HomeMy WebLinkAboutItem 09 - Engineering ServicesMEMO TO: FROM: MEETING DATE SUBJECT: RECOMMENDATION: ITE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BRUNO RUMBELOW, CITY MANAGER FEBRUARY 20, 2007 ENGINEERING SERVICES CONTRACT AMENDMENT # 2 — BS 114L City Council consider approving Amendment #2 to the Engineering Services Contract with Nathan D. Maier Consulting Engineers for the design of the BS 114L Reconstruction Project in an amount not to exceed $26,220.00, authorize staff to execute said amendment, and take any necessary action. FUNDING SOURCE: Funds are available as follows: Funding Source Account Amount Award Percent Developer 178-21579 $156,370.59 $26,220.00 100% Participation TOTAL $156,370.59 $26,220.00 100% Budget Amount Award Percent Engineering $ 26,220.00 $26,220.00 16.8% Construction $130,150.59 83.2% TOTAL $156,370.59 $26,220.00 100% BACKGROUND: The proposed contract amendment #2, in the amount of $26,220.00, is for the design of a deceleration lane into the Grapevine Station Addition located south of the Wall Street intersection, and the widening of the Wall Street intersection from the current two-lane cross section to an improved section with left and right turn lanes. Both the deceleration lane and the pavement widening will be incorporated into the TxDOT construction contract for Texan Trail at no cost to the City of Grapevine. The cost of the design and construction of these improvements will be 100% funded by the Grapevine Station developer. Staff recommends approval. February 15, 2007 (2:43PM) Ac * l gr' y y"s�-sir yp. w Y - IP �:. p_ r v �• n � l '..444 a a rC.usr ; r r `r rST,h 44 �' f f. a �' �\ t".��„ �i �•' < ''�`i. � "�}'{elf. IbL h (.' '.� ,� +�..' 1 �°: flu. �•. sf z >* WALL STREET AT TEXAN TRAIL