Loading...
HomeMy WebLinkAboutRES 2002-027 RESOLUTION NO. 2002-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS APPROVING THE AMENDED LAND USE ASSUMPTIONS AND THE AMENDED WATER AND WASTEWATER CAPITAL IMPROVEMENTS PLAN PURSUANT TO WHICH AN AMENDED WATER AND WASTEWATER IMPACT FEE MAY BE IMPOSED AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Texas Local Government Code Chapter 395, Section 395.001- 395.080, provides a procedure for enabling Municipalities to enact Impact Fees; and, WHEREAS, the City Council of the City of Grapevine, Texas (the "City") has heretofore appointed an Advisory Committee in accordance with Section 395.058 of the Texas Local Government Code, Chapter 395; and, WHEREAS, the City intends to impose Water and Wastewater Impact Fees and established a Public Hearing Date to consider Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan within the designated service area that will be used to develop the Water and Wastewater Impact Fee; and WHEREAS, on July 16, 2002, the City Council of the City of Grapevine, Texas held a Public Hearing, after proper publication of notices required by Tex. Rev. Civ. Stat. Ann. Art. 1269j-4.11, to consider Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan that would be pursuant to which a Water and Wastewater Impact Fee may be imposed; and, WHEREAS, at the Public Hearing all members of the public were given the right to appear and present evidence for or against Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan; and, WHEREAS, as the City Council has determined that it is in the best interest of the City to approve the Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan; and WHEREAS, as this Resolution being adopted within thirty (30) days from the date from the Public Hearing in which the Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan were considered. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters in the Preamble of this Resolution are hereby incorporated into the body of the Resolution, as if fully stated here and for all purposes. Section 2. That the City Council hereby approves the Amended Land Use Assumptions and an Amended Water and Wastewater Capital Improvements Plan, a copy of which is attached hereto as Exhibit "A" and incorporated herein for all purposes, pursuant to which Amended Water and Wastewater Impact Fees may be imposed. Section 3. That this resolution shall take effect immediately from and after the date of its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 16th day of JULY, 2002. APPROVED: 4;S7)— ■-_ William D. Tate Mayor ATTEST: 6aHuf/ Ø City Secretary APPROVED AS TO FORM: John F. Boyle, Jr City Attorney RES. NO. 2002-27 2 EXHIBIT TO de" Page of .1L_ Summary of Land Use and Population 2002 2012 Ultimate Single Family Population 34,218 36,313 36,313 Multi-family Population 10,172 11,770 11,770 Total Population 44,390 48,083 48,083 Commercial Industrial Acres 2,111 3,945 3,945 Government Use Acres 426 442 442 Hotel Acres 38.79 96.01 96.01 Corporate Office Acres 4.85 9.71 9.71 Acres reported in 2002 are the developed acres,not total zoned acreage. T:\GPV 02232\S Ummary.x l s\summary EXHIBIT_ /9 TO Page of O N r 1 O N O O U) C 0 V 0 O •o N CL c o 1 ct 0. o O 0 a) c a) Q. V.) N N 0 0 N 0 0 0 0 0 0 0 0 0 0 0 N 0 0 O O O 0 O O 0 O uoneindod EXHIBIT /9 TO .4-a/Al°-1" 7 Page _ of ..._./..L,__._ N I--� 0. 00 f, ct 0 a C) N O XI N 4:1 PIM E in C Z p Z W D Co a° 0 a o GO N .