HomeMy WebLinkAboutSFRA2020-3785 ATE OF ISSUANCE:
;�o
� v��, �1 aol n
T r X A s PERMIT #: SL
BUILDING PERMIT APPLICATION
(PLEASE PRINT
t 'LEGIBLY - COMPLETE ENTIRE FORM)
JOB ADDRESS: t u vvR D UlI M SUITE #
LOT: BLOCK: SUBDIVISION: (
BUILDING CONTRACTOR (company name): —���l�,,��l,l( Tey. �l i mil, TP 11 �-�
CURRENT MAILING
h ADDRESS: �_ � 0 LwwI ) ¢ .� ��� � j �
(� CITY/STATE/ZIP: l� I.f/�t.��i1 �1 t� ���AC{�,,� ^ PH: # ftM 4J`'1'`f' Fax #
C� PROPERTY OWNER: DM I�� 4 F(1(`` 0_ 4 � Gl[�r(i
CURRENT MAILING ADDRESS:1. &P17,E 1 l INjCI f �Ii[ C
CITY/STATEIZIP: ; 1 JL �a�} PHONENUMBER ]
PROJECT VALUE: $ 3 I5D FIRE SPRINKLERED? YES NO 7C
WHAT TRADES WILL BE NEEDED?? (check ones that apply) ELECTRIC ! 1 � PLUMBING MECHANICAL
DESCRIPTION OF WORK TO BE DONE: CJ CIrP 0\ Pi -e1C S "4 U
USE OF BUILDING OR STRUCTURE: Y +rl A
NAME OF BUSINESS:
Total Square Footage under roof:
Square Footage of alteration/addition: "`-, l Onk
❑ I hereby certify that plans have been reviewed and the building will be inspected by a certified energy code inspector in accordance with
State Law. Plan review and inspection documentation shall be made available to the Building Department (required for new buildings,
alterations and additions)
❑ I hereby certify that plans have been submitted to the Texas Department of Licensing and Regulation for Accessibility Review.
Control Number: (Not required for 1 & 2 family dwellings)
❑ I hereby certify that an asbestos survey has been conducted for this structure in accordance with the regulatory requirements of the Texas
Department of Health.
(REQUIRED FOR DEMOLITIONS, ADDITIONS AND OR ALTERATION TO COMMERCIAL AND PUBLIC BUILDINGS)
I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by
the Building Department and in compliance with the City Of Grapevine Ordinance regulating construction. It is understood that the issuance of
this permit does not grant or authorize any violation of any code or ordinance of the City Of Grapevine, I FURTHERMORE UNDERSTAND
THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY 0Y THE CITY, AND THAT THE
DESIGN PROFESSIONAL/OWNER IS RESPONSIBLE FOR OBTAINING SUCH APFL FRO APPROPRIATE STATE AND
OR FEDERAL AGENCY(S). PRINT NAMFIN �o Om r N Qi SIGNATURE
PHONE #: l �i) 1 i '�S 7. �r EMAIL: � L&b
Q CHECK PREFERRED TO BE CONTACTED BY E-MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Type: Permit Valuation: $ Setbacks Approval to Issue
Occupancy Group: Fire Sprinkler: YES NO Front: Electrical
Division: Building Death: Left: Plumbin'=
Zoning: Building Width: Rear: Mechanical
Occupancy Load: Ris t:
j Plan Review Approv*_Date: Building Permit Fee:
j Site Plan Approval: �� Date: Plan Review Fee:
Fire Department: Date: Lot Draina,-_e Fee:
Public Works Dcpartment: Date: Sewer Availability Rate:
Health Dc partment: Date: Water Availabi I i ty Rate:
Approved for Permit: Date: Total Fees:
j Lot Drainage Submitted: Approved: Total Amount Due:
P.O. BOX 95104. GRAPEVINE, TX 76M (817) 41"165 WORMSIOSPERWAPP+JCATKM imAev 1 ,2bi' i� \
IJ
►GR A F TE
i'T £ ► S S'=
City of Grapevine
P.O. Box 95104
Grapevine, TX 76099
(817) 410-3165 Voice
(817)410-3012 Fax
BUILDING --- RESIDENTIAL ALTERATION
Issue Date: October 23, 2020
PROJECT DESCRIPTION: Install (7) Piers for Foundation Repair
PROJECT # WWW.mygov.us
SFRA-20-3785 Permits
LOCATION LEGAL
1208 Hillwood Way Dove Landing Addition Blk 2 Lot 12
Grapevine, TX 76051
CONTRACTOR
Slab -Tex Stabilization, LLC
P.O. Box 870603
Mesquite, TX 75187
(972) 388-4344 Phone
(214) 715-6126 Mobile
OWNER
Farrah Fierro-agado
1208 Hillwood Way
Grapevine, TX 76051-6652
AVAILABLE INSPECTIONS
Building Final (required)
INFORMATION
—APPLICANT NAME
—APPLICANT PHONE NUMBER
County
Fire Sprinkler System?
