HomeMy WebLinkAboutItem 11- Concrete Batch PlantITEM # /1 MEMO TO: HONORALBE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: APRIL 3, 2007 SUBJECT: BATCH PLANT — GLADE ROAD IMPROVEMENTS RECOMMENDATION: Staff recommends Council approve a request to locate a temporary concrete batch plant at 300 Glade Road and legally described as Tract 1, Abstract 1083, Green Minter Survey, and take any necessary action. BACKGROUND INFORMATION: The applicant JLB Contracting, LP, is requesting a temporary concrete batch plant for the construction of Glade Road to operate from June 1, 2007 through August 1, 2007. The applicant is requesting to operate the batch plant Monday through Friday 7:00 a.m. to 7:00 p.m. and Saturdays 9:00 a.m. to 5:00 p.m. The Public Works Director has reviewed the application and supports the proposed location. O:\Susan\Batch Plants\glade road.doc 141 13! 121 11I 509 607 505 ! 503 501 sos�I0 `504 sob { 009 tf Ji LAIR MEADOW DR { 4701 505 4703 '' , a J a J , J TR 2B� J a J J'? J J TR 264 — z ,7a fav a`�a°a aJ° }Ja aJJ 506 11 sob r 4705� 3Y Cm J a ? a J J J JJ J J J JJ a J 4 (n Lx707 5098706aR-T�Ha J a ?J ? J al 7 y s 47091 r-9 a�io � `4 611—frn 506 '471 47-1 11 „ 2 7 'm, J J J J 3 J a a e— �Jrn JJ Ja J, .3 J aJ , aJ 3 J —F—R-T. S r-4801 509b07 I sos 12 13 71 4 26o3 a J v J a J J J a s 510 f 508 17 i6 -15 3 4805 8�] . . . . . . . . ._ ,< 4607 J J J a Ja J J J J a y �' ------ 509 507 I - - - 1 8 7 6 5 505 ,l1 4609 j 516 j 51 20 22 1I23 24 26 26 1�3 1 508 1 5045 i —T_ r I—�— 1 ...... . 521 518 1513 509 505 501 t9 20 .I 2t { 22 I 5221 _<< CN ... 524 too - - TR Z44B asos t000 •' 4 4909- - ----- -- SkXAG O�OR05 N.�R A Go153g8 1 1R1 11 Z 14 9 10 1s QPM' 336 A' W 6 CREPE MYRTLE DR 5 t8 19 20 21 22 23 24 Uj Z GLADE SHADOW DR 29 21 22 23 24 25 26 17 �4 ,nn TR 263 V' ti a'0 y �v N W6' PCD 4801 s 1� NSG `f''r•-a TR18 N 0*0 1 200 SCD s 200 TR 1C TR 1cl 200 C A 11 12 13 14 15 16 . 1 2 3 4 5 6� 6 7 8 9 10 7 10 CREPE MYRTLE DR 2 9 17 21 3 1 18 1 L Q 26 00 8 17 2 0 18 2 25 28 LL 5 7 C/) 2f G //�v 16 3 ll / 15 3 X74 U 24 29 O 6 5 W 75 4 m 4 O 23 30 W 7 gQ 4 = 44 F 5 z 13 E 5 22 Ui 31 �ynJg CL 3 O �y. 13 5 tic42 8Ol' , A< \,+ Z 21 O 32 33 W 9 z (j) V' ( 11 Q oV 11 11 8 IGA 10 8 = p 34 10 i Q 19 35 0 11 B 10 g 9 N GOLDENRAIN TREE DR 16 6 17 36 2 3 1 inch equals 300 feet 162 200 TR 1A1A y 12 „ 0 Z 9 O� 2 R ,A2 8 t44/ 3 4 Q A 6 U s 9 10 5 OR, 1 7 8 3 Glade Road Batch Plant 7 INE T E, ACITY OF GRAPEVINE TEMPORARY USE PERMIT APPLICATION 1. Applicant Name �_ 3 ` Address f'. - 'T f" Z 3, Fe, ^ .��. r�'f '7- 7� 2 Phone no.(L6t j) fax no.�`G (9il� Liv vi5 Cci� 2. Property owner Name C . 1D- S4 «� ,; Address ��� Q�� S r1 , C� f (,K9 e 1,P Imo . -7 b Phone no. fax no. 3. Address of temporary use � C �t �e Rc� 4. Total number of off-street or highway parking space 5. Description of temporary use t- , r �-f r—L-9--/-;- `5 t rZ�' f--;j�; ,42- /C'_1 V, -__re 6. Date or dates of proposed use to I z- , 7 7. Time and hours of temporary use 8. Please submit a detailed diagram of the proposed temporary use, site/plot plan or a plat showing the proposed temporary use drawn to scale and dimensioned with other drawings as desired or as requested by staff. 9. In the case of concrete mixing or batching plants for use during the construction of buildings or public improvements for thirty (30) days or less may be approved by the Director of Development Services. Concrete mixing or batching plants for use more than thirty (30) days shall require approval by City Council. CITY OF GRAPEVINE, DEVELOPMENT SERVICES, P 0 BOX 95104, GRAPEVINE, TEXAS 76099 (817)410-3154 FAX (817)410-36 (property owner) hereby authorize Ji -3 c eR c- 7-1,-e 1 4-,c� (applicant) to request a temporary use on property I own at Owner (print) -/`� P, : AL ( Owner signature The State of j County of 7; QR—k 7 - (address)." Pb Before Before me Z i,v OA ,1?W14 ivy on this day personally appeared E)) - -5,4 LLEC known to me (or proved to me on the oath of or