HomeMy WebLinkAboutROOF2013-1550HECK BOX IF PREFERRED TO BE CONTACTED
BY E -MAIL
THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING
INSPECTION DEPARTMENT
Construction T e: Permit Valuation: $
Setbacks'
Approval' to ISSue
Front: Electrical
Occupancy Group: Fire S rinkler: YES NO
Division: Building Depth:
Left: Plumbing
Zoning: Building Width: '
Rear: Mechanical
Occupancy Load:
Right:
Plan Review Approval:, Date:
Building Permit fee:
Site Plan Approval: Date:
Plan Review Fee:
Lot Drainage Fee:
Fire De artment: Date:
Public Works Department: Date :
Sewer Availability Rate:
Health D arhnent: Date:
Water Availability Rate:
Total Fees:
Approved for Permit: Date:
Lot Drainaue Submitted: Approved:
Total Amount Due: