HomeMy WebLinkAboutPLIRR2013-1306Irrigation
Qty Symbol Description Part Number I Pressure I Flow I Radiusl
,SDrinklers '
3
e
Hunter 10H SRS-04
10H
30 psi
0.82 gpm
110 It
2
n
Hunter 100 - SRS-04
10Q
30 psi
'I (,Pm
loft
I
n
Hunter MPI 000 90' - PROS-04-PRS30
MP1000 90-210*
30 psi
dl6qpm
12 ft
4
11
'[ MP ? 000 180'- PROS-04-PRS30
MP2000 90-210'
30 psi
0.63 gpm
17 It
WRFC
Hunter MP2000 360' - PROS�6�PRS30
MP2000 360*
30 psi
1.27 gpm
17 It
4
n
I Hunter MP2000 90' - PROS-04-PRS30
MP2000 90-210'
30 psi
0.33 gpm
18 It
water bource,
N Co
C: r- 7 2
W - —0
= C3 70
C2 4D
W -j ca
I I M
1518 inch meter
Backflow Devices
O.d8
1 1 @
I Febco 715 - 314"
1.9 psi
Control Valves
0.049 psi
0 psi
30 psi
13 1 e
I Hunter PGV-1 01 G
Y-Strainers I Filters
T I —
I Febco 650A-314"
14304
Irrigation Accessories
Hunter WRFC
WRFC
0i
XC-400,
1
c1
Nelson 9501 -1001N
9501 -1001N
Lateral Line Pipe
1249,41 It I —
I Class 200 314"
--1
Mainline Pipe
144.64 ft I - - - •
I Class 160 1"
/1,4— — pjo{- lyf' A
2
ritungS LOSS
Elevation
SLnnkler Requirement
Total Design Pressure
Residual Pressure
65, si
N Co
C: r- 7 2
W - —0
= C3 70
C2 4D
W -j ca
op !
0.993 ps,]
0.386 psi
O.d8
0:11 psi
1.9 psi
0.378 psi
0.049 psi
0 psi
30 psi
35.665 psi
?9.335 psi
--------------------------- -----------
Idl- P-r
VV
ey
5.21"
GPM •
CONTRACT0
INSPECTION
Ad I
111SWITE
2�r
L - - -
GPM
;i
0
I.-
O.
UJI
W . 2
Uj
(n E
11
im
4/812013
JOB NUMBER:
458
NM
Andrew Grey
CHECKED BY:
�—1
Andrew Gray
�P7201 I
SHEET:
APR1,22013 10f1
lRecommendations
Maximum Recommended 113 - IN
(Available
. 5815 psi
I I
Ehhanced Turf, Inc
M•M a��
M
Irrigation in Texas is regulated by the Texas Commission on Environmental Quality
Austin, Texas 78711-3087. TCEQs web site is: www.tceg.state.tx.us.
Box 13087,
NAME OF BUSINESS WHERE DEVICE IS LOCATED:
ADDRESS OF SITE SERVICED:
PLUMBING PERMIT IF APPLICABLE:
TESTER LICENSE NUMBER: /-R r2�-31
DATE OF LAST TEST GAUGE CALIBRATION: z
A
ANN'U'AL TEST
IRRIGATION
OTHER
EXPIRES: Ohv,
THE BACKFLOW PREVENTION ASSEMBLY DETAILED BELOW HAS BEEN TESTED AND MAINTAINED AS REQUIRED BY
TCEQ REGULATIONS AND IS CERTIFIED TO BE OPERATING WITHIN ACCEPTABLE PARAMETERS.
TYP -."OF ASSEMBLY
REDUCED PRESSURE PRINCIPLE PRESSURE VACUUM BREAKER
DOUBLE CHECK
ATMOSPHERE VACUUM BREAKER
MANUFACTURER:
SIZE:
MODEL: ell SERIAL NUMBER: 7�
PHYSICAL LOCATION OF METER: -------
REDUCED PRESSURE PRINCIPLE ASSEMBLY
DOUBLE CHECK VALVE
ASSEMBLY
11T CHECK 2'4' CHECK REL19f VALVI
DC-Closed Tight Closed Tight
initial I _RP 4ale/psid
Test
1Leaked Leaked
Materials
PRESSURE VACUUM BREAKER
AIR INL
Test DC-Closed Tight Opened at Opened at
After Closed Tight
Repair RP _ psid
psid psid
The above is 'cer
/-11, '�� I Iffied to be true.
TESTERS FIRM NAME:
�ME.
---. - v
psid
CHECK VALVE
psid
ADDRESS: CITY/STATEIZIP:
DATE:
PHONE NUMBER: 6
PRINT NAME:
SIGNATURE:
'�SPEC TION A T (8, 17) 4 10-3010
D OUSL E CHECK VA L VE IMSFEC TIOM MUS T E E CA LL ED
F YVSPFCrm-1fJ A 7-
0-AFORMSM REGISTRATION FORM&TCEO BACKFLOW TESTER REGISTRATJON.doc
11/3/00ftv. 4105,1/06,2/10
K
� �
DATE: /�� /�.2, F-�u BUILDING
ADDRESS SN|MM|NGPOOL___
PERMIT #: PLUMBING
I hereby certify that I have inspected the water supply system at the above referenced address. To the best ofrny
knowledge, the materials and methods used in the installation of this system comply with the plumbing code adopted
by the City ofGrapevine. Plumbing code ia located in Chapter 7. Article VU|' (Ordinance number 02-17), and Chapter
7, Article V, (Ordinance number 01-93).
In addition, �t�the best of my knowledge, no cross connection exists at this address at the time of inspection.
LICENSE NUMBER
TITLE
DATE
INSPECTOV