through (description of identity card or other document) to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that 'he executed the same for the purposes and consideration therein expressed. Given under my hand and seal of office this cZ ( 6rday of , a.d. ,2t o 7 seal ---4�16tafy signature Eflia CLAW SOF FOR OFFICIAL USE ONLY CITY MANAGER RISK MANAGER DEVELOPMENT SERVICES DIR FIRE POLICE -,TY OF GRAPEVINE, DEVELOPMENT SERVICES, P 0 BOX 95104, GRAPEVINE, TEXAS 76099 (817)410-3154 FAX (817)410-3018 Susan Batte - Land Use Permit - Concrete Batch Plant - Glade Road Page 1 From: "Sam Davis" <sdavis@jlbcontracting.com> To: <sbatte@grapevinetexas.gov> Date: 3/6/2007 7:49:40 AM Subject: Land Use Permit - Concrete Batch Plant - Glade Road Susan, Per our conversation last week, as you mentioned, the dates given to the TCEQ for utilizing the concrete batch plant on the Glade Road project need to be revised. Our current schedule shows paving around the beginning of June, and completing the concrete work around the end of July. The original schedule, and the letter sent to the TCEQ on August 27, 2006 had the paving complete by the middle of June. The city has already granted us a 30 day extension due to some unforeseen conflicts, and we are currently negotiating an additional time extension due to the inclement weather we have encountered over the last few months. I will be notifying TCEQ of these changes when we get closer to the move. If you need any additional information, or have any questions or concerns, please feel free to give me a call. Thanks. Sam Davis JLB Contracting, LP 325 Trinity Court P. O. Box 24131 Fort Worth, Texas 76124 ph: (817) 261-2991 fax:(817) 261-3044 No virus found in this outgoing message. Checked by AVG Free Edition. Version: 7.1.413 / Virus Database: 268.18.7/711 - Release Date: 3/5/2007 CC: "'Curtis Bergthold"' <Curtisb@ci.grapevine.tx.us> JLB CONTRACTING, LP 1007 HARRISON AVENUE, ARLINGTON, TEXAS 76011 METRO (8I7) 261-2991 FAX (817) 261-3044 August 27, 2006 Texas Commission on Environmental Quality Regional Office — Region 4 — Dallas / Fort Worth 2301 Gravel Drive Fort Worth, Texas 76118 Re: Temporary Concrete Bach Plant Site and Process Glade Road Roadway Improvements — SH 121 to SH 360 — Grapevine, Texas Owner /Operator —JLB Contracting, LP, Plant A — Serial Number 820713 TCEQ Account # 913902S / Customer # CN601617038 / Regulated Entity # RN102752169 Previous (Latest) Standard Permit # 525141_010 Dear Sirs,- Please irs; Please find this letter as notification of our intent to move the above referenced portable concrete batch plant to a new location — adjacent to the Glade Road roadway improvements project located in Grapevine, Texas. The proposed plant site is on property owned by Mr. E. D. Sallee of Krugerville, Texas (see attached lease agreement), and is contiguous to the project approximately 500' east of the Euless Main Street and Glade Road intersection; Latitude 32°53'02.88" N, Longitude 9704'32.18" W. We are planning on moving the plant to the Glade Road project around the beginning of December, weather permitting. The plant may be moved off site in between paving phases of the project, depending on the project completion schedule. We are currently projecting all paving to be completed by the middle of June, 2007. For this plant site, the proposed hours of operation will be Monday — Friday 7:00 am to 7:00 pm, and Saturday 9:00 am to 5:00 pm. Please find the attached references plots and maps showing the location of the project, and the proposed plant site. Enclosed is a completed Table 20, and Concrete Batch Plant Standard Permit Checklist. If you have any questions or concerns, please feel free to contact me at (817) 261-2991. Thank you for your time and consideration in this matter. Sincerely, /=------ <Z:21 Sam Davis ® Texas Commission on Environmental Quality Texas Commission on Environmental Quality Table 20 TCEQ Concrete Batch Plants The followring Table is