Loading...
HomeMy WebLinkAboutSFRA2020-4115 (2)** r� DATE OF ISSUANCE: P��][I��- NOV 1 i 2020 PERMIT BUILDING PERMIT APPLICATION (PLEASE PRINT LEGIBLY — COMPLETE ENTIRE FORM) JOB ADDRESS: 813 Heatherwood Dr SUITE # LOT: 20 BLOCK: N SUBDIVISION: The Woods Addition (GPV) BUILDING CONTRACTOR (company name): Structured Foundation Repairs Inc. CURRENT MAILING ADDRESS: 13301 Trinity Blvd. #133 CITY/STATE/ZIP: Euless, TX 76040 PH: # 972-484-1200 Fax # 972-484-1215 PROPERTY OWNER: Peggy Johnson CURRENT MAILING ADDRESS: 813 Heatherwood Dr CITY/STATE/ZIP: Grapevine, TX 76051 PHONE NUMBER: 6825538564 PROJECT VALUE: $ 8900.00 FIRE SPRINKLERED? YES NO X WHAT TRADES WILL BE NEEDED? (Check ones that apply) ELECTRIC PLUMBING MECHANICAL DESCRIPTION OF WORK TO BE DONE: install 8 concrete pilings to stabilize foundation USE OF BUILDING OR STRUCTURE: Residence NAME OF BUSINESS: Total Square Footage under roof: 1620 Square Footage of alteration/addition: ❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings, alterations and additions) ❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review. Control Number: (Not required for 1 & 2 family dwellings) ❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas Department of Health. (REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS) I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). PRINT NAME: Patricia Palos SIGNATURE PHONE #: 972-484-1200 EMAIL: Q CHECK BOX IF PREFERRED TO BE CONTACTED BY E-MAIL THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Type: V Lei Permit Valuation: $ Setbacks Approval to Issue Occupancy Group: jZ-3 Fire Sprinkler: YES NO %(__ Front: Electrical Division: _ Building Depth: Left: Plumbing Zoning: P,-7, S Building Width: Rear: Mechanical Occupancy Load: Right: Plan Review Approval: Date: Il ��.3`x Building Permit Fee: , o� Site Plan Approval: 1��� �� Date: Plan Review Fee: Fire Department: Date: Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Department: Date: Water Availability Rate: _Health Approved for Permit: Date: Total Fees: '.7o Lot Drainage Submitted: Approved: Total Amount Due: , oo P.O. BOX 95104, GRAPEVINE, TX 76099 (817) 410-3165 O:FORMSIOSPERMITAPPLICATIONS 1/02-Rev.11/04,5/06,2107,11109,4111 BUILDING --- RESIDENTIAL ALTERATION Issue Date: November 24, 2020 tU'R 1 I PROJECT DESCRIPTION: Foundation Repair; Install (8) new pilings and adjust (18) existing pilings. y PROJECT # (817) 410-3010 NWW.mygov.us Inspections Permits City of Grapevine LOCATION LEGAL P.O. Box 95104 Grapevine, TX 76099 813 Heather Wood Dr. The (Gpv)Woods Addition Blk N Lot 20 Grapevine, TX 76051 (817) 410-3165 Voice (817)410-3012 Fax CONTRACTOR INFORMATION Structured Foundation Repairs, Inc. * CONSTRUCTION TYPE VB 13301 Trinity Blvd. #133 * OCCUPANCY GROUP R-3 Euless, TX 76040 * ZONING DISTRICT R-7.5 (972) 484-1200 Phone **APPLICANT NAME Patricia Palos (972) 484-1215 Fax '*APPLICANT PHONE NUMBER 972 484-1200 County Tarrant OWNER Fire Sprinkler System? NO Peggy Johnson Square Footage 1620 813 Heatherwood Dr VALUATION 8900 Grapevine, TX 76051 FEES TOTAL = $ 150.00 AVAILABLE INSPECTIONS Building Final (required) Building Permit Fee, ($150.00 Flat Fee) Simple Alteration $ 150.00 PAYMENTS TOTAL = $150.00 Structured Foundation Repairs, Inc. (Thomas Kidd) Check on 1112412020 ($150.00) Note: CK317018 NOTICES 1) ALL work must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE. 2) A copy of the signed permit and approved plans must be on site at all times. 3) The project address must be clearly posted at the job site. READ AND SIGN I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). MYGOV.US City of Grapevine I BUILDING — RESIDENTIAL ALTERATION I SFRA-20-4115 I Printed 11/24/20 at 3:46 p.m. Page 1 of 3 Provide Signed and Sealed ALL CHANGES REQUIRE letter from Registered APPROVAL r I.