Loading...
HomeMy WebLinkAboutItem 04 - SH 360 & SH 121 Ramp DesignI n FROM: BRUNO RUMBELOW, CITY MANAGER 131 - c - MEETING DATE: MARCH 17, 2015 SUBJECT: PRESENTATION — STATE HIGHWAY 360 AND STATE HIGHWY 121 RAMP DESIGN AND CONSTRUCTION INFORMATION Brian Barth with TxDOT and Kristen Stieg with NorthGate Constructors will be present to provide Council with an update on the design and construction of the State Highway 360/121 ramps. As you recall, this project is being built as a reliever to the lone ramp south of Stone -Myers Parkway that was left at the conclusion of the Connector project. 3/11/2015 (1:14:37 PM)