designed to help you confirm that you meet the requirements of Title 30 Texas Administrative Code Chapter 116. Tables, checklists and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmental Quality, Air Permits Division Web site at www.trmrec.state.tx.us/permitting/airpemi. Please Complete the Following 1. Company name: JLB Contracting, LP 2. Plant ID or name: Plant A - Serial Number 820713 3. Type of plant (Check One): El Permanent IZI Portable Specialty Mix 4. Type of batching that will be accomplished (Check One):7 Wet (Rotary Mix Trucks) Dry Central Mix 5. Maximum production rates: 125 yd3/h 100,000 yd'/year 6. Maximum operations: 12 hours/day 6 days/week 52 weeks/year 3700 hour/year 7. Does the facility operate at night? ❑ YES ✓RINO 8. Is a completed Table 11 "Fabric Filters," submitted with this application for each fabric filter? ❑ YES ❑NO 9. Silo information: A. How- many silos will this plant have? 1 B. What is the volume of each silo? 1200 ft' ft3 ft' C. Explain the method of loading silo(s): Pneumatic Unloading D. Is each silo equipped with overload warning device? © YES❑NO E. What type of abatement device will be used on silo vent(s)? Baghouse 10. How will the batch drop to truck or central mixer be controlled to prevent dust emissions? (Check One) © A. Suction shroud o ith exhaust air to central fabric filter. (If checked, attach a completed Table 11, `Fabric Filters. ') B. Flexible discharge spout with water fog ring. (If checked, attach design drawing) C. Other type of abatement device. (If checked, explain in detail and attach design drawing) 11. What is the distance from the water fog ring or central bag house stack to the nearest property line? > 100 Feet 12. How will the cement weigh hopper be vented? (Check one) A. Cement Flyash Silo Fabric Filter (If checked, attach a completed Table 11, `Fabric Filters.') ©B. Central Fabric Filter (If checked, attach a completed Table 11, Fabric Filters. ') C. Discharge Spout D. Other (Please indicate): TCEQ-10188 [Revised (06-15-03)] Table 20- Concrete Batch Plants - This form for use by facilities subject to air quality permit requirements and may be revised periodically [NSRG:6926.v5) Page 1 of, Texas Commission on Environmental Quality Table 20 Concrete Batch Plants TCEO (Page 2) 13. Will the sand and aggregate be washed prior to delivery at your facility? El YES [:]NO 14. What is the munber of acres or square feet which will be covered by aggregate stockpiles? 1 Acres or Square Feet 15. Water sprays will be used at the following locations: ® Stockpiles 11 Aggregate Bin Outlets E]Conveyor Transfer Points ❑ Screens 16. How will plant roads be treated to prevent dust emissions? DChemical Sprayed Paved (asphalt or concrete) and cleaned ® Water Sprinkled Gravel Paved and Vacuumed 17. Is there a generator or engine on site? n YES ❑ NO Note: If "YES, "complete Section 17-A through G and submit a completed Table 29 entitled, `Reciprocating Engines. " A. Make and Model: CAT 3340 DIT E. Annual Hours of Operation: Intermittent B. Maximum Rated Horse Power: 200 F. Distance to Nearest Property Line: > 100 Feet C. Fuel Type: Diesel G. NO., Rating (Specify in Units): D. Percentage of Sulfur Content: LowI7 Sulfur Diesel / A fNTUR-.KLT.41T C -t; Zl NOT SJa•-�1 TCEQ-10188 (Revised (06-15-03)1 'able 20- Concrete Batch Plants - This form for use by facilities subject to air quality permit requirements .id may be revised periodically [NSRG:6926.v51 Page 2 of 2 Texas Commission on Environmental Quality Table 11 TCEG Fabric Filters Tables, checklists, and guidance documents pertaining to air quality permits are available from the Texas Commission on Environmenta Quality (TCEQ) Air Permits Division (APD) Web site at www.tnrcc.state.tx us/nermiffinn/aimerm 1. Emission Point Number and name (from Process Flow Diagram): Filter Baghouse 2. Manufacturer and model number .