� i C d Y CD v d' M r11111.11M1111.1.11111.111111111111. N IIIIIMINIE ,--4 O O O O O O O O 0 O O O O cNi N O 00 vO d- N uopmndod EXHIBIT TO liz-- 4&.-7-,27 Page r__ __ of I— N — 1111 . 1911111111111111 O 111111111.ip.111 0. y rill C:113 o0 czt ice. et - '1' 11111111111.1111.111111 a" Q N no Fl ..r C Ti 11111r1111111111.11111. et C4 eJ cA N z ❑ a 0 • Tut cu A 1111111.11.11.1arilli± ‘1- M N i O O O O O O O N O 000 N SB.13V EXHIBIT TO 4-a4ee-2--17 , Page , of _II_ E I) C/i V) 7-zi , . .7) .- ct 0 E 6" E E 6 ,.L1 • 7-4 n tr) ,,, ,,r, ,..) ri) co , ,..c (L) .1-4 P---1,_, 6 ,-ci 7', '"1 cri -c: 7' al . � � N ii � Q � M �II � CA N � � � N "ti �. ,..,• 1-1 In 1-4 a ct c., c) , N - oo T-+ N - oo cv a) a) ct EXHIBIT. I9 TO ,#4,9/'0?-2--27 Page . 0 of _1L_ I) Ct vp N C4 N V) r3 . 0 N N 0 P C P4 Pi ,,,L)U ct ,� c� N r—I 4(1- If '41A 41A CD '-1 'IA o II ., II el z.), U c, Q c, Q Q '- C7 L7 '-?: L7 L7 N 0 c o o O cc oo d- � C\CC N � N � 4 7t; • • • •1J cl) (1) I I CA CCU • • EXHIBIT TO4�= Page of City of Grapevine Capital Improvements Program Considered for 2002 Impact Fee Study • EXHIBIT A TO ,4 1 5 2 a7 Page $ of —4/----- Water Distribution System Projects Constructed before January 2002 Improvement Number Description Constr.Date Constr.Cost 1 Ball St. 12-in.Distribution line 1991 $157,500 4 Austin St. 12-in.waterline 1992 $63,705 5 Northeast Transmission Lines 1995 Developer 6 Northeast Distribution Lines 1995 Developer 9 Dove Tank Distribution 20-in./16-in.to SH 26 1990 $1,029,216 9 Dove Road Transmission Lines 2000 $948,549 10 12-in.Snakely Lane Distribution Line 1992 $77,326 11 SH 121 20-in/16-in.Transmission Line 1991 Developer 12 Parr Lane 12-in.Upsizing Reimbursement 1994 $12,680 18 Kimball Road Distribution Lines(Part I) 2000 $546,412 18 Kimball Road Distribution Lines(Part II-partial) 2001 $123,713 19 SH 121 Transmission Lines(Part I) 2000 $845,446 20 Scribner St.Transmission Line 2000 $566,536 24 Towne Center 12-in. Upsizing Reimbursement 1993 $22,440 26 Northeast Development Lines 1995 Developer 27 Northeast Supply Lines 1995 Developer 28 SH 121 Supply Line 2000 $1,209,277 2b Water Distribution II 20-in Transmission line 1990 $262,254 2b SH 26 Waterline Relocation,24-in Transmission 1990 $946,350 4, 13,20 Dallas Road 16-in./12-in.Distribution; St.Louis RR 1991 $518,800 12-in.;Ball St. 20-in./16-in. C Opryland 16-in.Water Loop 2001 $490,000 Newl Part I-Northwest Annex Distribution Lines 1995 Developer New2 TRA 12-in Connection @ Hall-Johnson Road 1992 $85,500 New2 12-in Waterline @ Hall-Johnson Road 1992 $13,035 TRA 30-in.Connection @ Pool Road 1991 $75,000 Hall-Johnson 30-in,Extension w/Colleyville 1991 $56,149 Hall-Johnson 30-in,27-in Waterline $745,026 1996 Impact Fee Study 1996 $36,200 TOTAL $8,831,114 EXHIBIT T0,116,--)04)-2. --17 Page of _./1 Water Distribution System Projects to be Constructed between 2002 and 2012 Improvement Proposed 2001 Constr. Inflated Cost at Number Description Constr.Date Cost Time of Constr. 8 SH 26 Distribution Lines 2004 $259,322 $291,702 11 SH 121 Distribution Lines 2002 $337,185 $344,220 (completed) 12 Parr Lane Distribution Lines 2004 $252,777 $284,340 15 SH 360 Distribution Lines 2003 $659,348 $659,348 (under constr.) 