Square Footage
VALUATION
FEES
Building Permit Fee, ($150.00 Flat Fee) Simple
Alteration
PAYMENTS
Brian Frye
2147156126
Tarrant
NO
3150
TOTAL = $ 150.00
$ 150.00
TOTAL ; $150.00
Slab -Tex Stabilization, LLC (Brian Frye)
Check on 1012312020 ($150.00)
Note: CK1224
NOTICES
1) ALL work must be done in compliance with the 2006 INTERNATIONAL
BUILDING CODE.
2) A copy of the signed permit and approved plans must be on site at all times.
3) The project address must be clearly posted at the job site.
READ AND SIGN
I hereby certify that the foregoing is correct to the best of my knowledge and all
work will be performed according to the documents approved by the Building
Department and in compliance with the City of Grapevine Ordinance regulating
construction. It is understood that the issuance of this permit does not grant or
authorize any violation of any code or ordinance of the City of Grapevine. I
FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE
NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND
THAT THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR
OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR
FEDERAL AGENCYiS).
e Date
MYGOV.US City of Grapevine i BUILDING — RESIDENTIAL ALTERATION i SFRA-20-3785 i Printed 10/23/20 at 12:01 p.m. Page 1 of 2
ALL CHANGES REQUIRE
Provide Signed and SealCdPage Two Inspection Services APPROVAL
letter from RegisterqgNSULTING ENGINEERS, STRUCTURAL, MEciEW,REVISED PLANS
Engineer confirming site 315 Farrar Road, Waxahachie, Texas 75165
inspection and approval O Tel: (972) 268-4140 Fax: (972) 935-0184 APPROVED PLANS SHALL BE
pier installation when - KEPT ON JOBSITE AT ALL TIMES
work Is con beWn Inspection October 20, 2020
Slab -Tex Foundation Repair CONTRACTOR SHALL CALL FOR
Ms. Amanda Frye
Tel: 972-388-4344 INSPECTIONS:
Email: amanda@slabtexfoundation.com (817) 410-3010
Referenced Residence: &ONTRA TOR REGISTRATION
Re: Structural foundation inspection of the house at 1208 Flillwood Way, �I 51'e 1/OKED UPON
76051. 11V1
PERMIT EXPIRATION.
Per your request, my representative or I have made a visual inspection of the referenced property.
The purpose of this inspection was to verify the structural integrity of the structure foundation of
the referenced structure. The following are my on -site observations:
ON -SITE OBSERVATIONS: The subject structure is a two-story, brick veneer, single family
residence, with a slab on grade foundation. The foundation along the perimeter of the residence
has experienced a measurable amount of differential settlement and lateral movement, evidenced
by cracking in the exterior concrete, veneer and some slope in the floor. This can be repaired with
the addition of exterior pressed concrete piers below the foundation. Perimeter of the foundation
beam and interior floor area is to be re -leveled and stabilized to the best possible original
elevation. Use steel shims for re -leveling. Also, improve drainage around perimeter. All work is
to meet or exceed the intent of the 2015 IRC building codes. Current elevations provided by the
contractor.
After all repairs are completed, I recommend the homeowner have the plumbing and drains
checked by a licensed/bonded plumber and have the results forwarded to the engineer. If the
homeowner would like the floors to be closer to level, Ardex or a two-part, high strength, self -
leveling epoxy can be used for fine leveling. Repair all interior and exterior cracks so they do not
get worse.
I recommend the homeowner follow the enclosed Foundation Maintenance Program.
Disclaimer: This inspection consisted of visual observations only. The inspection excluded
electrical, architectural, framing, mechanical, termites, wood destroying insects, dry rotting wood,
sidewalk, driveway, and all detached structures. No performance warranty of any kind is
expressed or implied. Due to the soil type in the area, the foundation may experience
movement/settlement in the future. The structure is in the condition consisINTWORASWEVINE
building of its age and one that has been subject to a measurablq��� TRUCTION,
the local, city, county, state, federal, or any applicable code is (n inan 1 § ort an
sketch, then the code requirement overrules and takes precec814.EET: i OF:
Limit of liability shall be the fee paid for this report. RELEASE DOES NOT AUTHORIZE ANY WORK IN
CONFLICT WITH Tldl`� gPDE OR ZONING ORDINANCE.
