324.551 11926.216 18.885 8.461 24.615 .Tower, r Gusset Gusset Gusset Grade Adjust. Factor Adjust. Weight Mult. Double Angle Double Angle Elevation Area Thickness Aj Factor Stitch Bolt Stitch Bolt (perface) Ar Spacing Spacing Diagonals Horizontals ft L1 f? ini 116.750-115.2 50 i SEP 8 9LQ1 I tnxTower Job Page 2 of 16 Face 88274.002.01- Heritage High School, TX (BU# 876445) Placement Total Project Weight Date B+T Group Type Number 16:37:32 02/10/14 1717 S. Boulder, Suite 300 Leg Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle C No skadam FAX: (918) 587-4630 2 No Ice 0.000 Tower Gusset Gusset Gusset Grade Adjust. Factor Adjust. Weight Mult. Double Angle Double Angle Elevation Area Thickness AJ Factor Stitch Bolt Stitch Bolt (perface) Ar Spacing Spacing Diagonals Horizontals ft ft' tn... 0.000 to in L2 115.250-74.50 2" Ice 0.000 0.009 0 L3 1 1 1 4" Ice 0.000 74.500-36.910 TSZ 999 C No L4 1 I 1 1 No Ice 36.9104000 0.001 067/xxxM-8AWG( Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Face Allow Component Placement Total Number Clear Width or Perimeter Weight or Shield Type Number Per Row Spacing Diameter Leg ft in in rn klf _ +n� Feed Line/Linear Appurtenances - Entered As Area Description Face Allow Component Placement Total CAj Weight or Shield Type Number Leg ft fig ft _ klr TSZ 999 C No CaAa (Out Of 116.000 - 0.000 2 No Ice 0.000 0.001 067/xxxM-8AWG( Face) 1/2" Ice 0.000 0.002 1-3/16") 1" Ice 0.000 0.004 (E -Outside Shielded) 2" Ice 0.000 0.009 4" Ice 0.000 0.026 TSZ 999 C No CaAa (Out Of 116.000 - 0.000 1 No Ice 0.119 0.001 067/xxxM-8AWG( Face) 1/2" Ice 0.219 0.002 1-3/16") 1" Ice 0.319 0.004 (E -Outside) 2" Ice 0.519 0.009 4" Ice 0.919 0.026 FIBER ONLY CABLE C No CaAa (Out Of 116.000 - 0.000 1 No Ice 0.000 0.000 16(5/8") Face) 1/2" Ice 0.000 0.001 (P -Outside Shielded) V Ice 0.000 0.002 2" Ice 0.000 0.007 4" Ice 0.000 0.023 LDF7-50A(I -5/8") A No CaAa (Out Of 104.000 - 0.000 3 No Ice 0.198 0.001 (E -Outside) Face) 1/2" Ice 0.298 0.002 1" Ice 0.398 0.004 2" Ice 0.598 0.011 4" Ice 0.998 0.030 LDF7-50A(I-5/8") A No CaAa (Out Of 104.000 - 0.000 9 No Ice 0.000 0.001 (E -Outside Shielded) Face) 1/2" Ice 0.000 0.002 1" Ice 0.000 0.004 2" Ice 0.000 0.011 4" Ice 0.000 0.030 ASU9323TYPO1( 1-1/4) B No CaAa (Out Of 104.000 - 0.000 1 No Ice 0.000 0.001 (R -Outside Shielded) Face) 1/2" Ice 0.000 0.002 1" Ice 0.000 0.004 2" Ice 0.000 0.009 4" Ice 0.000 0.028 MxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 3 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Phone: (918) 587-4630 Crown Castle Designed by FAX: (918) 587-4630 1 1skadam ...Description" Face Allow Component l� Plaa cement Total C,4A,1 Weight Section or Shield Type C{A,a Number Out Face Leg _.. _ _._ _._..__f f� fFl f K L1 116.750-115.256 A 0.000 0.000 0.000 0.056 0.000 1/2" Rigid Conduit A No CaAa (Out Of 33.500 - 0.000 1 No Ice 0.000 0.001 (E -Shielded) _ A C Face) 0.000 1/2" Ice 0.000 0.001 L2 115.250-74.500 A 0.000 0.000 1" Ice 0.000 0.002 0.000 0.000 B 0.000 0.000 2" Ice 0.000 0.007 0.000 C 0.000 0.000 4" Ice 0.000 0.022 L3 74.500-36.910 A 0.000 0.000 0.000 23.738 0.378 LDF1-50A(1/4") C No Inside Pole 68.000 - 0.000 6 No Ice 0.000 0.000 (E) 0.000 11.779 C 0.000 0.000 1/2" Ice 0.000 0.000 L4 36.910-0.000 A 0.000 0.000 1" Ice 0.000 0.000 B 0.000 0.000 2" Ice 0.000 0.000 0.121 SEP C 0.000 0.000 4" Ice 0.000 0.000 0.000 0.000 10.865 0.448 36.910-0.000 Safety Line 3/8 A No CaAa (Out Of 116.750 - 0.000 1 No Ice 0.037 0.000 (E) Face) 1/2" Ice 0.137 0.001 0.000 0.112 1" Ice 0.238 0.001 0.000 0.000 0.000 10.281 0.418 2" Ice 0.437 0.002 4" Ice 0.838 0.004 •MIT' •r• •I ' Tower Tower Face AR AF CaAA CAA Weight Section Elevation AR AR C{A,a In Face Out Face .ft Elevation t, ft f� ft' K L1 116.750-115.256 A 0.000 0.000 0.000 0.056 0.000 ftZ, ft, f? B 0.000 0.000 0.000 0,000 0.000 . 116.750-115.250 _ A C 0.000 0.000 0.000 0.089 0.003 L2 115.250-74.500 A 0.000 0.000 0.000 19.051 0.299 0.000 0.000 B 0.000 0.000 0.000 0.000 0.019 0.000 C 0.000 0.000 0.000 4.849 0.141 L3 74.500-36.910 A 0.000 0.000 0.000 23.738 0.378 1.399 B 0.000 0.000 0.000 0.000 0.025 0.000 0.000 0.000 11.779 C 0.000 0.000 0.000 4.473 0.141 L4 36.910-0.000 A 0.000 0.000 0.000 23.309 0.388 B 0.000 0.000 0.000 0.000 0.024 0.121 SEP C 0.000 0.000 0.000 4.392 0.141 Feed Line/Linear Appurtenances Section Areas - With Ice Tower Tower Face Ice AR AR C{A,a CA,, Weight Section Elevation or Thickness In Face Out Face ftLeg in ftZ, ft, f? ft2 K L1 . 116.750-115.250 _ A 0-02 0.000 0.000 0.000 0.318 0.002 B 0.000 0.000 0.000 0.000 0.000 C 0.000 0.000 0.000 0.220 0.009 L2 115.250-74.500 A 0.850 0.000 0.000 0.000 41.030 1.399 B C 0.000 0.000 0.000 0.000 0.000 0.000 0.000 11.779 0.474 0.0957V,, j - L3 74.500-36.910 A 0.798 0.000 0.000 0.000 49.306 1.767 B 0.000 0.000 0.000 0.000 0.121 SEP 8 I'llL4 C 0.000 0.000 0.000 10.865 0.448 36.910-0.000 A 0.750 0.000 0.000 0.000 46.863 1.696 B 0.000 0.000 0.000 0.000 0.112 C 0.000 0.000 0.000 10.281 0.418 tnxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 4 of 16 B+T Group Project Date 1717S.Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle Skadam FAX: (918) 587-4630 Feed Line Center of Pressure Description Section Elevation CP,V CP, CP,I CP, Placement CAA.a Ice Ice Weight ft in in in in L1 116.750-115.250 -0.071 -0.011 -0.133 4145 L2 115.250-74.500 -0.110 -0.461 -0.189 -0.682 L3 74.500-36.910 -0.113 -0.626 -0.202 -0.940 L4 36.910-0.000 -0,120 -0.666 -0.220 -1.030 Discrete Tower Loads Description Face Offset Offsets- Azimuth Placement CAA.a C4A a Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft fr .ft, ft' K ft ft Lightning Rod 34 x 8' A From Leg 0.000 0.000 116.750 No Ice 0.600 0.600 0.030 (E) 0.000 1/2" Ice 1.415 1.415 0.036 4.000 1" Ice 2.246 2.246 0.047 2" Ice 3.669 3.669 0.086 4" Ice 5.742 5.742 0.231 6'x 2" Mount Pipe A From Leg 0.000 0.000 114.000 No Ice 1.425 1.425 0.022 (E) 0.000 1/2" Ice 1.925 1.925 0.033 3.000 1" Ice 2.294 2.294 0.048 2" Ice 3.060 3.060 0.090 4" Ice 4.702 4.702 0231 TYDA-252718DER4-65P w/ A From Leg 4.000 0.000 1 16.000 No Ice 8.301 5.492 0.077 Mount Pipe 0.000 1/2" Ice 8.893 6.462 0.138 (P) l .000 1" Ice 9.465 7.256 0.206 2" Ice 10.640 8.895 0.368 4" Ice 13.110 12.525 0.825 TYDA-252718DER4-65P w/ B From Leg 4.000 0.000 116.000 No Ice 8.301 5.492 0.077 Mount Pipe 0.000 1/2" Ice 8.893 6.462 0.138 (P) 1.000 1" Ice 9.465 7.256 0.206 2" Ice 10.640 8.895 0.368 4" Ice 13.110 12525 0.825 TYDA-252718DER4-65P w/ C From Leg 4.000 0.000 116,000 No Ice 8.301 5.492 0.077 Mount Pipe 0.000 1/2" Ice 8.893 6.462 0.138 (P) I D00 I" Ice 9.465 7.256 0.206 2" Ice 10.640 8.895 0.368 4" Ice 13.110 12.525 0.825 800MHZ SMR FILTER A From Leg 4.000 0.000 116.000 No Ice 0.758 0.254 0.009 (P) 0.000 1/2" Ice 0.877 0.335 0.014 1.000 1" Ice 1.004 0.424 0.020 2" Ice 1.285 0.629 0.038 4" Ice 1.950 1.142 0.102 800MHZ SMR FILTER B From Leg 4.000 0.000 116.000 No Ice 0.758 0.254 0.009 (P) 0.000 1/2" Ice 0.877 0.335 0.014 1.000 1" Ice 1.004 0.424 0.020 2" Ice 1.285 0.629 0.038 4" Ice 1.950 1.142 0.102 WxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 5 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle skadam FAX.: (918) 587-4630 Description Face Offset Offs ets:�Azimufh w Placement CAAa C .4,1 Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft 0 ft ftp fiz K ft ft 8004H2 - SMR FILTER C From Leg 4.000 0.000 116.000 No Ice 0.758 0.254 0.00-9--- (P) 0.000 1/2" Ice 0.877 0.335 0.014 1.000 V Ice 1.004 0.424 0.020 2" Ice 1.285 0.629 0.038 4" Ice 1.950 1.142 0.102 RRUS 31 B25 A From Leg 4.000 0.000 116.000 No Ice 1.893 1.492 0.056 (P) 0.000 1/2" Ice 2.081 1.663 0.072 1.000 1" Ice 2.277 1.844 0.091 2" Ice 2.696 2.230 0.137 4" Ice 3.637 3.106 0.269 RRUS 31 B25 B From Leg 4.000 0.000 116.000 No Ice 1.893 1.492 0.056 (P) 0.000 1/2" Ice 2.081 1.663 0.072 1.000 1" Ice 2.277 1.844 0.091 2" Ice 2.696 2.230 0.137 4" Ice 3.637 3.106 0269 RRUS 31 B25 C From Leg 4.000 0.000 116.000 No Ice 1.893 1.492 0.056 (P) 0.000 1/2" Ice 2.081 1.663 0.072 1.000 V Ice 2.277 1.844 0.091 2" Ice 2.696 2.230 0.137 4" Ice 3.637 3.106 0.269 FZHJ-RRH A From Leg 4.000 0.000 116.000 No Ice 1.472 1.184 0.055 (P) 0.000 1/2" Ice 1.645 1.336 0.073 1.000 V Ice 1.827 1.496 0.094 2" Ice 2.218 1.842 0.145 4" Ice 3.102 2.638 0.289 FZHJ-RRH B From Leg 4.000 0.000 116.000 No Ice 1.472 1.184 0.055 (P) 0.000 1/2" Ice 1.645 1.336 0.073 1.000 V Ice 1.827 1.496 0.094 2" Ice 2.218 1.842 0.145 4" Ice 3.102 2.638 0.289 FZHJ-RRH C From Leg 4.000 0.000 116.000 No Ice 1.472 1.184 0.055 (P) 0.000 1/2" Ice 1.645 1.336 0.073 1.000 V Ice 1.827 1.496 0.094 2" Ice 2,218 1.842 0.145 4" Ice 3.102 2.638 0.289 RADAR FILTER A From Leg 4.000 0.000 116.000 No Ice 1.143 0.314 0.022 (P) 0.000 1/2" Ice 1.289 0.404 0.029 1.000 1" Ice 1.443 0.502 0.038 2" Ice 1.778 0.723 0.062 4" Ice 2.550 1.270 0.140 RADAR FILTER B From Leg 4.000 0.000 116.000 No Ice 1.143 0.314 0.022 (P) 0.000 1/2" fee 1.289 0.404 0.029 1.000 1" Ice 1.443 0.502 0.038 2" Ice 1.778 0.723 0.062 4" Ice 2.550 1.270 0.140 RADAR FILTER C From Leg 4.000 0.000 116.000 No Ice 1.143 0.314 0.022 (P) 0.000 1/2" Ice 1.289 0.404 0.029 1.000 V Ice 1.443 0.502 0.038 2" Ice 1.778 0.723 0.062 4" Ice 2.550 1.270 0.140 APXV9ERRI8-C w/ Mount A From Leg 4.000 0.000 116.000 No Ice 8.498 6.946 0.076 Pipe 0.000 1/2" Ice 9.149 8.127 0.144 (E) 1.000 1" Ice 9.767 9.021 0.220 2" Ice 11.031 10.844 0.399 4" Ice 13.679 14.851 0.902 APXVERRI8-C w/ Mount B From Leg 4.000 0.000 116.000 No Ice 8.498 6.946 0.076 Pipe 0.000 1/2" Ice 9.149 8.127 0.144 >,I Job Page tnxTower 88274.002.01- Heritage High School, TX (BU# 876445) 6 of 16 Project Date B+T Group 16:37:32 02/10/14 1717 S. Boulder, suite 300 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle skadam FAX: (918) 587-4630 � Descriptionf�Face �Offset� Offsets. �Azimuth Placement � �-QIA,�, � � �S.n� C4A.4 Weight� or Type Horz Adjustment Front Side Leg Lateral Vert ft ft fig ft, K ft ft (E) 1.000 1" Ice 9.767 9.021 0.220 2" Ice 11.031 10.844 0.399 4" Ice 11679 14.851 0.902 APXV9ERRI8-C w/ Mount C From Leg 4.000 0.000 116.000 No Ice 8.498 6.946 0.076 Pipe 0.000 1,12" Ice 9.149 8.127 0.144 (E) 1.000 V Ice 9.767 9.021 0.220 2" Ice 1L031 10.844 0.399 4" Ice 13.679 14.851 0.902 RRUS-I I A From Leg 4.000 0.000 116.000 No Ice 4.424 1.186 0.055 (E) 0.000 1/2" Ice 4.708 1.351 0.081 1.000 V Ice 5.001 1.526 0.110 2" Ice 5.613 1.900 0.179 4" Ice 6.940 2.753 0.368 RRUS-11 B From Leg 4.000 0.000 116.000 No Ice 4.424 1.186 0.055 (E) 0.000 1/2" Ice 4.708 1.351 0.081 1.000 V Ice 5.001 L526 0.110 2" Ice 5.613 1.900 0.179 4" Ice 6.940 2.753 0.368 RRUS-11 C From Leg 4.000 0.000 116.000 No Ice 4.424 1.186 0.055 (E) 0.000 1/2" Ice 4.708 1351 0.081 1.000 V Ice 5.001 1.526 0.110 2" Ice 5.613 1.900 0.179 4" Ice 6.940 2.753 0.368 (3) ACU -A20 -N A From Leg 4.000 0.000 116.000 No Ice 0.078 0.136 0.001 (E) 0.000 1/2" Ice 0.121 0.189 0.002 1.000 V Ice 0.173 0,251 0.004 2" Ice 0.302 0.400 0.012 4" Ice 0,665 0.802 0.045 (3) ACU -A20 -N B From Leg 4.000 0.000 116.000 No Ice 0.078 0.136 0.001 (E) 0.000 1/2" Ice 0.121 0.189 0.002 1.000 1" Ice 0,173 0.251 0.004 2" Ice 0.302 0.400 0.012 4" Ice 0.665 0.802 0,045 (3) ACU -A20 -N C From Leg 4.000 0.000 116.000 No Ice 0.078 0.136 0.001 (E) 0,000 1/2" Ice 0.121 0.189 0.002 1.000 1" Ice 0.173 0251 0.004 2" Ice 0.302 0.400 0,012 4" Ice 0.665 0.802 0.045 Side Arm Mount [SO 10 1 -31 C None 0.000 116.000 No Ice 7.500 7.500 0.252 (E) 1/2" Ice 8.900 8.900 0.333 1" Ice 10.300 10.300 0.414 2" Ice 13.100 13.100 0.576 4" Ice 18.700 18.700 0.900 Platform Mount [LP 601-1 J C None 0.000 116.000 No Ice 28.470 28.470 1.122 (E) 1/2" Ice 33.590 33.590 1.514 1" Ice 38.710 38.710 1.905 2" Ice 48,950 48.950 2.689 4" Ice 69.430 69.430 4.255 *_a (2) APXI 7DW V-17DW V -S A From Leg 4.000 0.000 104.000 No Ice 10.023 6.408 0.062 w/ Mount Pipe 0.000 1/2" Ice 10.615 7.339 0.134 (R) 1.000 1" Ice 11.191 8.174 0.214 2" Ice 12375 9.900 0.399 4" Ice 14.865 13.566 0.903 (2) APXI7DW V-17DW V -S B From Leg 4.000 0.000 104.000 No Ice 10.023 6.408 0.062 w( Mount Pipe 0.000 1/2" Ice 10.615 7.339 0.134 (R) 1.000 1" Ice 11.191 8.174 0,214 tnxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 7 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle skadam FAX: (918) 587-4630 Descriptions �� Face �Offset Offsets. Azimuth Placement C,3AA�- Ca,9a � �Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft 0 ft fry ft, K ft _. _. %t 2" Ice 12.375 9.900 0.399 4" Ice 14.865 13.566 0.903 (2)APXI7DWV-17DWV-S C From Leg 4.000 0.000 104.000 NoIce 10.023 6.408 0.062 w/ Mount Pipe 0.000 1/2" Ice 10.615 7.339 0.134 (R) 1.000 V Ice 11.191 8.174 0.214 2" Ice 1.2.375 9.900 0.399 4" Ice 14.865 13.566 0.903 FXFB A From Leg 4.000 0.000 104.000 No Ice 4.128 1.123 0.050 (R) 0.000 1/2" Ice 4.400 1.304 0.072 1.000 V Ice 4.681 1.493 0.098 2" Ice 5.268 1.899 0.159 4" Ice 6.546 2.812 0.329 FXFB B From Leg 4.000 0.000 104.000 No Ice 4.128 1.123 0.050 (R) 0.000 1/2" Ice 4.400 1.304 0.072 1.000 I" Ice 4.681 1.493 0.098 2" Ice 5.268 1.899 0.159 4" Ice 6.546 2.812 0.329 FRIA A From Leg 4.000 0.000 104.000 No Ice 4.128 1.112 0.048 (R) 0.000 1/2" Ice 4.400 1.293 0.070 1.000 1" Ice 4.681 1.482 0.096 2" Ice 5.268 1.887 0.157 4" Ice 6.546 2.799 0.327 FRIA B From Leg 4.000 0.000 104.000 No Ice 4.128 1.112 0,048 (R) 0.000 1/2" Ice 4.400 1.293 0.070 1.000 1" Ice 4.681 1.482 0.096 2" Ice 5.268 1.887 0.157 4" Ice 6.546 2.799 0.327 FRIA C From Leg 4.000 0.000 104.000 No Ice 4.128 1.112 0.048 (R) 0.000 1/2" Ice 4.400 1.293 0.070 1.000 V Ice 4.681 1.482 0.096 2" Ice 5.268 1.887 0.157 4" Ice 6.546 2.799 0.327 FRIG A From Leg 4.000 0.000 104.000 No Ice 2.797 1.096 0.048 (R) 0.000 1/2" Ice 3.023 1.261 0.065 1.000 V Ice 3.257 1.435 0.085 2" Ice 3.751 1.809 0.135 4" Ice 4.843 2.661 0.275 FRIG B From Leg 4.000 0.000 104.000 No Ice 2.797 1.096 0.048 (R) 0.000 1/2" Ice 3.023 1.261 0.065 1.000 V Ice 3.257 1.435 0.085 2" Ice 3.751 1.809 0.135 4" Ice 4.843 2.661 0.275 FRIG C From Leg 4.000 0.000 104.000 No Ice 2.797 1.096 0.048 (R) 0.000 1/2" Ice 3.023 1.261 0.065 1.000 1" Ice 3.257 1.435 0.085 2" Ice 3.751 1.809 0.135 _J 4" Ice 4.843 2.661 0.275 ATMAA1412D-IA20 A From Leg 4.000 0.000 104.000 No Ice 1.167 0.467 0.013 (R) 0.000 1/2" Ice 1.314 0.575 0.021 1.000 V Ice 1.469 0.691 0.030 c 2" Ice 1.806 0.951 0.056 4" Ice 2.584 1.573 0.137 Q ATMAA1412D-1A20 B From Leg 4.000 0.000 104.000 No Ice 1.167 0.467 0.013 (R) 0.000 1/2" Ice 1.314 0.575 0.021 Lrz�J 1.000 V Ice 1.469 0.691 0.030 2" Ice 1.806 0.951 0.056 re~ c-_ 4" Ice 2.584 1.573 0.137 :- Dishes Job Page WxTower 88274.002.01- Heritage High School, TX (BU# 876445) 8 of 16 Project Date B+T Group 16:37:32 02110/14 1717S.Boulder, Suite 300 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle SlCadaltl FAX: (918) 587-4630 Description Face Offset Offsets. Azimuth Placement C4A.I C CAA Weight or Type Horz Adjustment Front Side Leg Lateral Vert ft o ft fig ft, K ft ft ATMAA14121)-IA20 C From Leg 4.000 0.000 104.000 No Ice 1.167 0.467 0.013 (R) 0.000 1/2" Ice 1.314 0.575 0.021 1.000 V Ice 1.469 0.691 0.030 2" Ice 1.806 0.951 0.056 4" Ice 2.584 1.573 0.137 RNSDC-7771-PF-48 A From Leg 4.000 0.000 104.000 No Ice 1.284 I.376 0.020 (R) 0.000 1/2" Ice 1.455 1.557 0.043 1.000 V Ice 1.636 1.746 0.069 2" Ice 2.023 2.151 0.131 4" Ice 2.901 3.064 0.302 RNSDC-7771-PF-48 B From Leg 4.000 0.000 104.000 No Ice 1.284 1.376 0.020 (R) 0.000 1/2" Ice 1.455 1.557 0.043 1.000 V Ice L636 1.746 0.069 2" Ice 2.023 2.151 0.131 4" Ice 2.901 3.064 0.302 APXV 18-206517S-ACU w/ A From Leg 4.000 0.000 104.000 No Ice 5.404 4.700 0.052 Mount Pipe 0.000 1/2" Ice 5.960 5.860 0.097 (E) 1.000 I" Ice 6.481 6.734 0.150 2" Ice 7.547 8.515 0.280 4" Ice 9.919 12.277 0.679 APXV18-2065175-ACU w/ B From Leg 4.000 0.000 104.000 No Ice 5.404 4.700 0.052 Mount Pipe 0.000 I/2" Ice 5.960 5.860 0.097 (E) 1.000 1" Ice 6.481 6.734 0.150 2" Ice 7.547 8.515 0,280 4" Ice 9.919 12.277 0.679 APXV18-206517S-ACU w/ C From Leg 4.000 0.000 104.000 No Ice 5.404 4.700 0.052 Mount Pipe 0.000 1/2" Ice 5.960 5.860 0.097 (E) 1.000 i" Ice 6.481 6.734 0.150 2" Ice 7.547 8.515 0.280 4" Ice 9.919 12.277 0.679 Platform Mount SLP 305-11 C None 0.000 104.000 No Ice 18.010 18.010 1.121 (E) 1/2" Ice 23.330 23.330 1.352 1" Ice 28.650 28.650 1.584 2" Ice 39,290 39290 2.046 4" ice 60.570 60.570 1972 *Ca r(o,« Stadium Lights Mount C From Face 0.500 0.000 66.830 No Ice 8.900 5.900 0.230 (E) 0.000 1/2" Ice 13.800 8.700 0.320 0.000 V Ice 18.700 1 1.500 0.410 2" Ice 28.500 17.100 0.600 4" Ice 48.100 28.300 0.980 (2) Stadium Lights A From Leg 0.500 0.000 34.000 No Ice 1.778 1.778 0.050 (E) 0.000 I/2" Ice 1.983 1.983 0.074 0.000 V Ice 2.200 2.200 0.101 2" Ice 2.667 2.667 0.164 4" Ice 3.733 3.733 0.330 Dishes MxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 9 of 16 B+T Croup Project Date 1717S.Boulder, suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle FAX., (918) 587-4630 skadam Description Face Dish Offset -Offsets. Azimuth 3 dB Elevation Outside Aperture Weight or Type Type Horz Adjustment Beam Diameter Area Leg Lateral Width Vert ft. !t 23" Stadium Light C Paraboloid w/o From 0.500 0.000 _--=fit 68.080 1.917 No Ice -f? _ 2.890 _K 0.050 (E) Radome Face 1.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 68.080 1.917 No Ice 2.890 0.050 (E) Radome Face 3.000 1/2" Ice 3.140 0.070 0.000 I" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 68.080 1.917 No Ice 2.890 0.050 (E) Radome Face 5.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 68.080 1.917 No Ice 2.890 0.050 (E) Radome Face -1.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 68.080 1.917 No Ice 2.890 0.050 (E) Radome Face -3.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 68.080 1.917 No Ice 2.890 0.050 (E) Radome Face -5.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 65.580 1.917 No Ice 2.890 0.050 (E) Radome Face 0.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 65.580 1.917 No Ice 2.890 0.050 (E) Radome Face 2.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 65.580 1.917 No Ice 2.890 0.050 (E) Radome Face 4.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180 23" Stadium Light C Paraboloid w/o From 0.500 0.000 65.580 1.917 No Ice 2.890 0.050 (E) Radome Face 2.000 1l2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 2" Ice 3.910 0.110 4" Ice 4.940 0.180. 23" Stadium Light C Paraboloid w/o From 0.500 0.000 65.580 1.917 No Ice 2.890 0.050 (E) Radome Face -4.000 1/2" Ice 3.140 0.070 0.000 1" Ice 3.400 0.080 C 2" Ice 3.910 0.11 J 4" Ice 4.940 0.18 Cd .lin-n C/^) WxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 10 of 16 B+T Group Project Date 1717S.Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle Skadam FAX: (918) 587-4630 • • Combinations Comb. Description No. I Dead Only 2 Dead+W ind 0 deg - No Ice 3 Dead+Wind 30 deg - No Ice 4 Dead+W ind 60 deg - No Ice 5 Dead+Wind 90 deg - No Ice 6 Dead+Wind 120 deg - No Ice 7 Dead+Wind 150 deg- No Ice 8 Dead+W ind 180 deg - No Ice 9 Dead+Wind 210 deg - No Ice 10 Dead+Wind 240 deg - No Ice 1 1 Dead+W ind 270 deg - No Ice 12 Dead+W ind 300 deg - No Ice 13 Dead+W ind 330 deg - No Ice 14 Dead+Ice+Temp 15 Dead+W ind 0 deg+Ice+Temp 16 Dead+Wind 30 deg+Ice+Temp 17 Dead+Wind 60 deg+Ice+Temp 18 Dead+Wind 90 deg+Ice+Temp 19 Dead+W ind 120 deg+Ice+Temp 20 Dead+W ind 150 deg+Ice+Temp 21 Dead+W ind 180 deg+Ice+Temp 22 Dead+W ind 210 deg+Ice+Temp 23 Dead+W ind 240 deg+Ice+Temp 24 Dead+Wind 270 deg+Ice+Temp 25 Dead+Wind 300 deg+Ice+Temp 26 Dead+Wind 330 deg+Ice+Temp 27 Dead+W ind 0 deg - Service 28 Dead+Wind 30 deg - Service 29 Dead+W ind 60 deg - Service 30 Dead+Wind 90 deg - Service 31 Dead+W ind 120 