Loading...
HomeMy WebLinkAboutItem 07 - Remodeling ServicesRemodeling services at the Convention Center C&M Electrical RWA Flooring Solutins Artistic Painting Company Binswanger Glass Company Russell Anderson Construction On the electrical bid, two of the vendors (C & M Electrical and Humphrey and Associates) made calculation errors in their line item pricing and one vendor (Humphrey and Associates) added a line item that was not requested in the bid. After consulting with each vendor it was determined that the line item errors did not effect the total pricing offered. The City Attorney determined that the total pricing offered should be considered as the final offer. On the bathroom remodeling bid, the lowest bid received was from Integrity Home Repair & Construction. This bid included an addendum that changed the pricing schedule of the bid and issued a new pricing page for the bid. Integrity failed to include the new addendum and pricing page and therefore, the pricing page used had incorrect pricing that could not be compared. In addition, Russell Anderson Construction is a local Grapevine vendor and their total bid was within the 5% allowable by the State under Local Government Code 271.9051 to award a contract to a local contractor if that contractor's offer is within 5% of the lowest bid. Artistic Painting Company was the only contractor to submit a bid for the paint and vinyl and was one of the original consulting companies on the project and therefore very familiar with the work to be completed. Binswanger Glass Company was the only bid received on the doors and windows project and again was one of the companies consulted in the planning stages of the project and therefore is familiar with the project requirements. References were checked on all recommended vendors with satisfactory results. Based on the bids received, Staff recommends award of contracts for each project as follows: Bid 282-2007 Electrical. Recommend award be made to the low bid of C & M Electrical in the total amount of $36,101.00 Bid 283-2007 Flooring. Recommend award be made to the low bid of RWA Solutions in the total amount of $101,414.05 Bid 284-2007 Paint and Vinyl. Recommend award be made to the low bid of Artistic Painting Company in the total amount of $42,812.00 Bid 285-2007 Doors and Windows. Recommend award be made to the low bid of Binswanger Glass Company in the total amount of $12,885.09 Bid 286-2007 Bathroom Remodeling. Recommend award be made to the lowest bid meeting bid specifications and requirements of Russell Anderson Construction in the total amount of $47,743.00 April 12, 2007 (9:57AM) The Facilities Committee has reviewed the proposed changes and staff requests approval to award all projects recommended above in the total amount of $240,995.14. ME April 12, 2007 (10:20AM) SCHEDULE A — SUMMARY OF ALL BIDS RECEIVED FOR CONVENTION CENTER REMODEL PROJECT Total Bid Recommended Award Bid 282-2007 C & M Electrical* $ 36,101.00 $ 36,101.00 Humphrey & Associates* $ 36,416.00 Integrity Home Repair & Construction $ 37,080.00 Bid 283-2007 RWA Flooring Solutions $101,414.05 $101,414.05 Integrity Home Repair & Construction $149,754.00 Bid 284-2007 Artistic Painting $ 42,812.00 $ 42,812.00 Bid 285-2007 Binswanger Glass Company $ 12,885.09 $ 12,885.09 Bid 286-2007 Integrity Home Repair & Construction** $ 47,640.00 Russell Anderson Construction*** $ 47,743.00 $ 47,743.00 Total of Recommended Award ..................... $240,995.14 *Each vendor had errors in their line item pricing. Bid totals are correct. ** Did not include new pricing schedule as issued under addendum number 1 ***Vendor is local and within 5% allowable for an award April 12, 2007 (10:21 AM)