Sincerely,
Lee Charles Page, P.E. #61555
Page Two Inspection Services #F-20584
1208 HILLWOOD WAY
20-3785
Install 7 Piers / Foundation Rep
CITY AP OV LAfTO BE KEPT ON
_LL TIMES
... .......
555
DATE:°its �i"�• --�"
E3C`J N DIVISION:
RELEASE DO��4FT TO CONSTRUCTION IN
EASEMENTS a PUBLIC RIGHT-OF-WAY.
ALL CHANGES MUST BE APPROVED
OFFICE COPY
Typical Pile Detail
Soil Backfill
After
Foundation X
X X X
Lifting '
Support Blocks
—
L—J
16 x 18 x 12
—
= 5000 PSI Pile Caps
Pneumatic Initial Force
As Recommended By
Shim As �—
The Manufacturer With
Required
Incremental Force To
For Fine —
The Point Of Rejection
Leveling --
Or Refusal
6" Diameter 12" Long
Piling Segments 5000
Le end 1J
PSI Concrete
Pre -cast Pier
Minimum Depth 12'-0 or
Equal
Page Two Inspection Services
Slab -Tex Foundation Repair
315 Farrar Road
Ms. Amanda Frye
Waxahachie, Texas 75165
Tel: 972-388-4344
Registration #F-20584
Date 10/20/2020
I S K- i
ui
V Z
P
z
z z QI
Z Ycr O >
4 ' o 0 w U)
�� wf Z�3m
>.z W 2{{ pXLL(L
Foundation i� P1�W m JI > z Q Q
Install Pressed C taw% O Q� I z o R m
Not to Scale O _ ~� CE o v ~
Brick Veneer U Ix ¢ c�es w a C in D
Slab on Grade U.
0 0 0 z
0
t�-Q Vm wm ZzC/,w
a
v,w'_ �Wzz
-0.7 -1.0 -lit -0; � .8 d = m 2 c =
w ��� a�.i ' U,¢
W wwU ti Uw—J
0.0 LU
z F=
-0.2 8).4 U
-0.4 0_0
-0.3
-0.2
0.0 -0.3-------------
0.5----
I�
FD
------- Garage
0.0
Plan View Front
1208 Hillwood Way Driveway
Grapevine, Texas 76051
�E of rF�1
.,sal
..............................:....
[E CHARL PAGE, JF
Page Two Inspection Services
CONSULTING ENGINEERS, STRUCTURAL & MECHANICAL
315 Farrar Road, Waxahachie, Texas, 75165
Tel: (972) 268-4140 Fax: (972) 935-0184
Foundation Maintenance Proaram
Highly plastic clay soils, as are typically found in the Dallas/Fort Worth area, exhibit a great
amount of expansion and contraction caused by seasonal moisture changes and varying weather
conditions. Clay soils that become too dry will shrink and not be able to maintain the physical
elevation of a structure's foundation. High ambient temperatures and long periods of inadequate
rainfall can cause moisture loss several feet below the surface and take a devastating toll on
foundations. Conversely, clay soils that become overly saturated can lose their load bearing
capacity.
Guidelines regarding residential foundations and soil moisture changes:
❑ The key to maintaining foundation elevations is proper drainage. Water should always run
away from the house with no pooling of water near the foundation. Soil should be about 2"
below the top of the perimeter grade beams, and slope about 1"-2" per foot for a minimum of
18" away from the perimeter. It is recommended to place fill dirt at perimeter grade beams,
gutters, and splash blocks under downspouts. Only clay -like soils should be added around the
perimeter, NOT porous or sandy soils.
❑ Keep an eye on the soil conditions around your house by looking at the "soil line," which is
where the soil meets the concrete beam wall. If the soil line has pulled away from the
foundation more than 1/2", it is time to water. Ideally, the soil should be snug against the
wall. if you see that the soil has pulled away, it is recommended to not add water directly into
the separation because it may settle under the beam and make the soil in that area too wet.
Instead use a sprinkler or a soaker hose. The separation should close by itself in a few days.
❑ The moisture content of the soil at the perimeter of the foundation should be slowly increased
and maintained during all seasons. Water the foundation in a uniform and systematic manner
with an automatic system or soaker hoses placed 12"-18" from the perimeter beam wall. The
key is to keep the soil moist but not muddy. Watering every other day for about twenty
minutes is usually sufficient, but should be increased during very hot, dry periods when
drying cracks occur. During hotter seasons, the South and West sides of the house might
require more watering because of exposure to more direct sun than the North and East sides.