16 NW Distribution Lines(Part I) 2007 $76,930 $97,341 16 NW Distribution Lines(Part II) 2007 $480,864 $608,446 17 Ruth Wall-Bushong Distribution Line 2004 $176,411 $198,439 18 Kimball Road Distribution Lines(Part II-completion) 2007 $74,739 $94,569 19 SH 121 Transmission Lines(Part II) 2002 $352,960 $360,932 (completed) 20 Ball St.Transmission Line 2002 $935,838 $956,974 (completed) 21 2 MG Elevated Storage Tank 2002 $2,206,086 $2,206,086 (under constr.) 22 BS 114 Distribution Line 2004 $217,234 $244,358 23 Parr Road Development Lines 2002 $269,096 $269,096 (completed) A Clearwell at WTP 2005 $1,529,175 $1,788,919 B Arlington-Grapevine 12-in.Waterline 2004 $382,294 $430,029 D Heritage Ave.-Mustang-SH 26 12-in.Line 2005 $172,032 $201,253 E SH 114 and BS 114 12-in.Waterline 2004 $160,563 $180,612 F FM 2499 12-in.Distribution Line 2004 $382,294 $430,029 G Booster Pump Station 2004 $1,121,395 $1,261,417 H Ground Storage 2007 $892,019 $1,128,689 Newl NW Area Distribution Lines,Part II 2002 $237,713 $237,713 (completed) New2 SH 114 Transmission Lines 2005 $270,833 $316,836 New4 Additional Pump at WTP 2005 $65,406 $76,516 2002 Impact Fee Study 2002 $28,000 $28,000 TRA-WTP TRA WTP Expansion(30 MGD) 2003 $11,298,937 TOTAL $23,994,800 Construction costs shown are the City of Grapevine participation costs. Costs for TRA projects are proportioned to Grapevine based on Grapevine's ultimate use of TRA capacity improvements EXHIBIT A TO �n °" 2 �' Wastewater Collection System Page _ .11G.-- of Projects Constructed before January 2002 Improvement Number Description Constr.Date Constr.Cost 2 Dove Lift Station#2 Improvements 1994 $693,326 6 Park Blvd to Hughes Branch Bypass 1994 Included with#2 above 7 Snakey Lane 15-in. Sewer Line 1993 $127,936 8 SH 360 Line Encasement 1991 $38,667 10 10-in.Timberline Parallel Sewer 1989 $35,277 11 Hilton Lift Station Improvements(Part I) 1996 $687,287 12 South Ball St.8-in Line 1994 $100,541 13 College Street Improvements(Part I) 1996 $177,316 19 Minters Chapel Lift Station Improvements 1994 $275,957 21 8-in. Force Main from WTP 1992 $139,056 5,9 Eastside Outfall 1994 $962,143 New2 6-in. Banyon Place Diversion 1999 $40,000 New3 Rebuild Hood Lift Station $129,700 New4 Russwood Lift Station 2000 $520,536 New8 Dooley Lift Station 2000 Included with New4 above New6 2 MG WWTP Expansion 2000 $6,516,101 Newl l WTP Lift Station $12,000 1996 Impact Fee Study 1996 $36,200 TOTAL $10,492,043 EXHIBIT To 4:,.0„/,e94)„2--,17 Page _11._ of /1 Wastewater Collection System Projects to be Constructed between 2002 and 2012 • Improvement Proposed 2001 Constr. Inflated Cost at Time Number Description Constr.Date Cost of Constr. 8 Glade Road Sewer Extension 2004 $128,884 $144,977 11 Hilton Lift Station(Part II) 2004 $138,988 $156,343 11 Hilton 24-in.Force Main 2002 $1,908,637 $1,908,637 (completed) 13 Ball Street Parallel(Part II) 2007 $239,900 $303,550 17 SH 360 Sewer Extension 2004 $241,075 $271,177 I NW Area Sanitary Sewer 2002 $107,983 $107,983 (under constr.) J Opryland Lift Station and Force Main 2003 $1,296,214 $1,296,214 (under constr.) K Trencor Sewer Line 2003 $185,558 $185,558 (under constr.) L Hughes-TRA Collector 2004 $150,000 $168,730 New? Kimball Lift Station Improvements 2003 $233,823 $237,230 Grapevine WWTP Improvements 2008 $1,000,000 $1,265,319 TRA Central WWTP Improvements 2002 $537,320 TRA WF-1 WF-1 Inteceptor Relief 2002 $120,175 2002 Impact Fee Study 2002 $28,000 $28,000 TOTAL $6,731,211 Construction costs shown are the City of Grapevine participation costs. Costs for TRA projects are proportioned based on Grapevine's ultimate use of TRA capacity with improvements