Loading...
HomeMy WebLinkAboutItem 17 - Roberts Road WaterlineMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: JULY 16, 2013 SUBJECT: HERITAGE COVE ADDITION WATERLINE IMPROVEMENTS FINAL COST PARTICIPATION RECOMMENDATION: City Council consider approving Final Cost Participation with HERITAGE COVE, LLC for the construction of an 8" Waterline along Roberts Road, in the amount of $58,605.00, authorize the City Manager to execute the necessary documents and take any necessary action. Funds are available in the un- appropriated Utility Fund balance account #200- 48930- 534-8- 000033 -WA. Heritage Cove Addition is a 23 lot residential development located on the west side of Roberts Road. City Council and Heritage Cove, LLC entered into a Developer Cost Participation Contract on March 5, 2013 with a City estimated cost participation of $47,760.00 for the construction of 750' of 8" PVC water main, with connections. The southern connection of the new 8" line at Birch Lane had some added costs above the initial estimate. The existing lines in the area were constructed 20 to 25 years ago and were not as reflected in the construction plans and record drawings for the area. As the contractor proceeded south to this intersection, he discovered that the 6" line to the east was not connected as originally identified in old construction plans and that the line would need to be connected in a different manner to provide a looped connection. The added construction efforts needed to perform the revised connection in the roadway at the intersection of Roberts Road and Birch Lane totaled $10,845.00 in additional costs. Staff recommends approval. 7/9/2013 (1:00 PM)