deg - Service 32 Dead+Wind 150 deg - Service 33 Dead+W ind 180 deg - Service 34 Dead+W ind 210 deg - Seryice 35 Dead+W ind 240 deg - Service 36 Dead+W ind 270 deg - Service 37 Dead+Wind 300 deg - Service 38 Dead+W ind 330 deg - Service I Maximum Member Forces I Section Elevation No. ft L1 116.75- Type 115.25 L2 115.25 - 74.5 Component Condition Gov. Force Major Axis Minor Axis Type Load Moment Moment Comb. K kip ft kipft Pole Max Tension 1 0.000 0.000 0.000 Max. Compression 14 -4.558 0.004 0.026 Max. Mx 11 -2.126 4.683 0.016 Max. My 2 -2.112 0.001 4.703 Max. Vy 5 3.476 -4.680 0.015 Max. Vx 2 -3.485 0.001 4.703 Max. Torque 12 -0.015 Pole Max Tension 1 0.000 0.000 0.000 Max. Compression 14 -12.924 -0.423 1.330 Max. Mx 5 -6.084 -275.053 -0.804 Max. My 2 -6.046 0.910 277.029 I Maximum Reactions I Location Condition tnxTowe Job Horizontal, X ., . ... Horizontal, Z Load Page K K 88274.002.01- Heritage High School, TX (BU# 876445) 11 of 16 B+T Group Project 21 29.639 -0.003 -1.469 Date 11 1717 S. Boulder, Suite 300 14.555 0.028 Max. H, 2 17.262 16:37:32 02/10114 15.672 Tulsa, OK 74119 Client 1285.044 0.037 15.672 Max. M, Designed by 1206.197 Phone: (918) 587-4630 -0.047 Crown Castle 9 0.555 7,426 -13.084 FAX: (918) 587-4630 1 17.262 0.000 0.000 Min, H, skadam Section r, I, ,,.:n. ,s: m�.,C-,._.H,a-=:r.m.,.�� , ,- .-��,n on .�,,�u� Elevation Component Condition �.�mee Gov. _ Fm,�e Force ..,,-�.._,, ,,. -is ., Major Axis M -in,, A,,,-.., Minor Axis -0.037 No. ft Type 8 Load -0.037 Moment Moment 11 -1206.182 .. 0.028 Comb. K -0.519 7.142 13.765 _ -- Max. Vy�� 5 -� _ - 9.172 -275.053 --0.804 -1055.678 0.231 r_ Max. Vx 2 -9.238 0.910 277.029 1082.297 -619.072 0.203 Max. Torque 12 Dead+Wind 180 deg - No Ice 17.262 -0.378 15.262 L3 74.5-36.91 Pole Max Tension 1 0.000 0.000 0.000 -7.426 13.084 1078.223 Max. Compression 14 -20.714 -0.164 1.114 17.262 -12.718 7.541 Max. Mx 5 -11.020 -667.890 -3.295 Dead+Wind 270 deg - No Ice 17.262 -14.555 Max. My 2 -10.934 2.430 700.172 Dead+Wind 300 deg - No Ice 17.262 Max. Vy 5 12.045 -667.890 -3.295 trL� _� 1 Max. Vx 2 -13.189 2.430 700.172 Max. Torque 10 0.787 L4 36.91 -0 Pole Max Tension 1 0.000 0.000 0.000 Max. Compression 14 -29.639 0.192 3.430 Max. Mx 5 -17.248 -1206.197 -4.646 Max. My 2 -17.246 4.100 1285.044 Max. Vy 5 14.572 -1206.197 -4.646 Max. Vx 2 -15.690 4.100 1285.044 Max. Torque 9 0.715 I Maximum Reactions I Location Condition Gov. Vertical Horizontal, X ., . ... Horizontal, Z Load K K K Overturning Comb. Torque Pole Max. Vert 21 29.639 -0.003 -1.469 Max. H, 11 17262 14.555 0.028 Max. H, 2 17.262 0.037 15.672 Max. M,, 2 1285.044 0.037 15.672 Max. M, 5 1206.197 -14.555 -0.047 Max. Torsion 9 0.555 7,426 -13.084 Min. Vert 1 17.262 0.000 0.000 Min, H, 5 17.262 -14.555 -0.047 Min. H, 8 17.262 -0.037 -15.262 Min. M, 8 -1256.574 -0.037 -15.262 Min- M, 11 -1206.182 14.555 0.028 Min. Torsion 13 -0.519 7.142 13.765 Tower Mast Reaction Summary Load Vertical Shear, Shear Overturning Overturning Torque Combination Moment, M Moment, M K K K kip ft kip ft kip ft Dead Only 17.262 0.000 0.000 -0.136 0.003 0.000 Dead+Wind 0 deg - No lee 17.262 -0.037 -15.672 -1285.044 4.100 0,204 �4 Dead+Wind 30 deg - No Ice 17.262 7.078 -13.728 -1122.976 -587.875 -0.167 L Dead+Wind 60 deg - No Ice 17.262 12.541 -8.524 -688.899 -1039.289 -0.174 ' Dead+Wind 90 deg - No Ice 17.262 14.555 0.047 4.646 -1206.197 0.119 Dead+Wind 120 deg - No Ice 17.262 12.755 7.605 627.808 -1055.678 0.231 r_ ` Dead+Wind 150 deg - No Ice 17.262 7.490 13.121 1082.297 -619.072 0.203 C Dead+Wind 180 deg - No Ice 17.262 0.037 15.262 1256.574 -4.110 -0.203 Dead+Wind 210 deg - No Ice 17.262 -7.426 13.084 1078.223 611.969 -0.555 J Dead+Wind 240 deg - No Ice 17.262 -12.718 7.541 620.714 1051.592 -0.435 Dead+Wind 270 deg - No Ice 17.262 -14.555 -0.028 -3.566 1206.182 -0.120- Dead+Wind 300 deg - No Ice 17.262 -12.578 -8.588 -695.988 1043.348 0.376 trL� _� 1 Job Page WxTower 88274.002.01- Heritage High School, TX (BU# 876445) 12 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle Si(adalTt FAX: (918) 587-4630 Load Vertical Shear, Shear Overturning Overturning Torque Combination Load PX PY Moment, M Moment, M Py PZ K K K ktP ft .._ kt_P f� K Dead+Wind 330 deg - No Ice 17.262 -7.142 -13.765 -1127.046 594.956 0.519 Dead+Ice+Temp 29.639 0.000 -0.000 -3.430 0.192 -0.000 Dead+Wind 0 deg+Ice+Temp 29.639 -0.003 -1.505 -130.188 0.513 0.009 Dead+Wind 30 deg+Ice+Temp 29.639 0.689 -1.316 -114.058 -58.452 -0.031 Dead+Wind 60 deg+Ice+Temp 29.639 1.216 -0.808 -70.703 -103.109 -0.037 Dead+Wind 90 deg+lce+Temp 29.639 1.410 0.004 -3,101 -119.574 -0,012 Dead+Wind 120 deg+Ice+Temp 29.639 1.233 0.734 58.641 -104.444 0.004 Dead+Wind 150 deg+lce+Temp 29.639 0.722 1.267 103.709 -61.006 0.012 Dead+Wind 180 deg+Ice+Temp 29.639 0.003 1.469 120.874 -0.126 -0.009 Dead+Wind 210 deg+Ice+Temp 29.639 -0.717 1.264 103.390 60.840 -0.028 Dead+Wind 