�En Ineer confirming site Admii A. Gr er F REMSE[�1'PLANS CRO`�_SSTrowkand approval-w3) 702-3398 1 Dallas/F(.Worih ( 751-7691 pier installation when HALL BE work is . com leteKEPT ON JOBSITE ATALL TIMES P CONTRACTOR SHALL CALL FOR Date: November 3, 2020 INSPECTIONS: (817) 410-3010 Attention: Ernest Johnson (via REGISTRATION Subject: Standard Initial Foundation Repair Evaluation �� WILL BE REVOKED UPON Slab Foundation PERMIT EXPIRATION, 813 Heatherwood Dr., Grapevine, TX Crosstown Engineering (CE) was retained to inspect the subject foundation and to provide an opinion regarding the performance of the foundation. This report provides our reasonable professional opinion of the condition of the foundation on the date of our inspection and does not take into consideration any changes in the condition of the foundation or soils after that date. The contents of this report supersede any verbal comments made regarding the structure before, during or after the inspection and this report was prepared for exclusive use of the person or persons this report was prepared for and we do not have any obligation or contractual relationship to any other party other than the party this report was prepared for. Observations for compliance with any code or specification other than those explicitly stated are not included. Scone of Work: The subject foundation was visually inspected and a floor elevations survey was performed in areas that were accessible at the time of the inspection. The opinions provided within this report are based on the experience and judgment of the inspector and the information provided at the time of the inspection. This report also gives engineering advice with regard to the best and most economical repair method assuming normally expected subsurface conditions and conventional construction methods. It is known to all educated engineers with knowledge of the active soil supporting the structure that a full repair plan would include the underpinning of the entire structure and is not economically feasible due to the cost vs. benefit and the risk of resulting damages. Scone of Work Limitations: This report is for informational purposes only and is not intended to provide a detailed inventory of defects or a technical evaluation of the structure, drainage system or the overall property. The inspection excludes plumbing tests or procedures, verification of previous foundation repairs, framed superstn Tr F s, privacy or retaining walls, general site drainage away from the structure, mat SEDrfiOR/(MSrT49tCT40Nof concrete reinforcement or knowledge of the location of interior grade beams, boxed structural members not in plain sight or previous repair work. SHEET: OF: RELEASE DOES NOT AUTHORIZE ANY WORK IN The client or individual ordering this report agree that CroQQNF*IQh#hTdiAH9 IWs¢WI61®ffQ7CN1NQ11 NANCE. the subsurface conditions without extensive geotechnical investigation including on -site drilling or testing of samples. CITY APPROVED PLANS TO BE KEPT ON The future performance of this foundation cannot be predicted due toy' IOBuSf•LbekMLILof Lns&ector. Therefore, this report does not predict or warrant the future performance o1 the subtect Iounoation anti the reader is encouraged to read the entire report. DATE: 1 I/a 0 BY: BUILDING INSPECTION DI O RELEASE DOES NOT APPLY TO CONSTRUCTION IN �-0- L �� EASEMENTS OR PUBLIC RIGHT-OF-WAY. NOV 17 209I1 ALL CHANGES MUST BE APPROVED 1 of 9 — Date:11/3/2020 OFFICE COPY t3 e- ai4N e-(- WbCd 0"C-, P CROSSTOWN Document Review: Ak&trn A. Green, P.E. (FL & 'TX), MBA Tampa: (813) 702-3398 1 Dallas/Fl. Worth (169) 7,51-7691. Documents were provided for review. Documents that provide original structural design drawings, design conditions, or "as -built" drawings or slab elevations at the time of construction were not available at the time of the inspection. Therefore, knowledge of interior grade beam locations or other foundation information is unknown. If existing piers are shown in the limited repair plan, their locations were provided by the client and are approximated. We do not certify their performance or existence. If the reader would like to determine if they are present, they must contact the owner or contractor to obtain an engineering certificate for them. General Observations: For the purposes of this report directions will be described using the terms left, right, front, and back with the front referring to the side of the structure indicated on the limited repair plan. The structure is one story tall with a slab -on -grade foundation. The primary structural system of the structure is a wood framed system with exterior brick veneer and interior drywall with various finishes. The foundation was not exposed during our inspection and was covered with various floor -covering types. Guttering. Foundation Watering Grading, and Vegetation Observations. - The terrain immediately surrounding the structure was visually observed during the inspection. We observed the following: The gutter system is inadequate and needs improvement. The drainage system is adequate. The terrain is landscaped with grass, several trees, and some shrubbery. Some trees and/or shrubs are close to the foundation. Floor Elevation Discussion: A relative elevation floor survey was performed using a Ziplevel Pro-2000B to map the surface topography of the floor of the living area and garage (if present). The floor plans and the elevations are illustrated on the limited repair plan. The elevations were adjusted based on the flooring type encountered to i s �'ViNee base point floor type. If a garage was present, the garage ceiling was meas . D6 ke foundation. Garage floors are designed to slope and are not as eff Visual Observations: SHEET: OF: RELEASE DOES NOT AUTHORIZE ANY WORK IN Brick cracks, patched drywall cracks and ceiling cracks were o�servec 'Bases on ourrlobservationsRot"the structure, ORDNANCE. the structure's physical damage, and review of the elevation m�j.�l rg ON movement over the life of the structure resulting in differentiate rr DATE: BY: BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT-OF-WAY. ALL CHANGES MUST BE APPROVED 2 of 9 —Date: 11/3/2020 CROSSTOWN Foundation Repair Recommendations: Ad;u-n A. Green, P.E. (FL & 'EX), AIBA Tampa: (813) 702 -3398 1 Dallas/Fl. Worlh (169) 751-769 I. We recommend performing the following in the approximate locations of the structure as indicated on the limited repair plan: • Installing 8 total breakouts pilings. • Excavating below beams and attempting to lower 18 existing pilings. • Obtaining a current plumbing leak test. • Installing a fully functioning gutter system. The purpose of the piling installation is to support the failed areas and improve elevations in areas of differential settlement if possible. Please see the limited repair plan for more information. Maintenance Opportunities: We recommend pre -lift and post -lift plumbing tests be performed on the sewer and potable plumbing lines. The results of the tests should be immediately provided to our office. Maintaining a fully functioning gutter system will minimize ponding, soil loss and erosion, and will help control seasonal movement near the foundation. The gutter system should direct storm -water discharge away from the foundation through downspouts to a well -drained area that is graded away from the foundation. Optimally, we recommend the gutter system discharge via in -ground solid pipe to a low-lying area far away from the