Loading...
HomeMy WebLinkAboutCOMA2011-3904THE FOLLOWING IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction iType: Permit Valuation: $' Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES C NO Front: Electrical Division: Building Depth: Left: ; Plumb' Zoning: Building Width: Rear: M apical Occupancy Load: Rig Plan Review Approval: Date: Building Permit Fee: Site Plan Approval: Date: Plan Review Fee: n Fire Department: Date: Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Health Department: Date: Water Availability te: Approved for Permit: Date: Total Fees: �? Lot Drainage Submitted: Approved: Total Amount Due: �s City of Grapevine, TX P.O. Box 95104 http: / /mygov.us /pi /prof ects / newpermit /printpermit.php ?permitid= 104... BUILDING - -- COMMERCIAL ALTERATION Issue Date: October 27, 2011 PROJECT DESCRIPTION: Partial Interior demo. of warehouse "Associated Aircraft Supply Co., LLC." PROJECT # (817) 410 -3010 www.mygov.us COMA -11 -3904 inspections permits Grapevine, TX 76099 LOCATION TENANT LEGAL (817) 410 -3165 voice 3250 Stone Myers Pkwy. Associated Aircraft Supply Co., LLC Stone Myers Business Park Blk 3 (817) 410 -3012 Fax Grapevine, TX 76051 Lot 1 No. 3 220 Tr 1 "'41017536* CONTRACTOR INFORMATION Hite Baldwin Construction, LLC * APPLICATION STATUS In Review 755 Bandit Trail * CONDITIONAL USE REQUIRED? NO Keller, TX 76248 * CONSTRUCTION TYPE IIB (214) 215 -8730 Phone * OCCUPANCY GROUP B /F1 (817) 288 -0932 Fax * OCCUPANCY LOAD No change (214) 215 -8730 Mobile * ZONING DISTRICT LI ** NAME OF BUSINESS Associated Aircraft Supply Co., LLC OWNER * *APPLICANT / TENANT'S NAME Hite Baldwin Frazier Liv Trust * *APPLICANT / TENANT'S PHONE NUMBER 214 -215 -8730 6020 Cedar Springs Rd 1) Certified Energy Code Inspected Dallas, TX 75235 -6808 2) Accessibility Review 3) Control Number AVAILABLE INSPECTIONS 4) Asbestos Survey YES MISC. Building Inspection (required) -- - Building Framing (required) Acreage Final Fire Dept Inspection (required) APPROVED TO ISSUE ELECTRIC NO Final Public Works Inspection APPROVED TO ISSUE MECHANICAL NO (required) Building Final (required) APPROVED TO ISSUE PLUMBING NO Final Building C/O Inspection County Tarrant (required) Fire Sprinkler System? NO Square Footage 15000 VALUATION 14000 What is use of Building /Structure? manufacturing and warehouse FEES TOTAL = $ 350.21 Building Permit Fee $ 212.25 Building Plan Review $ 137.96 PAYMENTS TOTAL = $ 350.21 CONTRACTOR MUST REGISTER OR RENEW (City of Grapevine Contractor) Check on 10/9912011 ($350.21) Note. Check #3240 NOTICES 1) ALL work must be done in compliance with the 2006 INTERNATIONAL BUILDING CODE. 2) A copy of the signed permit and approved plans must be on site at all times. 3) The project address must be clearly posted at the job site. READ AND SIGN 1 of 3 10/27x`2011 2:24 PM http: / /mygov.us /pi /proj ects/ newpermit /printpermit.php ?permiti d= 104... I hereby certify that the foregoing is correct to the best of my knowledge and all work will be performed according to the documents approved by the Building Department and in compliance with the City of Grapevine Ordinance regulating construction. It is understood that the issuance of this permit does not grant or authorize any violation of any code or ordinance of the City of Grapevine. I FURTHERMORE UNDERSTAND THAT PLANS AND SPECIFICATIONS ARE NOT REVIEWED FOR HANDICAPPED ACCESSIBILITY BY THE CITY, AND THAT THE DESIGN PROFESSIONAL / OWNER IS RESPONSIBLE FOR OBTAINING SUCH APPROVAL FROM THE APPROPRIATE STATE AND OR FEDERAL AGENCY(S). j U)a 9-1 �0 i 10 — Applicant's Signature Date 2 of 3 10,127/2011 2:24 PM Allen Hunt 3250 Sto Myers Tx Demo Page 1 � From: Allen Hunt To: Date: 10/24/2011 4:17 PM Subject: 3250 Stome Myers Pkwy. Grapevine Tx. Demo. I have been reviewing the Demo permit you submitted for the above location and