(if available): VHC 963 3. Name of source(s) or equipment being controlled: Plant A 4. Type of particulate controlled: Cement, Sand, Aggregate dust 5. GAS STREAM CHARACTERISTICS Design Maximum Flow Rate (acfm) Average Expected Flow Rate (acfm) Gas Stream Temperature (°F) Particulate Grain Loading (grain/scf) 5000 4800 Ambient Inlet: 5 Outlet: .01 Pressure Drop (inches of H2O) Water Vapor Content of Effluent Stream (lb water/lb dry air) Fan Requirements 3.14 hp: 10 ftp /min: 5000 6. PARTICULATE DISTRIBUTION (By Weight) Micron Range Inlet (Percentage) Outlet (Percentage) 0.0-0.5 0.5-L0 1.0-5.0- 99% 99% 5-10 10-20 over 20 7. FILTER CHARACTERISTICS Filtering Velocity (acfm/ft2 of Cloth) Bag Diameter (inches) Bag Length (feet) Total Number of Bags 3 : 1 8" 5'9" 80 8. Bag rows will be: Staggered OStraight 9. Will walkways be provided between banks of bags?: YES ✓ao 10. Filtering material: Siliconized - All Filament Dacron / Polyester 11. Describe bag cleaning method and cycle.: High Frequency Air Vibrator 12. Capital installed cost $ $2,600.00 Annual o eratin cost $ $350.00 Note: Attach the details regarding the principle of operation and an assembly drawing (front and top view) of the abatement device drawn to scale clearly showing the design, size and shape. If the device has bypasses, safety valves, etc., include in the drawing and specify when such bypasses are to be used and under what conditions. TCEQ - 10179 [Revised 07-01-03] Table 11 - This form for use by facilities subject to air quality permit requirements and maybe revised periodically. (NSRG:7510 v3) Air Quality Standard Permit for Concrete Batch Plants Registration Checklist The following checklist has been developed so the Texas Commission on Environmental Quality (TCEQ), Air Permits Division (APD) can confirm the concrete batch plant (CEP) meets the standard permit requirements. Please read all questions and check "YES", "NO or `N/A " (equivalent to True, False, or Not Applicab le), or give specif c information for the facility. If the CBP does not meet all conditions ofthisstandardpermit, it willnotbe allowed to operate under the standardpermit and mustapplyfora case-by-caseprecortstructionpermit as required under Title 30 Texas Administrative Code § 116.111 (30 TAC § 116.111). COMPANY:Jt-3 ,-;- LOCATION: �c�4ti� p 0.�9 �1 P�_ T `> 1 '1—i5, REGISTRATION NO.:&/,2Z7sztb9 ACCOUNT ID NO.:_913 - ?<, - 5 COMPLETED BY: 54_ 1(>4�,t5 (check one) • "speciality-- complete (1)-(4) • "temporary" -complete (1)-(3) and (S) • "permanent"- complete (1)-(3) and (6) Condition IYES I NI I Description Number A (1)(A) Registration Form PI -I S-CBP, Table 20, and supporting information attached/mailed to TCEQ, ✓ including air emission estimates, control devices and methods, process description, plot plan and area map „✓ Copies of all information mailed to Air Permits Division, regional office and applicable local programs (1)(B) $900 fee sent to TCEQ Cashier (If ' IA the answer to (Z) must be "YES (1)(C) Construction and/or operation has begun on the facility (1)(D) `� Registration submitted to TCEQ after September 1, 2000 (1)(E) Air dispersion modeling has been submitted as a part of this registration (1)(� ✓' Records will be maintained on-site to show hourly production and kept for 24 months or duration of operation at this site (2) Temporary facility located contiguous in or adjacent to the right-of-way of a public works project or related project segments (if "YES ", public notice is not required) (3)(A) All cement/flyash storage silos and weigh hoppers are vented to a fabric or cartridge filter system (3)(B)(i) Fabric/cartridge filter systems and suction shroud will be operated properly with no tears or leaks (3)(B)(ii) Al) filter systems are designed to meet at least 0.01gr/ds cf outlet (3)(B)(In) T All filter systems and mixer/truck loading control devices will meet visible emissions performance standards (3)(B)(iv) Cement and/or flyash silo filter exhausts are equipped with sufficient illumination to observe visible emissions