HomeMy WebLinkAboutItem 09 - Engineering ServicesMEMO TO:
FROM:
MEETING DATE
SUBJECT:
RECOMMENDATION:
ITE
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
BRUNO RUMBELOW, CITY MANAGER
FEBRUARY 20, 2007
ENGINEERING SERVICES CONTRACT AMENDMENT # 2 — BS
114L
City Council consider approving Amendment #2 to the Engineering Services Contract
with Nathan D. Maier Consulting Engineers for the design of the BS 114L
Reconstruction Project in an amount not to exceed $26,220.00, authorize staff to
execute said amendment, and take any necessary action.
FUNDING SOURCE:
Funds are available as follows:
Funding Source
Account Amount
Award
Percent
Developer
178-21579 $156,370.59
$26,220.00
100%
Participation
TOTAL
$156,370.59
$26,220.00
100%
Budget
Amount
Award
Percent
Engineering
$ 26,220.00
$26,220.00
16.8%
Construction
$130,150.59
83.2%
TOTAL
$156,370.59
$26,220.00
100%
BACKGROUND:
The proposed contract amendment #2, in the amount of $26,220.00, is for the design of
a deceleration lane into the Grapevine Station Addition located south of the Wall Street
intersection, and the widening of the Wall Street intersection from the current two-lane
cross section to an improved section with left and right turn lanes.
Both the deceleration lane and the pavement widening will be incorporated into the
TxDOT construction contract for Texan Trail at no cost to the City of Grapevine.
The cost of the design and construction of these improvements will be 100% funded by
the Grapevine Station developer.
Staff recommends approval.
February 15, 2007 (2:43PM)
Ac
* l gr' y y"s�-sir
yp. w Y
-
IP
�:.
p_
r v
�• n
� l
'..444
a a
rC.usr ;
r r `r
rST,h
44
�' f f. a �' �\ t".��„ �i �•' < ''�`i. � "�}'{elf.
IbL
h
(.' '.� ,� +�..' 1 �°: flu. �•.
sf z >*
WALL STREET AT
TEXAN TRAIL