240 deg+Ice+Temp 29.639 -1,230 0,729 58.088 104.512 -0.013 Dead+Wind 270 deg+Ice+Temp 29,639 -1.410 -0.002 -3.740 119.961 0.012 Dead+Wind 300 deg+Ice+Temp 29.639 -1.219 -0.813 -71.256 103.816 0.046 Dead+Wind 330 deg+Ice+Temp 29.639 -0.694 -1.319 -114.377 59.392 0.047 Dead+Wind 0 deg - Service 17.262 -0.019 -7.996 -656.899 2.089 0.106 Dead+Wind 30 deg - Service 17.262 3,611 -7.004 -574.038 -300.507 -0.086 Dead+Wind 60 deg - Seryice 17,262 6.398 -4.349 -352.139 -531.223 -0.090 Dead+Wind 90 deg - Service 17.262 7.426 0.024 2.313 -616.489 0.061 Dead+Wind 120 deg - Service 17.262 6.508 3.880 320.817 -539.584 0.119 Dead+Wind 150 deg - Service 17,262 3.822 6.694 553,130 -316.434 0.104 Dead+Wind 180 deg - Service 17.262 0.019 7.787 642.205 -2.109 -0.105 Dead+Wind 210 deg - Service 17.262 -3.789 6.675 551.035 312.781 -0.287 Dead+Wind 240 deg - Service 17.262 -6.489 3.847 317.184 537.469 -0.224 Dead+Wind 270 deg - Service 17.262 -7.426 -0.014 -1.885 616.468 -0.062 Dead+Wind 300 deg - Service 17.262 -6,417 -4.382 -355.771 533.297 0.195 Dead+Wind 330 deg - Service 17.262 -3.644 -7.023 -576.132 304.120 0.269 I:::_- Solution Summary ___j Sum of Applied Forces Sum of Reactions Load PX PY PZ PX Py PZ % Error Comb. K K K K K K 1 0.000 -17.262 0.000 0,000 17.262 0.000 0.000% 2 -0.037 -17.262 -15.672 0.037 17.262 15.672 0.000% 3 7.078 -17.262 -13.728 -7.078 17,262 13.728 0.000% 4 12.541 -17.262 -8.524 -12.541 17.262 8.524 0.000% 5 14.555 -17.262 0.047 -14.555 17.262 -0.047 0.000% 6 12.755 -17262 7.605 -12.755 17.262 -7.605 0.000% 7 7.490 -17.262 13.121 -7.490 17.262 -13.121 0.000% 8 0,037 -IT262 15.262 -0.037 17.262 -15.262 0.000% 9 -7.426 -17.262 13.084 7.426 17,262 -13.084 0.000% 10 -11718 -17.262 7.541 12,718 17.262 -7.541 0-000% 11 -14.555 -17.262 -0.028 14.555 17.262 0.028 0,000% 12 -12.578 -17262 -8.588 12.578 17.262 8.588 0.000% 13 -7.142 -17.262 -13.765 7,142 17.262 13.765 0.000% 14 0,000 -29.639 0.000 -0,000 29.639 0.000 0.000% 15 -0.003 -29.639 -1.505 0.003 29.639 1.505 0.000% 16 0.689 -29.639 -1,316 -0.689 29.639 1.316 0.000% 17 1216 -29.639 -0,808 -1.216 29.639 0.808 0.000% 18 1.410 -29.639 0.004 -1.410 29.639 -0.004 0.000% 19 1.233 -29.639 0.734 -1.233 29.639 -0.734 0.000% 20 0.722 -29.639 1.267 -0.722 29.639 -1,267 0.00000 21 0.003 -29.639 1.472 -0.003 29.639 -1.469 U10% 22 -0.717 -29.639 1.264 0.717 29.639 -1.264 0.000% 23 -1.230 -29.639 0.729 1.230 29.639 -0.729 0.000% 24 -1.410 -29-639 -0.002 1.410 29.639 0,002 0.000% 25 -1.219 -29.639 -0.813 1.219 29.639 0.813 0.000% 26 -0.694 -29.639 -1.319 0.694 29.639 1.319 0.000% WxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 13 of 16 B+T Group Project Date 1717S.Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Phone: (918) 587-4630 Crown Castle Designed by FAX. (918) 587-4630 skadam Non -Linear Convergence Results . �........ Load .:� . .,. ...� Converged? Sum of Applied Forces Displacement Force Sum of Reactions of Cycles Load PX Py PZ PX Py PZ % Error Comb, K K K K K K 0.00000001 27 -0.019 -17.262 -7.996 0.019 17.262 7.996 0.000% 28 3.611 -17.262 -7.004 -3.611 17.262 7.004 0.000% 29 6.398 -17.262 -4.349 -6.398 17.262 4.349 0.000% 30 7.426 -17.262 0.024 -7.426 17.262 -0.024 0.000% 31 6.508 -17.262 3.880 -6.508 17.262 -3.880 0.000% 32 3.822 -17.262 6.694 -3.822 17.262 -6.694 0.000% 33 0.019 -17.262 7.787 -0.019 17.262 -7.787 0.000% 34 -3.789 -17.262 6.675 3.789 17.262 -6.675 0.000% 35 -6.489 -17.262 3.847 6.489 17.262 -3.847 0.000% 36 -7.426 -17.262 -0.014 7.426 17.262 0.014 0.000% 37 -6.417 -17.262 -4.382 6.417 17.262 4.382 0.000% 38 -3.644 -17.262 -7.023 3.644 17.262 7.023 0.000% Non -Linear Convergence Results . �........ Load .:� . .,. ...� Converged? Number Displacement Force Combination of Cycles Tolerance Tolerance I Yes 4 0.00000001 0.00000001 2 Yes 5 0.00000001 0.00001533 3 Yes 6 0.00000001 0.00008925 4 Yes 6 0.00000001 0.00009428 5 Yes 5 0.00000001 0.00003344 6 Yes 6 0.00000001 0.00009146 7 Yes 6 0.00000001 0.00009117 8 Yes 5 0.00000001 0.00004665 9 Yes 6 0.00000001 0.00008846 10 Yes 6 0.00000001 0.00009158 11 Yes 5 0.00000001 0.00002063 12 Yes 6 0.00000001 0.00009609 13 Yes 6 0.00000001 0.00008835 14 Yes 4 0.00000001 0.00003330 15 Yes 5 0.00000001 0.00012970 16 Yes 5 0.00000001 0.00013630 17 Yes 5 0.00000001 0.00013526 18 Yes 5 0.00000001 0.00012255 19 Yes 5 0.00000001 0.00012920 20 Yes 5 0.00000001 0.00012941 21 Yes 5 0.00000001 0.00012161 22 Yes 5 0.00000001 0.00012760 23 Yes 5 0.00000001 0.00012715 24 Yes 5 0.00000001 0.00012119 25 Yes 5 0.00000001 0.00013482 26 Yes 5 0.00000001 0.00013607 27 Yes 4 0.00000001 0.00065645 28 Yes 5 0.00000001 0.00038678 29 Yes 5 0.00000001 0.00041005 30 Yes 4 0.00000001 0.00062347 31 Yes 5 0.00000001 0.00039264 32 Yes 5 0.00000001 0.00039454 33 Yes 4 0.00000001 0.00067611 34 Yes 5 0.00000001 0.00037495 35 Yes 5 0.00000001 0.00038991 36 Yes 4 0.00000001 0.00061195 37 Yes 5 0.00000001 0.00042272 38 Yes 5 0.00000001 0.00038273 WxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 14 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle FAX.