Loading...
HomeMy WebLinkAboutItem 23 - Highway Safety Improvement ProgramMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: JULY 20, 2021 SUBJECT: APPROVAL OF AN ENGINEERING DESIGN SERVICES CONTRACT FOR THE 2020 HIGHWAY SAFETY IMPROVEMENTS PROGRAM (HSIP) PROJECTS AND APPROPRIATION ORDINANCE RECOMMENDATION: ity Council to consider approval of a contract for traffic engineering services for the design of the 2020 Highway Safety Improvement Program (HSIP) Projects with Kimley-Horn and Associates, Inc. and approval of an ordinance appropriating the funds. FUNDING SOURCE: Funds are available in the Capital Projects Streets Fund 178 in an estimated amount of $150,000. BACKGROUND: The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on public roads. State funding is provided for construction and operational improvements both on and off the state highway system. Under this program, TxDOT will provide 100% of the construction funding for "On System" projects and 90% of the construction funding for "Off System" projects. Local agencies are responsible for 100% of the design and construction overrun costs. n September, 2020, staff submitted five total projects (three intersection improvements, one wrong way driving, and one corridor improvement) in response to the 2020 TxDOT HSIP call for projects. On May 12, 2021, TxDOT notified staff that all 5 of the projects had been selected for funding in the amount of $594,743. The three intersection improvement projects will take place at the intersections of: 1) Park Boulevard and Shenandoah Avenue 2) Roberts Road and Hall Johnson 3) Timberline and Mustang Drive The wrong way driving detection project will be located at the southbound ramp of State Highway 121 adjacent to the intersection of State Highway 26 and Grapevine Mills Trail. The raised median and detection corridor improvement project will take place along William D. Tate Avenue between State Highway 114 and Mustang Drive. Kimley-Horn & Associates Engineering was selected based on project experience and their current work in developing the Grapevine grant applications for this project call. The project will be designed and constructed in accordance with TxDOT standards and environmental regulations. The proposed fee for this effort is $150,000. Staff finds this fee to be fair and reasonable given the nature of the project. Staff expects to seek Council action on the construction agreement with TxDOT in the Spring of 2022 for TxDOT's letting to start in August of 2022. Staff recommends approval. ORDINANCE NO. 2021-028 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING THE APPROPRIATION OF $150,000.00 IN THE CAPITAL PROJECTS STREETS FUND; DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City have Grapevine has been awarded funding through the Highway Safety Improvements Program (HSIP); and WHEREAS, the City Council of the City of Grapevine desires to design five HSIP projects; and WHEREAS, funding is available in the Capital Projects Streets Fund; and WHEREAS, all constitutional and statutory prerequisites for the approval of this ordinance have been met, including but not limited to the Open Meetings Act and Chapter 211 of the Local Government Code; and WHEREAS, the City Council deems the adoption of this ordinance to be in the best interests of the health, safety, and welfare of the public. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated hereinabove are found to be true and correct and are incorporated herein by reference as if copied in their entirety. Section 2. That the City Council hereby authorizes $150,000.00 be appropriated from the Capital Projects Streets Fund for the design of five HSIP projects. Section 3. That the terms and provisions of this ordinance shall be deemed to be severable, and that if the validity of any section, subsection, word, sentence or phrase shall be held to be invalid, it shall not affect the remaining part of this ordinance. Section 4. That the fact that the present ordinances and regulations of the City of Grapevine, Texas, are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety and general welfare of the public which requires that this ordinance shall become effective from and after the date of its final passage, and it is accordingly so ordained. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 20th day of July, 2021. APPROVED: William D. Tate Mayor ATTEST: Tara Brooks City Secretary APPROVED AS TO FORM: Matthew C.G. Boyle City Attorney Ordinance No. 2021-028 2 Twin Coves Park Grapevine Lake 1 IHorseshoe -.- -- Trails Park I Highland-V z L- - �. - 00 .�.ii Rd J- - i i ms Southlake ��E-S. a e Hishw , outhlake Blvd Old Union Murrell Park _ Highrfin?Park r C ti =vine L.ak R 1 1 Oak Grove Park ^ } ti II ., i�a�r�no 1 N�� �I d iceI. v, ar ° ■ ^� N.anov..Or ' X-' 14 Express 10'- \\ 1 ■I -J �I Q\ 1 Parr Park ` • it ♦flit ��� - 4 _ , W CL " u 9BC'or ♦..`f O♦.♦♦.♦.♦. �+� .� i Q� : t y 1f%4 _ /, , I I -Ma-1 -'ohr sonRd1 � r� �� ♦♦ / S � r''{.. s' �O j : , � I 1 I ,5�:�/�er f%A9:'Y1 t •'tbv�e+(� i% zdT ' i CRESTRIDG E CT T. ♦S�f prl���� ��*t1�C�=.�tl��t �'�� V1tiN�F -i 00Rp . Z DFW Airport +. HALL JOHNSON 10 co I It HILLVIEW DR �r�esCBlvd I C Intersection Improvements Design "HST _° Wrong Way Detection (WWD) System Design L w 0 — ar Or � She,,.oar � — t � N d � � IIms"iii-svit, . TTraffic Safety Improvement Projects J t 5 GellC WCW� z z 0 r ° 1 " = 3, 500' � N Feet 00 0 3,500 7,000 ti