foundation. Vegetation maintenance and a foundation and yard -watering program will also help control seasonal movement. Maintaining consistent moisture levels in supporting soils at all times of the year is necessary. It is important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the structure to prevent erosion and an exposed or improperly embedded foundation. Large to medium-sized trees, and even large or numerous shrubs, growing too close to a foundation can dramatically effect the moisture content of the soils within the zone of influence beneath the structure. Root systems extract large quantities of water from underlying soils and result in large volumetric changes in the soils (shrinkage). As the tree absorbs water from the soil and the soil volume decreases, the foundation will settle in unsupported. If problematic roots are observed, we recommend removal or installation of tree root barriers. Grading of the soils around the foundation is a critical element to your foun ,s a= e soils away from the home and preventing water from ponding near the founda ' g is noticed near the foundation during the rainy season, consult with _ Over -saturated soils can cause "heave" or settlement and contribtHt�„oundation movement. OF: Expectations of the Limited Foundation Rc imirs: RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. The proposed limited repair plan is intended to provide a M . i��g,lt�i�ipv ,l b p£pr�n� foundation and is not intended to level the foundation. Ti } "� correction needed based on the reaction of the structure during the liftTkRFdJQRr%M&&u L TIMS'tional stress. DATE: BY: Because the structure has endured foundation movement and framin d � N �i> f1i IV tion and perceptible floor slope or some leaning door frames/windows Adt�e�Q�iii Td�Rni sT�n��ri�t cT lt'eT EASEMENTS R PU IC RIGHT-OF-WAY. may remain following the foundation repairs. ALL CHANGES MUST BE APPROVED 3 of 9 — Date: 11/3/2020 �- Adam A. Green, P.E. (FL &_ TX), NIBA CROSSTOWN T; inpa: (S 13) 702 -3398 1Dallas/TI. C'orlh (1-69) 751-7691 The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture content fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface due to seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking may be needed. Underpins (a.k.a. Pilings or Piers) are constructed of steel or concrete and cost and performance will vary. Generally speaking, the deeper a piling is installed, the better it will perform. Shallow installations may be acceptable if they are terminated into rock. This information is meant to serve as a guideline and the owner must decide a reasonable cost/benefit on the property. Piling design is best done with data from a site -specific soils investigation. Such an investigation was not provided and is not a part of this scope of work but we strongly recommend obtaining this data. If this data is not provided, our pier design is only intended to be a minimum standard based solely upon average soil conditions in the general location of the property and as such, may not necessarily provide maximum performance. CITY OF GRAPEVINE RELEASED FOR CONSTRUCTION SHEET:. OF: RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES DATE: _ _ BY: _ BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT-OF-WAY. ALL CHANGES MUST BE APPROVED 4 of 9 —Date: 11/3/2020 ROSSTOWN Disclaimer and Disclosure: Adam A. Green, P.E. (FL & TX), MBA Tampa: (S 13) 702 -3398 1 Dallas/h. Worlh ( [69) 731-7691, The fees collected are for this report and inspection only and do not include additional services. Additional engineering services such as construction compliance inspections or post -repair inspections are available at an additional cost. A request for a construction compliance inspection must be made