there are a few issues that I would like to address with you. As the Demo plan refers to Architectural and Engineered plans, I want to ensure that this permit is for demolition work only. The interior alteration will require a separate permit and plans. The note #18 for the cut in the tilt wall, there are a couple of points to this, the engineering for this and it's approval will be required prior to the work being done. If there is to be a change to the exterior of the building as this will create and if there is to be a loss in parking space, approval from the City Planning Department will be required. All demolition work is required to have inspections. M.E.P.'s are to be demode back to a point of origination. Plumbing demo may not create dead ends and is to be capped with permanent fittings. Electric and communication's are to be demode back to panels and /or meter base with all demode wire removed from building. Mechanical to be demode back to unit'(s) or plenums. We will need a Certificate of Occupancy application submitted prior to issuing the interior alteration permit. Note that the alteration plans will need to be drawn by an Architect and M.E.P.'s Engineered for this building. Any roof loads differing from existing loads such as larger, heavier or relocated RTU's or loads supported on or from roof system will need to be Engineer approved / designed. Look forward to working with you, Allen Hunt Plans Examiner, City of Grapevine. (817) 410 -3129 .... .. ', a �, ww,��,..z rMa ronnzm ,.rim?w .a un .�i:..:. xro'u atiw.;a�w , xan,:t�.nm c~•x, m x.,i;, z .""mw;s�meua .,n na ,;� ,:x+�.a. w.flflx Allen Hunt 3250 Stome Myers Pkw�i Grapevine Tx Demo ache 1 From: Allen Hunt To: Subject: 3250 Stome Myers Pkwy. Grapevine Tx. Demo Mr. Baldwin, I have been reviewing the Demo permit you submitted for the above location and there are a few issues that I would like to address with you. As the Demo plan refers to Architectural and Engineered plans, I want to ensure that this permit is for demolition work only. The interior alteration will require a separate permit and plans. The note #18 for the cut in the tilt wall, there are a couple of points to this, the engineering for this and it's approval will be required prior to the work being done. If there is to be a change to the exterior of the building as this will create and if there is to be a loss in parking space, approval from the City Planning Department will be required. All demolition work is required to have inspections. M.E.P.'s are to be demode back to a point of origination. Plumbing demo may not create dead ends and is to be capped with permanent fittings. Electric and communication's are to be demode back to panels and /or meter base with all demode wire removed from building. Mechanical to be demode back to unit'(s) or plenums. We will need a Certificate of Occupancy application submitted prior to issuing the interior alteration permit Note that the alteration plans will need to be drawn by an Architect and M.E.P.'s Engineered for this building. Any roof loads differing from existing loads such as larger, heavier or relocated RTU's or loads supported on or from roof system will need to be Engineer approved / designed. Look forward to working with you, Allen Hunt Plans Examiner, City of Grapevine. (817) 410 -3129 ■ i� A � - 'i • " 141• ^ all S �1 1111, Jill A I HIP Ho I1�, IaIA:,�� J��t 1, I; L' II {I I� i as 11111a �s 91L B� a� sl °r i� ll� U " as 11111a �s 91L B� a� sl °r i� ll� STAT 1 O DESIGN GROUP, INC. EA 12* X 12* OVERHEAD SECTIONAL DOOR EXISTING CONCRETE DOCK • 1 i R I DATE: 8/30/11 I JOB NUMBER: 201 1.01 DEMOLITION PLAN D I a 0 LLJ E 0:0-00, C4 d ""'' 0 d Co /1 c' LLJ w CD t z Nc -.-. "r, C:,-. 0 --I cn E z ---�- W 0 . . J_ o < rZ to w CL 1 F_ 1 i R I DATE: 8/30/11 I JOB NUMBER: 201 1.01 DEMOLITION PLAN D I