- (918) 587-4630 skadam Critical Deflections and Radius of Curvature - Service Wind Maximum Tower Deflections - Service Wind Elevation Appurtenance Section Elevation Harz. Gov. Tilt Twist No. Load Deflection Load Curvature ft ft in Comb. ° ° Ll 116.75 - 115.25 50.314 27 3.853 0.008 L2 115.25 - 74.5 49.104 27 3.852 0.008 L3 77.1 -36.91 21.649 27 2.717 0.003 L4 40,42-0 5.843 27 1.368 0.001 Critical Deflections and Radius of Curvature - Service Wind Maximum Tower Deflections - Design Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Twist No. Load Deflection Load Curvature ft ft Comb. in ° ° ft 116.750 Lightning Rod 3/4" x 8' 27 50.314 3.853 0.008 4161 116.000 TYDA-252718DER4-65P w/ Mount 27 49.709 3.853 0.008 4161 2 Pipe 0.008 L4 40,42-0 11.426 2 114,000 6'x 2" Mount Pipe 27 48.100 3.848 0.008 4161 104.000 (2) APXI 7DWV-1 7DWV-S w/ 27 40.234 3.699 0.007 2850 0.019 Mount Pipe Mount Pipe 68.080 23" Stadium Light 27 16.654 2.361 0.003 1362 66.830 Stadium Lights Mount 27 16.018 2.313 0.003 1361 65.580 23" Stadium Light 27 15.396 2.266 0.003 1359 34.000 (2) Stadium Lights 27 4.308 1.148 0.001 1576 Critical Deflections and Radius of Curvature - Design Maximum Tower Deflections - Design Wind Section Elevation Harz.� Gov. Tilt Twist No. Deflection Load ft in Comb. Comb. ° L 1 1 16.75 - 115.25 98.180 2 7.520 0.021 L2 115,25 - 74.5 95.824 2 7.518 0.021 L3 77.1 - 36.91 42.308 2 5.310 0.008 L4 40,42-0 11.426 2 2.674 0.002 Critical Deflections and Radius of Curvature - Design Wind Elevation Appurtenance Gov. Deflection Tilt Twist Radius of Load Curvature ft Comb. in ° ° ft 1 16.750 Lightning Rod 3/4" x 8' 2 98.180 7.520 0.021 2199 116.000 TYDA-252718DER4-65P w/ Mount 2 97.001 7.520 0.021 2199 Pipe 114.000 6' x 2" Mount Pipe 2 93.868 2510 0.021 2199 104.000 (2) APXI 7DWV-1 7DWV-S w/ 2 78.545 7.221 0.019 1500 Mount Pipe 68.080 23" Stadium Light 2 32.556 4.615 0.006 706 Job Page tnxTower88274.002.01- Heritage High School, TX (BU# 876445) 15 of 16 B+T Group Project Date 1717 S. Boulder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle FAX: (918) 587-4630 skadam Elevation -" -,- Appurtenance -- - -,--Gov. . �.� , Deflection --w: Tilt Twist �� Radius of Load Elevation Size L L„ Curvature ft Actual Comb. inft No. Ratio No. 66.830 Stadium Lights Mount 2 31.315 4.522 0.005 705 65.580 23" Stadium Light 2 30.100 4.430 0.005 704 34.000 (2) Stadium Lights 2 8.424 2.244 0.002 807 Compression Checks Pole Design Data Data Section Elevation Size L L„ Klir Fa A Actual Allow. Ratio No. Ratio No. Actual Actual M P Po P M, ft Fbv ft ft ksi in' K K Pa Ll 116.75 - 115.25 TP14xl4x0.375 1.500 0.000 0.0 39.000 16.452 -2.112 641.635 0.003 L2 (1} 115.25 - 74.5 (2) TP20.82x14x0.25 40.750 0.000 0.0 39.000 16.209 -6.048 632.134 0.010 L3 74.5 - 36.91 (3) TP28.08x19.8850.344 40.190 0.000 0.0 39.000 29.908 -10.934 1166.430 0.009 L4 36.91-0(4) TP35.01x26.6770.344 40.420 0.000 0.0 39.000 38.371 -17.246 1496.480 0.012 Pole Bending Design Data Section Elevation Size Actual Actual Allow. Ratio Actual Actual Allow. Ratio No. Actual Actual M f x F,- fbr M, Al Fbv f v ft V kip ft ksi ksi _ Fb, kip -ft ksi __. ksi Fb,• L1 116.75 - TP14x140.375 4.703 1.050 39.000 0.027 0.000 0.000 39.000 0.000 115.25 (1) 116.75- TP14xl4x0.375 3.485 0.212 26.000 0.017 0.001 0.000 26.000 L2 115.25 - 74.5 TP20.82xl4x0.25 277.405 41.909 39.000 1.075 0.000 0.000 39.000 0.000 (2) L2 115.25 74.5 TP20.82xl4x0.25 9.256 0.571 26.000 0.045 0.367 L3 74.5 - 36.91 (3) TP28.08x19.8850.344 700.176 42.730 39.000 1.096 0.000 0.000 39.000 0.000 L4 36.91 -0(4) TP35.01 x26.677x0.344 1285.05 47.514 39.000 1.218 0.000 0.000 39.000 0.000 0.034 0.235 0.007 0 0.000 v L4 36.91-0(4) TP35.01 x26.677x0.344 15.690 0.409 Pole Shear Design Data Section Elevation Size Actual Actual Allow. Ratio Actual Actual Allow. Ratio No. V f F f T f, F, f, ft K ksi ksi F kip ft ksi ksi F„ L1 116.75- TP14xl4x0.375 3.485 0.212 26.000 0.017 0.001 0.000 26.000 0.000 115,25(l) L2 115.25 74.5 TP20.82xl4x0.25 9.256 0.571 26.000 0.045 0.367 0.026 26.000 0.001 2) L3 74.5 - 36.91 (3) TP28.08x19.8850.344 13.189 0.441 26.000 0.034 0.235 0.007 26.000 0.000 v L4 36.91-0(4) TP35.01 x26.677x0.344 15.690 0.409 26.000 0.032 0.205 0.004 26.000 0.000 1R Ltj tnxTower Job Page 88274.002.01- Heritage High School, TX (BU# 876445) 16 of 16 B+T Group Project Date 1717 S. Bourder, Suite 300 16:37:32 02/10/14 Tulsa, OK 74119 Client Designed by Phone: (918) 587-4630 Crown Castle FAX: (918) 587-4630 skadam Program Version 6.1.4.1 - 12/17/2013 Section Capacity Pole Interaction Design Data Section Elevation Component P .._,.. Size Critical P SF*P1111 Section Elevation Ratio ..Mm Ratio. , m. R Ratio Ratio Ratio Comb. Allow. Criteria No. LI P f r fey f f, Stress Stress