in a timely manner before commencement of repair work. Otherwise, we accept no responsibility for the proper execution of the repairs. Crosstown Engineering will only perform the post -repair inspection if the proper paperwork is provided at the time of the request. The paperwork should include the type of piling installed, the piling installation depth, the final pressure and the final scope of work. If the scope of work is to be altered by the contractor, we must be notified prior to installation. It is known to educated professional engineers that the soils in this area are subject to movement due to expansion, contraction or densification of the soils, etc. This soil movement could possibly cause the foundation to move after the remediation plan has been implemented and may impact the stability of the foundation and cause damage. We do not warrant the future performance of the subject foundation and the reader is urged to review this entire report. The limit of liability is limited to the fee paid for this opinion. No further agreement shall be made, altered, or varied except by written instrument. Diligent foundation care to maintain consistent soil conditions along the perimeter should reduce further problems after the recommendations within this report have been implemented. However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of further damage. Neither Crosstown Engineering, its sub -contractors, nor Adam Green, P.E., are responsible for liability to the owner or others for acts or omissions of the contractor to carry out the repairs in accordance with their agreement or for the construction means, methods, techniques, sequences, procedures or the safety precautions incident thereto. The contractor is solely responsible for the warranty of the work performed in accordance with their agreement. Please see the pier specifications (if provided) and limited repair plan for more information. Sincerely, of rLc��s'�� Crosstown Land Development Services Texas Engineering Firm (F-15944) AA"GREE �........N . i....'4°......._.......I ........ Cr o Adam Green, P.E., MBA 116597 I Professional Engineer (TX #116597) 13/20 SHEET: OF: _ RELEASE DOES NOT AUTHORIZE ANY WORK IN CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON THE JOB SITE AT ALL TIMES DATE: BY: BUILDING INSPECTION DIVISION: RELEASE DOES NOT APPLY TO CONSTRUCTION IN ASEMENTS OR PUBLIC RIGHT-OF-WAY. 5 of s —Date: 11/3/CHANGES MUST BE APPROVED PRESSED PILING SPECIFICATIONS SIDE VIEW I I I I e' z w O f w FRONT VIEW — EXISTING STRUCTURE I I I 1 I I ! I I FOUNDATION STEEL SHIMS — CONCRETE CYLINDERS CONCRETE , . '' a .• CAP 71. i TENSILE STRENGTH PROVIDED BY TWO COLUMNS OF #3 OR #4 SCHEDULE 60 REBAR EPDXY OR GROUT IN PLACE. REBAR SHALL ` PREVENT LATERAL DISCONNECT BETWEEN CYLINDERS. 12", 18" OR 24" SECTIONS MAY BE USED. 12"LENGTH 6" DIAMETER AND/OR 8" LENGTH 4" DIAMETER PILE SECTIONS CITY OF WPEII# OF rF fi q ,' RELEA ECVFOR .CO : -R 1`I0 .................'.................::....,. SHEET: '��ADAMA.GREEN RELEASE DOES NOT AUTHO CONFLICT WITH T�E �LJIAF4gQDE NANE. 813 HEATHERWOOD DR., GRAPEVINE, TX CROSSTOWN CITY APPReVED - - ..'� TO CSC KEPT 0" CR0S911EP#WG TBPE FIARIff;15944 - WWW. tL71JG—'�IPI- RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS (Do PUBLIC RIGHT-OF-WAY. ALL CHANGES MUST BE APPROVED FRONT VIEW SIDE VIEW VOID— 77 AFTER �•;�,• ti.:.:.,='t<<'=- �' LIFT 'r *• ..' .• .«• •� •"e;.«.`;;,;:• .. ;.r;,•�: STEEL SHIMS SOIL--' `"•• ;'• :•-•••�•�r� .... - `' CONCRETE CYLINDERS----- • ........; „-.. :t Y. • •a .w •• ' ::� •••'�'•'� h•��` •r —CONCRETE OR STEEL CAP -- "•"'� t'�'''''' •"•� STEEL CAP SHEET �---' :«•�i. ` � �.�_,;; d --2-7i8" OUTER STEEL PIPE-- VI .;.::* ;'�•;�•� _�: r%.,; —; s . 2-313" INNER STEEL PIPE • �« a♦ V t+ r.:=� •..:�v s fit.: %.