Loading...
HomeMy WebLinkAboutItem 13 - 2015 Inflow and Infiltration ProjectAA 1:4 LVA FROM: BRUNO RUMBELOW, CITY MANAGER /#- 31! 1 il i i i 1 :1iii i I 1 11111 11111 1 1 hi& SUBJECT: AWARD OF ENGINEERING SERVICES CONTRACT — 2015 INFLOW AND INFILTRATION PROJECT City Council consider approving an engineering services contract with Burgess & Niple, Inc. in the amount of $ 141,450.00 for the design of the 2015 Inflow and Infiltration Project, authorize staff to execute said contract, and take any necessary action. Funds are programmed in the Wastewater Permanent Capital Maintenance Fun'*' (PCMF) Acct # 201-48940-534-9-0004SW P,►IM-001 Millon Burgess and Niple, Inc, (B&N) has submitted a proposal to provide engineering design services for the rehabilitation and replacement of existing sanitary sewer lines in the Canterbury Village Addition, the Oak Grove Addition area, along Dove Road from Dove Lift Station Number 2 to Kimball Road, in South Shore Acres within and downhill of Harber Avenue and near the intersection of Placid Circle and Peninsula Drive. The sanitary sewer lines proposed for rehabilitation in this project have been identified to have excessive infiltration and inflow into the lines and are part of an ongoing effort to maintain sewer infrastructure and avoid regulatory action against the City. The additional groundwater and surface water introduced into the sanitary sewer collection system causes excess flow to the wastewater treatment facilities and potential overflows from sewer manholes. The design is proposed to incorporate trenchless construction, where possible, where the existing lines will be burst in place and simultaneously replaced with a new line. However due to existing conditions and slope problems within the existing lines, there are areas where open cut will be required. New sewer services and cleanouts will be installed for residents served by the lines in these areas. Manholes and cleanouts for the sewer main will be replaced or rehabilitated. Canterbury Village Addition is a single family residential subdivision northwest of the intersection of Dove Road and Silvercrest Lane. The sanitary sewer in Canterbury Village Addition is clay pipe installed in 1973. M. iNTO'Eromil 0 -, a OSUMI* RAAgenda\2015\05-19-15k1&1 eng Award.doc The existing sanitary sewer lines along Dove Road draining to Dove Lift Station Number 2 is very flat and needs to be reconfigured to accommodate downstream elevation changes and upcoming improvements to the existing lift station near the entrance to Horseshoe Trails. The sanitary sewer lines along Dove Road between Silvercrest Lane and Kimball also need to be rehabilitated. The majority of these sewer lines are clay pipe that were installed in 1973. The existing clay tile sanitary sewer in South Shore Acres was installed in 1968. There is a section of clay tile sewer behind the homes near the intersection of Placid Circle and Peninsula Drive that needs to be replaced within the Corps of Engineer's flowage easement. This will be done by trenchless construction methods and new manholes will be installed to prevent infiltration when the lake is at higher than normal elevations. The engineering services portion of this contract with B&N totals $101,450.00. The special services portion of this design contract is not to exceed $40,000 and Includes needed surveying. The construction budget is estimated by B&N to be approximately $1,202,927.00. B&N specializes in this type of work, is well qualified to perform the design and we have used them on past projects with excellent results. Staff recommends approval. RAAgenda\2015\05-19-15\I&1 eng Award.doc