Pass L2 ft Pa Fk Fe„ F„ F�, Ratio Ratio L3 L1 116.75- 0.003 0.027 0.000 0.017 0.000 0.030 1.333 H1-3+VT Pole 115.25(l) 4 -17.246 1994.808 923 Pass L2 115.25 - 74.5 0.010 1.075 0.000 0.045 0.001 1.085 1.333 H1-3+VT (2) Pole (L4) 92.3 Pass L3 74.5 - 36.91 (3) 0.009 1.096 0.000 0.034 0.000 1.105 1.333 Hi-3+VT L4 36,91-0(4) 0.012 1.218 0.000 0.032 0.000 1..23+0 1.333 H1-3+VT Program Version 6.1.4.1 - 12/17/2013 Section Capacity Table Section Elevation Component P .._,.. Size Critical P SF*P1111 � % � Pass No ft Type Element K K Capacity Fail LI 116.75 - 115.25 Pole TP14xl4x0.375 1 -2.112 855.299 2.3 Pass L2 115.25 - 74.5 Pole TP20.82x14xO.25 2 -6.048 842.635' 81.4 Pass L3 74.5-36.91 Pole TP28.08xl9.885x0.344 3 -10.934 1554.851 82.9 Pass L4 36.91 -0 Pole TP35.01 x26.677x0.344 4 -17.246 1994.808 923 Pass Summary Pole (L4) 92.3 Pass RATING = 92-3 Pass Program Version 6.1.4.1 - 12/17/2013 BASE LEVEL DRAWING RESERVED) 1� "0 8" FT 3 5'P T. 31. 80 IT 6 3/4- TO 60 FT (RESERVED) 1 �4 TO 104 (((INSTALLED 9-5 "�B ON 2" ((INSTALLED} 1) 1/2- LNDUIT T BUSINESS UNrr.* 876445 116 FT LEVEL 0 BE REMOVED TO 116 FT TO 116 FT LEVEL 68 Fr LEVEL APPENDIX C ADDITIONAL CALCULATIONS Stiffened or Unstiffened, Ungrouted, TIA Rev F Site Data B U#: 876445 Site Name: Heritage High School, TX App #: 214793 Revision # 6 Pole Manufacturer: 1 Other Anchor Rod Data --._.,....Qty. 8---- ,._..-- ---...._ Diam: _ 2.25'._ ; in Rod Material: A615 -J Strength (Fu): 100 ksi Yield (Fy): 75 ' ksi Bolt Circle: 40.75 lin Plate Data _ - - Diam: Thick: Grade: Single -Rod B-eff: '- 47 in in ksi in ! 3 = 50 13.73 Stiffener Data (Welding at both sides) —._...* Config: Weld Type: Groove Depth: Groove Angle: Fillet H. Weld: Fillet V. Weld: Width: Height: Thick: Notch: Grade: Weld str.: 35.01___ in ** degrees <-- Disregard lin in in in in ksi ksi 0.34375 65 12 80 ' 0 Base Plate Stress Ratio: 35.1% Pass Y.L. Length: ; Pole Data Diam: Thick: Grade: # of Sides: Fu Reinf. Fillet Weld 35.01___ _ in in ksi °o° IF Round ksi °0" if None 0.34375 65 12 80 ' 0 Stress Increase Factor ASIF: 1 1.333 Reactions Moment: Axial: Shear: 1285 ft -kips kips kips 17 16 If No stiffeners, Criteria: I AISC ASD < Only Applcable to Unstiffened Cases Anchor Rod Results Rigid Maximum Rod Tension: 187.1 Kips Service, ASD Allowable Tension: 195.0 Kips Fty*ASIF Anchor Rod Stress Ratio: 96.0% Pass Base Plate Results Flexural Check Rigid Base Plate Stress: 17.6 ksi Service ASD Allowable Plate Stress: 50.0 ksi 0.75*FyASIF Base Plate Stress Ratio: 35.1% Pass Y.L. Length: 20.85 n/a Stiffener Results Horizontal Weld : n/a Vertical Weld: n/a Plate Flex+Shear, fb/Fb+(fv/Fv)12: n/a Plate Tension+Shear, ft/Ft+(fv/Fv)^2: n/a Plate Comp. (AISC Bracket): n/a Pole Results Pole Punching Shear Check: n/a 0 = none, 1 = every bolt, 2 = every 2 bolts, 3 = 2 per bolt *` Note: for complete joint penetration groove welds the groove depth must be exactly 1/2 the stiffener thickness for calculation purposes CClplate 1.5 - Circular Base F 1.2, Effective March 19, 2012 Analysis Date: 2/10/2014 CCI Foundation Tool Suite - Monopole Pier - Beta Release CCI Foundation Tool Suite - v1.0 BU: 876445 Site Name: HERITAGE HIGH SCHOOL, TX App Number: 214793; Rev:l Work Order: 706601 Monopole Drilled Pier Input Criteria Ultimate TIA Revision: F ACI 318 Revision: 2002 Seismic Category: B Forces 3497.26 k -ft Compression 22.1 kips Shear 20.8 kips Moment 1670.5 k -ft Swelling Force 0 kips Foundation Dimensions Cohesion Pier Diameter: 5 ft Ext. above grade: 0.5 ft Depth below grade: 22 ft Material Properties (ft) Number of Rebar: 26 Rebar Size: 10 Tie Size 4 Rebar tensile strength: 60 ksi Concrete Strength: 4000 psi Ultimate Concrete Strain 0.003 in/in Clear Cover to Ties: 3 in Soil Profile: DP Soil 0 Date: V'I�ICROWN CASTLE 3" C.C. Analysis Results Concrete/Steel Check Ultimate Ultimate Ultimate Mu (from soil analysis) 1805.39 k -ft Depth to Zero Shear: 6.75 ft r�Mn 3497.26 k -ft Friction Uplift Skin Comp. Skin Bearing Soil Safety Factor: Thickness From To Unit Weight Cohesion Angle Friction Friction Capacity SPT'N' Layer (ft) (ft) (ft) (pcf) (psf) (deg) (ksf) (ksf) (ksf) Counts 1 5 0 5 125 0 0 0 0 0 2 6 5 11 125 2800 25 0 0 0 3 6 11 17 125 8000 36 4 6 0 4 1 17 18 62.6 8000 36 4 6 0 5 4 18 22 62.6 15000 28 4 6 36 Analysis Results Concrete/Steel Check Soil Lateral Capacity Mu (from soil analysis) 1805.39 k -ft Depth to Zero Shear: 6.75 ft r�Mn 3497.26 k -ft Max Moment, Mu: 1388.76 k -ft RATING: 51.6% Soil Safety Factor: 15.02 Safety Factor Req'd: 2 RATING: 13.3% rho provided 1.17 rho required 0.33 OK Soil Axial Capacity Skin Friction (k): 518.36 kips Rebar Spacing 4.98 End Bearing (k): 353.43 kips Spacing required 20.32 OK Comp. Capacity (k), cl�Cn: 871.79 kips Comp. (k), Cu: 22.10 kips RATING: 2.5% Dev. Length required 15.01 Dev. Length provided 48.19 OK (1 \L `Y Overall Foundation Rating: "s , t� Page 1 of 1