performance if filled during non -daylight hours (3)(Q(t) Conveying systems to and from the silos are totally enclosed and maintained with no tears or leaks (3)(C)(ii) Except during cement/flyash tanker connect and disconnect, conveying systems to and from the storage silos will meet visible emissions performance standards TCEQ-10377 (Rev. 11-14-00) ^hecklist for Registering Concrete Batch Plants - These forms are for use by sources subject to le New Source Review Program and may be revised. (ANSRG95A/7294-v2) Page 1 of 4 I ConditionI YES I NO ( N/ Description I Number A (3)(D) (3)(E)(i) (3)(E)(ii) (3)(E)(iii) (3)(E)Civ) (3)(F (3)(G A warning device will be installed on each bulk storage silo to alert operators in sufficient time so that the loading operation can be stopped prior to over -filling and potential failure of filtei systems All in -plant roads will be covered with a material such as roofing shingles or tire chips All traffic areas will be covered with a material such as roofing shingles or tire chips All in -plant roads will be treated with dust -suppressant chemicals All traffic areas will be treated with dust -suppressant chemicals All in -plant roads will be watered All traffic areas will be watered All in -plant roads will be paved with a cohesive hard surface that is maintained intact and cleaned All traffic areas will bepaved with a cohesive hard surface that is maintained intact and cleaned Dust emissions from all stockpiles will be minimized at all times by sprinkling with water, dust - suppressant chemicals, or covers All material spills immediately cleaned up and contained or dampened so dust emissions are minimized i / (4) SPECIALTY PLANTS (4)(A) Site production shall not exceed 30 cubic yards per hour (4)(B) The cement/flyash weigh hopper is vented to a fabric or cartridge filter system The cement/flyash weigh hopper is vented inside the batch mixer (4)(C)(i) Dust emissions at the mixer feed are controlled by a spray device which eliminates visible emissions (4)(C)(ii) Dust emissions at the mixer feed are controlled by a pickup device delivering air to a filter (4)(C)(iii) Dust emissions at the mixer feed are controlled by an enclosed batch mixer feed so that no visible emissions occur (4)(17)(w) Dustemissions at the mixer feed are controlled by conducting the entire mixing operation inside the enclosed process building such that no visible emissions from the building occur during mixing activities (4)(D) Vehicles used for the operation of the CBP will not be operated within 25 feet of any property line, except for entrance and exit to the site Roads and other traffic areas are bordered by dust -preventive fencing or other barrier along all traffic routes or work areas within the 25 -foot specified buffer area and these borders will be constructed to a height of at least 12 feet (details on the attached plot plan) TCEQ-10377 (Rev. 11-14-00) Checklist for Registering Concrete Batch Plants - These forms are for use by sources subject to the New Source Review Program and may be revised. IANSRG95A/7294-v21 Page 2 of k I ConditionI YES I NO I N/ Description Number A (5) (5)(A) (5)(B)(i) (5)(B)(ii) (5)(C)(i) (5)(C)(h) (5)(C)(1h)(b) (5)(Q(jvXa) (5)(C)(i`)(b) TEMPORARY PLANTS This plant is considered temporary and will occupy the designated site for less than 180 consecutive days or will supply concrete for a single project, but not other unrelated projects Site production shall not exceed 300 cubic yards per hour The facility will occupy the site for less than 180 consecutive days Site production shall not exceed 200 cubic yards per hour The facility will load rotary mix trucks through a discharge spout equipped with a water fog ring having low-velocity fog nozzles spaced to create a continuous fog curtain that minimizes dust emissions The water fog ring will meet the specified visible emissions performance standards The facility will use a suction shroud and fabric filter/cartridge