❑ It is recommended to not plant trees or shrubs next to the foundation because their roots sap
moisture from the soil, both at the foundation and under the slab is t1:ea lei INE
moisture content of the active supporting soil at var. h can caug 1 CT�ON
settlement of the foundation. Trees, in particular, sh
expected growth height (i.e. if a tree is anticipated to grow 30' tall, it should be planted at
least 30' away from the house.) Also, certain fast 9bQaT bh .c (like_=L- Pe��liotiaxiasa
should be avoided completely, if possible, because RF*F"FuWQW&Qi69W1TkI&M[e1ANY WORK IN
hence fast-growing. CONFLICT WITH THE BUILDING CODE OR ZONING ORDINANCE.
Most major foundation movements can be prevent4@fft)fe tt RRWWEt _��1TO BE KEPT ON
maintained. The extent of distress will be lessened and the se�I tlg *'FA 1bTiMES
considerably increased.
_
Lee Charles Page, P.E. #615 T(IL BY:72} SGINSPECTION DIVISION:
RELEASE DOES NOT APPLY TO CONSTRUCTION IN
EASEMENTS OR PUBLIC RIGHT-OF-WAY.
ALL CHANGES MUST BE APPROVED
NOV 4 2020
Page Two Inspection Services
CONSULTING ENGINEERS, STRUCTURAL, MECHANICAL
315 Farrar Road, Waxahachie, Texas 75165
Tel: (972) 268-4140 Fax: (972) 935-0184
Foundation Inspection November 4, 2020
Slab -Tex Foundation Repair
Ms. Amanda Frye
Tel: 972-388-4344
Email: Amanda@slabtexfoundation.com
Final Inspection:
Re: Structural foundation inspection of the house at 1208 Hillwood Way, Grapevine, Texas
76051.
Per your request, I or my representative have returned to the referenced property to conduct a final
inspection of the work performed by Slab -Tex Foundation Repair. The following are my on -site
observations:
All specified pressed concrete piers were installed under the slab on grade, two-story, brick
veneer, single family residence. At the time of the inspection, the work pertaining to the leveling
and repairing of the foundation, and the backfilling of the soil along the perimeter of the house was
complete. In my opinion, the work performed by Slab -Tex Foundation Repair was satisfactor" .
Al I work meets or exceeds the intent of the 2012 IRC building code.
Please recommend that the homeowner have the plumbing and the drains checked by a
licensed/bonded plumber and have the results forwarded to the engineer. If the homeowner would
like the floors closer to level, Ardex or a two-part, high strength, self -leveling epoxy can be used
for fine leveling. Repair all interior and exterior cracks so they do not get worse.
I recommend the homeowner follow the enclosed Foundation Maintenance Program.
I am pleased to perform this inspection for you. Should you need further assistance in this matter,
please do not hesitate to call.
Disclaimer: This inspection consisted of visual observations only. The inspection excluded
electrical, mechanical, architectural, framing, termites, wood destroying insects, dry rotting wood,
driveway, sidewalk, garage, wooden deck, and all detached structures. No performance warranty
of any kind is expressed or implied. Due to the soil type in the area, the foundation may experience
some movement/settlement in the future. The structure is in the condition consistent with a
residential building of its age and one that has been subject to a measurable amount of foundation
damage. If the local, city, county, state, federal, or any applicable code is more stringent than this
report and sketch, then the code requirement overrules and takes precedent.
Limit of liability shall be the fee paid for this report.
Sincerely,
Lee Charles Page, P.E. #61 55 5
Page Two Inspection Services #F-20584
Soil Backlill
After
Foundation X X
Lifting
—�IJ_
Shim As --
Required
For Fine --
Leveling
Legend �1
Pre -cast Pier
Page Two Inspection Services
315 Farrar Road
Waxahachie, Texas 75165
Registration #F-20584
Date 11104/2020
Typical Pile Detail
X X
Support Blocks
16" x 18" x 12"
5000 PSI Pile Caps
Pneumatic Initial Force
As Recommended By
The Manufacturer With
Incremental Force To
The Point Of Rejection
Or Refusal
6" Diameter 12" Long
Piling Segments 5000
PSI Concrete
Minimum Depth 12'-0 or
Equal
Slab -Tex Foundation Repair
Ms. Amanda Frye
Tel: 972-388-4344
SK-1
Foundation Revair Plan
Pressed Concrete Piers
Not to Scale Residence
Brick Veneer 2 - Story
Slab on Grade Final Elevations
r-----------i
■ E�eC.
BD 0.6 0.5 0.3 0.7 0.9
Wooden 0.0
Deck 0.1 0.4
Fence
0.0 0_0
0.0
Fence
AC 0.1
0.2
_L FD _ _ Garage
0.3
Plan View F
1208 Hillwood Way
Grapevine, Texas 76051
ront
Gas
OF
Driveway 5.`' 'T�? y®tit
I
r X'
LEE CHARLEL' PArE, JR.
4��;azijfygL �G