+ .. tip.. ...: fit. a••,.. t = �g v� �, � :�P..............:.9s }�,� ,•• ,••, '�, ter• � � � ................... t..101 ti. •r•► R ,:�f•• �..:w�;} ! to o. 1165 J Q co .� 0 LL w • O w m w tr a w m J J . 2 co w a — a Lu C:QNSTR TION '.: «:.::: `'.� "":::':; _;�•,.''.:.• 11103120 DF: ` t''� "'� •••"; c��►►x+A►C� `r_c nu)T AUTHORIZE ANY WORK IN 813 HE E�(W b8OTH Bfff BUII C��t R Z NG ORDINANCE. CITY APPROVED PLANS TO BE KEPT ON CROSSTOWTBPE•.F1p,F-15944 - WWW. 11•-76^Q ",�--�K�T AF1EEu BUILDING INSPECTION DIVISION: RELEASE DOES IVV I APFLi 1 O IrVNSTI ^CUC IVIV Iii STEEL PRESSED PILIN�(q- 'T HT -OF -WAY. tJI E APPROVED PIER SPECIFICATIONS I I I FOUNDATION BEAM CONCRETE BLOCK 3 #4 BARS BENTAS SHOWN EXTENDING 1 z FEET INTO SHAFT WITH 2 #4 CROSS BARS TIED ACROSS TOP GRADE ■ 6-INCH #3 STIRRUPS @ 24" OC 4 #4 REBAR J Q D W W rL' O 2 F a _ = w OF ..................... ADAM A. GREEN / .....,................... 116597 CITY OF GRAPEVINE 11/03/20 'o llllQj o...... `?�r I RELEASED FO&CONSTRUGRONSCALE SHEET: OF: Pier depth may be less than specified if refusal occurs or if rock it encountered at a shallower depth. WON DOES NOT AUTHORIZE ANY WORK IN have a maximum vertical deviation of 8 degrees. All piers shall be poured the same day they arg I THE BUILDING CODE OR ZONING ORDINANCE. pier shafts shall be clean and free of mud, debris, water, or any foreign material. All concrete aggregate developing a minimum 28-day compressive strength of at least 3000 psi and will be placed at a maximum slump of five (5) inches. The reinforcing steel, conforming toASTMA-615, Grade 40, shall extencytq�.>;u a OZOVED PLANS TO BE KEPT ON shaft and shall be firmly secured in place, free of contact with the sides of the hole. After the pie9 +e d cured for a minimum of seven (7) days, the foundation shall be leveled to the extent practicable by raisirr� a JOB SITE AT ALL TIMES simultaneously at multiple locations with jacks and supported on the piers by cast -in -place columns or solid cvtS - _ — blocks and steel shims. C:ROSSTOWI� 813 HEATHFA)T�7D DR., GRAPEVTff,, TX BUILDING INSPECTION DIVISION: CRO6'-- S I I11M 1�=N6 TBPE FI _ ,10NA�( (469) 751-7694 - DALLAS METROPLEX CONSTRUCTION NOTE: -IF INTERIOR PILING LOCATIONS ARE SHOWN ON THIS MAP THEY ARE APPROXIMATED AND ARE LOCATED WITHOUT KNOWLEDGE OF THE LOCATIONS OF THE INTERIOR GRADE BEAMS. THE CONTRACTOR SHALL MAKE FIELD JUDGEMENTS BASED OFF OF THEIR GRADE BEAM INVESTIGATIONS AND OBSERVED SLAB QUALITIES TO FIELD LOCATE THE FINAL INTERIOR PIER LOCATIONS. FINAL SCOPE CHANGES SHALL BE APPROVED BY THE ENGINEER OF RECORD. EXCAVATE BELOW BEAMS o- AND ATTEMPT TO LOWER EXISTING PILINGS WOOD DECK I I I I I 4.4 4.1 2.7 0.4 2.4 2.3 vr 1.2 1.6 PLEASE NOTE: IF EXISTING PILINGS ARE SHOWN ON THIS MAP, THEIR LOCATION WAS PROVIDED BY THE CLIENT AND IS APPROXIMATE. CE DOES NOT CERTIFY THEIR PERFORMANCE OR EXISTENCE. IF THE READER WOULD LIKE TO DETERMINE IF THEY ARE ACTUALLY PRESENT, THEY j MUST CONTACTTHE OWNER OR CONTRACTOR TO OBTAIN I AN ENGINEERING CERTIFICATE FOR THEM. I i I I_ J 2' 1.3 0.8 -0.5 -0.9 -0.8 -0.8 Q -1.4 -1.0 1.1 • U -0.2 -0.3 0.6rr��yy 0.8 7 �J 1.1 i 1.0 1.1 0.8 0.9 1.3 1.8 1.3 GARAGE 00 -1.2 • -1.0 -1.0 r: 0.2 -0.2 A/C 0.4 0.8 0.3 X lC 1 ---EXCAVATE UNDER BEAMS AND ATTEMPT TO LOWER EXISTING 4.2 PILINGS [ FRONT • INSTALL 8 TOTAL BREAKOUT PILINGS. • EXCAVATE BELOW BEAMS AND ATTEMPT TO LOWER 18 EXISTING PILINGS. • OBTAIN A CURRENT PLUMBING LEAK TEST. • INSTALL A FULLY FUNCTIONING GUTTER SYSTEM. f,!TY OF GRAPEVINE VINE & _ LIMITED REPAIR PLAN *NOT TO SCALE - ALL LOCATIKft R C U `' `-rE� N PRE -LIFT ELEVATIONS BY CE (11.02.20) 0.0 POST -LIFT ELEVATIONS BY SHEET: _ l , : :. LEGEND............................................ EN ELEVATION BASEPOINT 0 PROPOSED PAD/BLOCK X EXISTIN1 IEkSE DOES NO Al- HO IZE AN PROPOSED BEAM EXISTING PAD/BLOCK P €L �� NG1C1 p5yy NI It ...... BR S9 G i EXISTING BEAM (3 PROPOSED PIER EXISTING BREAKOUT PIE h% NAL. .- CR0S<mm9MlW ING Y TBPE FIWATEi5944 - (469)-76PMW I(5AEEA_9W1PRI§PT8X ENGINEERING I FOUNDATION REPAIR RELEASE DOES NOT APPLY TO CONSTRUCTION IN EASEMENTS OR PUBLIC RIGHT-OF-WAY. 813 HEATHERWOOD D L F-VJ E�F�'ROVED DEC 1212M CROSSTOWN Date: November 30, 2020 Adam A. Green, P.E. (FL & TX), MBA Tampa: (813) 702 -3398 1 Dallas/Ft. Worth (469) 751-7694 Attention: Structured Foundation Repairs, Inc. (SFR) (via e-mail) Subject: Final Report & Inspection 813 Heatherwood Drive, Grapevine, TX. 76051 Dear Structured Foundation Repairs, Inc. and Property Owner: Structured Foundation Repairs, Inc. (the contractor) retained Cr sstown Engineering (CE) to visually in- spect foundation repairs completed by Structured Foundatio airs, Inc. Crosstown Engineering visited the property, conducted a visual inspection, and determir. at a 1 work, including any approved changes, has been completed per our original report dated 1�r6 0 A Based on information provided by Structured dation Repairs, Inc. and visual observations, it appears that the following was performed: • Installed 8 total pilings (8 interior). • Adjusted 18 existing pilings. The elevation data obtained during the inspection indicates the foundation is supported by pilings to prevent further downward movement and may have been lifted. In s cases, the pilings are meant to support the foundation and minimal to zero lift was intentional. We recommend post -lift plumbing tests be pe rl� on the sewer and potable plumbing lines and that any leaks be immediately repaired. This epair plan is intended to provide reasonable repair to improve the performance of the foundatio is not intended to level the foundation. The contractor determined the amount of elevation correction needed based on the reaction of the structure during the lift in order to minimize damages and additional stress. If you have any questions or need additional information, please call our office. Sincerely, Crosstown Land Development Services Texas Engineering Firm (F-15944) Adam Green, P.E., MBA Professional Engineer (TX # 116597) r - i±$ J I 11/30/20 Foundation Report OF a 11097 , t Page I of 3 CROSSTOWN DISCLOSURE & DISCLAIMER Adam A. Green, P.E. (FL & TX), MBA Tampa: (813) 702 -3398 1 Dallas/Ft. Worth (469) 751-7694 It is known to knowledgeable professional engineers that the soils in this. area are subject to movement due to expan- sion, contraction or densification of the soils etc. This soil movemeuld possibly cause the foundation to move after the remediation plan within the attached report has been impnt d and may impact the stability of the foun- dation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED B GINEER AS TO THE PERFORMANCE OF THIS FOUNDATION OR THE REPAIRS THERETO. Di ' P undation maintenance to maintain consistent soil condi- tions along the perimeter should reduce further probl s after the recommendations within this report have been implemented. However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability of the foundation and put it in danger of further damage. REPORT LIMITATIONS This report is written for informational purposes only and is not intended to be a detailed technical evaluation of the property or an inventory of defects. The opinions expressed in this report are based on a visual evaluation of current conditions observed at the time of the inspection. THERE IS NO WATY, EXPRESSED OR IMPLIED, CON- CERNING THIS ENGINEERING REPORT. The information in this report supersedes any verbal coinUpl 01'xpressed or implied, made by Crosstown Land De- velopment Services or its principals, agents or emplo ehe client agrees that neither CLDS nor its employees or owners will be responsible for: C' 1. Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite drilling and testing of the recovered samples, 2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the client; and 3. Any other element such as joists or beams and other structural members that is boxed or otherwise not readily available to CE for viewing, and releases CE from any liability attributable to such knowledge or conditions. Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent performance of the facility at the time of this structural survey. Compliance with any code or specification other than as expressly noted is specifically excluded. The provided Floor Elevation Map and resulting recommendations are based on conditions as they now exist and DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEaAND OR AREAS MAY NOT MANIFEST IN THE FUTURE. This report was prepared expressly for the client and expdr r the purposes indicated by the client. Permission for use by any other person for any purpose, or by the cJ,ie different purpose is denied unless otherwise stated in writing by CE. 6 VOMISSIONS CE SHALL HAVE NO LIABILITY FOR ACTS BY THE CONTRACTOR OR HIS SUBCON- TRACTORS PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE CONTRACTOR TO PER- FORM THE WORK IN ACCORDANCE WITH THE REPAIR PLAN. CE IS NOT RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE OR PROCEDURES OR THE PRECAU- TIONS INCIDENTAL THERETO. CE expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the client ex- pressly disclaims that it has contracted for or received any warranty of fitness for a particular purpose with respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF CE AND THERE ARE NO WAR- RANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE OF THIS AGREEMENT. Foundation Report Page 2 of 3 ONSTRUCTION NOTE: -IF INTERIOR PILING LOCATIONS ARE SHOWN ON THIS MAP THEY ARE APPROXIMATED AND ARE LOCATED j WITHOUT KNOWLEDGE OF THE I LOCATIONS OF THE INTERIOR GRADE BEAMS. THE CONTRACTOR SHALL MAKE FIELD JUDGEMENTS BASED OFF OF THEIR GRADE BEAM j INVESTIGATIONS AND OBSERVED --�-- SLAB QUALITIES TO FIELD LOCATE THE FINAL INTERIOR PIER LOCATIONS. -FINAL SCOPE_ 16A CHANGES SHALL BE APPROVED BY 17A r THE ENGINEER OF RECORD. 16A 15A PLEASE NOTE: IF EXISTING PILINGS ARE -SHOWN ON THIS MAP, THEIR LOCATION WAS PROVIDED BY THE CLIENT AND IS APPROXIMATE. CE DOES NOT CERTIFY THEIR PERFORMANCE OR-EXISTENCE.--IFTHE READER WOULD LIKE TO DETERMINE IF THEY ARE ACTUALLY PRESENT, THEY MUST CONTACT THE OWNER OR WOOD I CONTRACTOR TO OBTAIN AN ENGINEERING DECK I CERTIFICATE FOR THEM. I I 1A 2A 3A I 2) 1- - 0.8 -0.5 - -0.9 {2 (2.2) (0 5) (0.0) (-1.0) (-1.1) (1.2.7 fic 1.0 Y5 Q (--1.4 (-1.1) -- (0.5) (-0.8) (1.0) 1.1 z 6 O (-0.4) 14A f; 2.4 (1.1) (1.2) 13A 2.3 �' -0.2 --- - -0.3 0.6 10.21 (-0.1) (0.6) (0. 0.8 3 • 4 1.1 (0 Al in 6) -J - (0.5) 12A 1.8 (0.9) %0.9 1.2 A o (0.9) 11A �. GE (1.2) 1.6 1 6 • INSTALLED 8 TOTAL PILINGS (8 INTERIOR). • ADJUSTED 18 EXISTING PILINGS. (0.8) 5A 1.3 1.8 M 1'� BA I� 4A 1.3 (0.9) 7A 8A (2.8) 4.2 „ 9A ;4 -0.8- --0.8 (-0.8) - 0 7 (-0.8) }; (-0.6) (70.8) -1.0 -- -1.0 0081 ,, 0.2 (0.2) -0.2 A/C -0.5� l'i"'" 4-- - (-0.3) . (1.0) (0.3) (0.9) (0.3) 0.8 (0.9) 0.3 FRONT LIMITED REPAIR PLAN *NOT TO SCALE - ALL LOCATIONS APPROXIMATE* PRE -LIFT ELEVATIONS BYCE (11.02.20) 0.0 POST -LIFT ELEVATIONS BYCE (11.30.20) (X.X) 461LEGEND ELEVATION BASEPOINT L] INSTALLED PAD/BLOCK EXISTING PIER 11.30.20 -INSTALLED BEAM _ EXISTING PAD/BLOCK EXISTING BEAM INSTALLED PIER CROSSTOWN ENGINEERING FOUNDATION REPAIR 4ti INSTALLED BREAKOUT PIER EXISTING BREAKOUT PIER CROSSTOWN ENGINEERING TBPE FIRM F-15944 - WWW. -751-7694 - DALLAS METROPLEX 813 HEATHERWOOD DR., GRAPEVINE, TX. 76051