filter system The suction shroud or other pickup device shall be installed at the batch drop point/mixer feed The suction shroud shall be vented to a fabric or cartridge filter system with a minimum of 4,000 acfm The shroud baghouse exhaust or truck mix point is located at least 100 feet from any property line* The facility is equipped with a water fog ring and the mix truck load point is a minimum of 300 Feet from the nearest off -property non -industrial receptor Fhe CBP production rate is equal to or less than 200 cyh AND all stationary equipment, stockpiles, ortraffic areas used for the operation of the CBP (except forincidental traffic and the ;ntrance and exit to the site) is not located or operated, respectively, within 25 feet from any )roperty line* "he CBP production rate is greater than 200 cyh and equal to or less than 300 cyh, AND all tationary equipment, stockpiles, and traffic areas used for the operation of the CBP (except for acidental traffic and the entrance and exit to the site) is not located or operated, respectively, lithin 50 feet from any property line* .oads and other traffic areas are bordered by dustpreventive fencing or other barrier along all aflic routes or work areas within the 25 -foot specified buffer area and these borders will be onstructed to a height of at least 12 feet (details on the attached plot plan) tockpiles within this buffer distance must be contained within a three -walled bunker which Mends at least two feet above the top of the stockpile (details on the attached plot plan) TCEQ-10377 (Rev. 11-14-00) _hecklist for Registering Concrete Batch Plants - These forms are for use by sources subject to e New Source Review Program and may be revised. [ANSRG95A/7294-v21 Page 3 of 4 Condition YES I NO N/ J Description 'Number ! A I (6) PERMANENT PLANTS (6)(A) Site production shall not exceed 300 cubic yards per hour (6)(B) The suction shroud or other pickup device shall be installed at the batch drop point/mixer' feed The suction shroud or device shall be vented to a fabric or cartridge filter system with a minimum of 4,000 acfm (6)(C) All entry and exit roads and main traffic routes associated with the operation of the CBP (including batch truck and material delivery truck roads) shall be paved with a cohesive hard surface that can be maintained intact and shall be cleaned All batch trucks and material delivery trucks shall remain on paved surface when entering, conducting primary function, and leaving the property Other traffic areas comply with the control requirements of paragraph (3)(E) (6)(D)(i) The suction shroud baghouse exhaust or truck mix point is located at least 100 feet from any property line (6)(D)(ii)(a) The CBP production rate is equal to or less than 200 cyh AND all stationary equipment, stockpiles, or traffic areas used forthe operation ofthe CBP (except for incidental traffic and the entrance and exit to the site) is not located or operated, respectively, within 25 feet from any property line (6)(D)(H)(b) The CBP production rate is greater than 200 cyh and equal to or less than 300 cyh, AND all stationary equipment, stockpiles, and traffic areas used for the operation of the CBP (except for incidental traffic and the entrance and exit to the site) is not located or operated, respectively, within 50 feet from any property line (6)(D)(iii)(a) Roads and other traffic areas are bordered by dust -preventive fencing or other barrier along all traffic routes or work areas within the specified buffer area and these borders will be constructed to a height of at least 12 feet (details on the attached plot plan) (6)(d)(W)(b) Stockpiles within this buffer distance must be contained within a three -walled bunker which extends at least two feet above the top of the stockpile (details on the attached plot plan) * For CBPs which supply concrete fora single public works project, the "property line "measurementsforpurposes ofcompliance with this standard permit and 30 TAC § 111.1 SS shall be made to the outer boundaries of the designated public property, roadway project and associated rights -of --way. TCEQ-10377 (Rev. 11-14-00) Checklist for Registering Concrete Batch Plants - These forms are for use by sources subject to the New Source Review Program and may be revised. [ANSRG95A/7294-v2J Page 4 of ifications side eteve-tion sped Thc Vince Hagan Corapany offers tI)e highest quality products ands4irvices available. Our sales and engineering staff will guide. YOU through the plajinill,g Stages to em;ure you, Company 6 purchasing the right equipment for the joL 521(- _s officeaChicano, acid Atlanta. We :5 are lc�cated in Dallas, have., company service porsonnef Who travel directly to your job site and our repla.cemerri, Part" ale availabte on 3 264 hOUr basis. Our goal Is.to provide (he bell: ervire bdure Md afteT the sale. A SUCCe'555ft1l. project begins vdth The Vince Hagan Compare y. haganatiar fully mobite concrete batching plantIN MINE r . ...... 'k ..... ...... ......... ........ . . ............ ....... .... . . ............ . ...... .. .. ... ......... . .. .... . . . ......... .. . . ....... Irl T,z , F Av TT: ­ w, x4l T I 4j f qlv W, J1 p KIT 1j, fill ;k d'-;,AZM 11C.1c" ) (;; r7T_ L.. _J . . .... . ............ . . . . ......... ..... ..... . ...... . ..... ­­ ......... .. . ...... . . JLB CONTRACTING, LP P. O. Boa 24131, Fort Worth, Texas 76124 METRO(817)261-2991 FAX(817)261-3044 June 7.2006 Mr. E. D. Sallee 309 Janice Lane Krugerville, Texas 76227 Dear Mr. Sallee: Please find the following terms for the rental agreement on your property located on Glade Road, approximately 500' east of Euless Main in Grapevine, Texas: Property Details - Legal Description - Minter, Green W Survey -A 1083 TR 1 - TAD MAP 2126 440 (see attached tax map & description) For the purposes of erecting and using a project office Oob trailer - 52'x 12), JLB Contracting, LP shall lease approximately'/ Acre at a rate of $500.00 / month. This lease shall be in effect starting June 1, 2006, and last approximately 18 month, until the completion of the project and the site is restored to it's current condition. Payment shall be made on or around the 1 st of each month, no later than the 5�' of the month. The initial payment shall be made upon the receipt of the signed copy of this letter. Forthe purposes of erecting and using a portable concrete batch plant, JLB Contracting, LP shall lease approximately 1 3/. Acre at a rate of $1000.00 / month. This lease shall go into effect immediately upon the arrival of JLB Contracting, LP's portable concrete batch plant on site (currently scheduled for November 1 '), and shall remain in effect until the removal of the concrete batch plant, and restoration of it's associated area to current conditions. Please note that these two lease agreements shall be in effect concurrently upon the arrival of the concrete batch plant, for a total lease payment of $1500.00 while both are in effect_ In addition to the lease payments described above, JLB Contracting, LP shall put up a $1000.00 deposit, to be included with the initial % Acre lease payment, as a bond forthe restoration of the property. Upon final acceptance of the clean-up by the owner, the $1000.00 deposit shall be returned to JLB Contracting, LP. JLB Contracting, LP shall furnish an insurance certificate in excess of $1,000,000 for any liabilities and claims arising from our use of the property. Sincerely, Accepted By: Jamey G. Humphrey President JLB Contracting, LP Date: June 6, 2006 (Signature) _'� .") . _ \I 2-P'- (Printed Name) Date�)v,Y-,Q Na, �tl 0 (—UN IIIVUtU.UN MAP 27 SCALE IN MILES r -- _ SCALE IN FEET ''. CONTINUED ON MAP 55. . COPYRIGHT 2005 by MAPSCO, INC. - ALL RIGHTS RESERVED 0 1000 2000 3000 BOOK PAGE 1041 47, SECURD FF TERRACE` " Parr Park' sZ1 Dallas - ate\ Worth ai /nierna r0nafy4/11 brt PARR Lmo. -- �7 c�,S. WESTPORT PKWY ..: w r,NGS'✓v D0 ¢ rlc`d! qP0 --^ 'TN NJESTF ` t✓,AJESi C RES I o MooiAND s �E r rr f , I \ 360 �.,\\\ HIILS�_ ,' .., .- LL CRESi!I E �O ✓ =o , S ,A ORDi C ASEpak Ri6ge FIELD °:MEADD1v ':: UNIPFF-rqr J T/ S., .sopEQIP LEXINGTON � tilru- '- - POi T"� WIISHIRE Z, Parkes 1 G '+temonal I a :;. S`TFFDRD Ar mI -. Eq 0400 "=o 'Bear Creek ��\ \\. f \ 'Park w cr>Fv inl GEyo r, orksture :' ✓leadows Paris .;:sraF C* " 9ALL JC (HNSON Cemetery - St �HgRTFDAD t W _ rHALL f �HA�VEN� M I�, �y O'7t`!SO 21 ff i � az1' Z adow cR �.� a o���l-SHADY KEW S P.! SABEL o RiDG �o CRE Y, o :. LL' EW SI :"' ¢ 41GH OA S¢ CPE IJP I� o � VJINOSY✓EL52 c o w�0o o ¢ FOX RUN HUGHES g Gracemner' 20 BRANCHo BR OK I "' =HI G .cl' Crossin Park \ END- HAY®EN - HOLC -_ zol O; OLIJNCRIDGE.L na ecl WE GLEN erne i FOX ge .; .MEAD , g c ,q.( NBEND -'ark Hentage1 ,I CIS,WODD "'w10 N11GTD�TI o : ¢OAK " �` W GTONIo '<z WDODNIL. 0 LLco ;CT MEAD01 -•� - �y >C � ; � f CRAM v,GN,cozl�'.,BRI Cfl0 GA.iEWAY E . 1U VILA r1j. - h GLADE RD h .9� -T GRR>NS FO hado .. : JI �, 17 z�g ioep�OAK (i „gLTACRESTE : Z ...: �H � o ¢ FLOWER og _.�..�' V'NTAY. tA." tAS UpAOAO CO SWOLD�� �- � I d NC t O iCT o a ARGDNE o CT c r ES 1 -- a o 0 _ - a I "GLpp MEL CT pL o = x ¢ E� oaE �¢CHANIJING _ �. �' ;o .0 LDENtuoJ iA GK �, I U4+UoUS P136 Z� - (sN'S PL yy IpUB� L1 v ',+'. '^ BOR U a m 1 HIC ORYIr NE SP NG ¢ N MEGo .'iG;'a gGTD i - C S '- � p Yr='-'_. Y= Gc' Mapsco, Inc. a CAfJTE46 -F BRffTAM' o` `°; R 'p z y G, -9 JyFDSEM4RY T P �r o NGFq �p'O 4 r1L. s a' -b Z CENT JKNOTi 4� = }y CA = �' �\� r" - BLVp U9iG-Ci��`� SWEET �M11 wNr SAGE -MOSS HI' w STOV - - PRI i4 K LAK C/y ?SE 3`-" WE tC NA 0 MORRIS 2 j r 3 BALSAM , to etv l �. wood > °r crW � arN 4 � � SON LARK � CAT pq e ec p ' m BEAR CRE Kx nv. rs �3 COUAY z N 2 T EM AUpllNv w 3 MODSE u ORA U all (ON m '-�{- SA 0.. ansl .1RE Nouow DB44L, N Ni 0 Bear Creek a HOLUDAY r 1 W= aD c 5 BLVD 1 o CECIL 4 Abbe Q MACK .. ` < _,..._34 'da I <J ,�< C'�eck 'J,Snctuster Bo Eden Lr[LIc S' 3 -` IN Trailwood - c��� McCormick, _ CHEEK-SPARGEP,- -" :Park -° Park u+ cm Ma r n < "G F M 0 o-- O 157 .. \`.NDOD �P aF, FOUNTAJNVI ooEVv' The Preserve at g 6� p' z CRIPP� tJVv'S Bear:Creek � 121 "� � p,N; � � ✓Ah oz a' 3DAA ,�/M - OVE A'r wTfRA-FOUM.4JN SIDE ry� �,Ecl,� = r:p�.rr,wrig NAS ¢� RIDGE SHA_ P� NLS= 5 PAIiC TAAIL Y, REg TZE WATERSIDEF�Cj E Priv teJ ASF WAY C '� """" � � � �VJ�ODDALF o URN W000 z / ;-a/�' I B� d,, Q o"� o KN L WO = A3iF b� 0 0 �s� o SCIR 3 1 J80ROUGHa�i'i TEAL W00 v �WILD L k 00 -.:. DOD CIEs AK a MILLCUMMIN r W g a N00 SUM EA HILL �S m ROS ASH WO REEK ASH E x o og ar JANANN sZ j W 3 V Tatl Txn6ers SINGER CT .,, WALN FF WAY 000 `^ w ' ¢ z 7 BROVvNSTOf > 3 1 ,� ¢ }a o TT 9 ESRAIL o HEIMA,5¢ SHEL AP, o MJlfa r O 5 WOODHAVBo S wcF RIO AI ERVWt m = 0 !_,i CT SCALE IN MILES r -- _ SCALE IN FEET ''. CONTINUED ON MAP 55. . COPYRIGHT 2005 by MAPSCO, INC. - ALL RIGHTS RESERVED 0 1000 2000 3000 BOOK PAGE 1041 47, CONSTRUCTION PLAN -S FOR GLADE ROAD ROADWAY IMPROVEMENTS TARRANT COUNTY, TEXAS G E' RA EV E & BRA DEN AVENUE. SUITE 600 TEXAS 76102 IM -Com CITY OF GRAPEVINE Department of Public Works 200 South Main Street Grapevine, Texas 76051 (81 7 ) 410-313 5 VICINITY MAP N.T.S. 3Z rvQ1� � vOi Zai I 0 U U O N-2:21 - z ¢� z I• o ry t� F c c U E \ 'N[1 Mtltl'WODV31'1� J m I _ � J U - m c JW Z - A v =Q o� P OLVO - O -. n 1- Z� O¢ o I 1� 39QIbBYfVJ 3 U f _ ---�--moi I.1 1•I U z -aa war3n Ofr O U I Ilk. NI \\\\\\ NI 1IM3'dSVIJ YN:1 3W19 t isI W JK I F a cl v Z0 $` ¢ v c> I J JC I 1 CW I _ ro U U Oi - � O _ _ 1 n Z 'Ob 3NIA3erotl`.rSP_lR3 0 o �o IN w I i9 NIVry N N ry N N a o u s o Z 3 C� WD Z JK N-2:21 - z ¢� os ri o ry W c c U E \ 'N[1 Mtltl'WODV31'1� J m I _ � J LNAWAGNE m c JW Z - A v =Q o� P OLVO - J JC I 1 CW I _ ro U U Oi - � O _ _ 1 n Z 'Ob 3NIA3erotl`.rSP_lR3 0 o �o IN w I i9 NIVry N N ry N N a o u s o Z W J N-2:21 - z ¢� - w - o ry W c c �o a c c c o' s_ w a / - ¢ 0 U _z z ¢ w - I I f l l! I 1 1 1 U D - - tOv- o- -T7- .11 dDInIN n- 0 0 o -�4 00 00 o c x