Loading...
HomeMy WebLinkAboutCOMA2014-2890THE FOLLOMJNG IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT Construction Typ e: Permit Valuation: $ jyS Setbacks Approval to Issue Occupancy Group: Fire Sprinkler: YES O Front:z..s : Electrical Division: Building Depth: Left: Plumbing Zoning: C� Building Width: Rear: ; c - Mechanical Occupancy Load; Right: Z Plan Review Approval; Date: 7A2,W Building Permit Fee: Site Plan Approval: Fire Department: Date: yje— Date: 1te-1 Plan Review Fee: Lot Drainage Fee: Public Works Department: Date: Sewer Availability Rate: Health Department:` ate: Water Availability Rate: Approved for Permit: Date: l Total Fees: Lot Drainage Submitted: Approved: Total Amount Due: CITTOF GRAPEVINE MECHANICAL x ELECTRICAL PLUMBING ?m ju PERMIT #BLDG. I z1 -34,/ PERMIT# 1 COMA -14-2890 09/08/14 JOB ADDRESS: SUITE # 1501 Gaylord Trail, Building 2 - ICE Display DESCRIPTION OF WORK: Temporary AC System To System ICE Display PROPERTY OWNER: CONTRACTING COMPANY: Gaylord Texan Resort & CC SCG Mechanical, LP ADDRESS: ADDRESS: 1 Gaylord Drive 720 Industrial Drive, # 200 CITY/STATE/ZIP: CITY/STATE/ZIP: Nashville. TIN 37214-1207 Grapevine, TX 76051 PHONE NUMBER: PHONE NUMBER: (262) 237-7253 (972) 621-0001 TYPE OF OCCUPANCY BUILDING AREA OFT) PERMIT FEES AMOUNT DUE EACH TRADE I. R-3 1- 749 $ 33.25 SINGLE FAMILY, DUPLEX 750— 1,199 $ 49.88 TOWNHOUSE, 1,200- 1,500 $ 63.18 NEW CONSTRUCTION & 1,501 - 1,750 $ 76.48 ADDITIONS (PER UNIT) 1,751 - 2,000 $ 83.13 2,001 - 2,250 $ 89.78 TOTAL SQ.FOOT UNDER 2,251 - 3,000 $ 96.43 ROOF 3,001 - 3,500 $ 103.08 3,501 - 4,000 $ 109.73 $ 4,001 + $ 120.37 EACH TRADE 11. A, E, 1, R-1 1 - 500 $ 37.00 HOTELS, APARTMENTS, 501 — 100,000 $ 17.50+.035 PER DRINKING/DINING, 100,001 — 500,000 $ 3,500.00+.03 SQUARE EDUCATIONAL, ASSEMBLY, 500,001 + $15,000.00+.02 FOOT $ INSTITUTIONAL EACH TRADE 111. B, F, H, M, S, U 1- 500 $ 37.00 OFFICE, RETAIL, WHOLESALE, 501- 50,000 $ 32.00+.01 PER 1 GARAGES, FACTORIES, 50,001- 100,000 $ 182.00+ .007 SQUARE WORKSHOPS, SERVICE 100,001+ $ 582.00+.003 FOOT STATIONS, WAREHOUSE CONTRACT EACH TRADE IV. ANY OCCUPANCY GROUP VALUATION OF WORK FINISH -OUTS, SHELL COMPLETIONS, 0- 500 $ 37.00 ALTERATIONS OR 501- 1,500 $ 45.00 STAND ALONE PERMITS 1,501- 3,000 $ 57.00 CONTRACT VALUATION OF WORK: 3,001- 5,000 5,001- 50,000 50,001- 100,000 $ 72.00 $ 27.00+.009 $ 127.00+ .007 PER $ 175,000 100,001- 500,000 500,001+ $ 327.00+.005 DOLLAR $ 1,327.00+.003 IVALUATION 1,202.00 $ C� EACH TRADE V. MISCELLANEOUS IRRIGATION SYSTEMS $ 37.00 MOBILE HOME SERVICE $ 37.00 TEMPORARY POLE SERVICE $ 37.00 SWIMMING POOLS $ 37.00 SIGN ELECTRIC $ 37.00 0:\FORMS\DS APPLICATIONS - FEESWEP APPLICATION 4-1 i.doc • l l WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE OTHERWISE REQUIRED BY STATE LAW. OTHER INSPECTIONS AND FEES: • INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR* • REINSPECTION FEES.................................................................................................................. $42.00 • PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00 • INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR • ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO APPROVEDPLANS ............................................ ........................................................................... $42.00/HOUR • BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE • FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS** I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF GRAPEVINE. I RR T ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR OCAL REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS, AND T T VERIFICATION F ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST. Steve Breeding, President SIG URE OF CONTRACTOR OR AUTHORIZED AGENT PRINTED NAME (OR HOMEOWNER FOR HOMEOWNERS PERMITS) PHONE #: (972) 621-0001 EMAIL: *OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER. **ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS. CITY OF GRAPEVINE, BUILDING INSPECTIONS, P. O. BOX 95104, GRAPEVINE, TX 5/Zl/Ul HtVISLIJ: lU/Ul, 5/06, 2/01, 7107, 8/09, 11/09, 4/11 OAFORMS\DS APPLICATIONS - FEES\MEP APPLICATION 4-1l.doc (817) 410-3165 2014 ICF( Timelines updated by Chris 10 -Jul Not confirmed yet due to groups INDIVIDUAL PROPERTY SCHEDULES Texan: GET Start set-up of Cold Room Tent 1 -Au.. GET Electricity provided for work light, fans & power tools 4 -Au LS/Aggreko Cable trays, wire and pipes 8/4-8/6 Security Gaurding Cable and Equipment 8/5-8/7 GET Inspection for the floors and wires and 40 yards dumpster delivered and porta-potties 6 -Aug ARENA Crane 8 -Au GET Cold Room exhibit area flooring installed CLOSE FLOOR 7 -Au PSAV Beam clamps 11 -Au GET Cold Room wall insulation installed and roof panels 818-8/26 Aggreko Air handlers arrive on site 11 -Sep Aggreko Chillers arrive at site for set-up 19 -Sep Aggreko Begin set-up of refrigerating systems 22 -Sep GET Paint Cold Room floor black 31 -Au GET Floor paint in Cold Room dries (no activities in Cold Room)/ GET & ISA Storage Trailers arrive at site (request dock space) 1 -Sep LS Install high bas 1 -Sep GET/SWINGLIFT. _.Delivery Hotopp equipment for the floor request dock space) 1Sep:.. GET Duct install HOTOPP Paint ground plan on floor NO ONE ELSE IN TENT 9/2-9/3 ARENA AV tent/doors and ramps 3 -Se -PSAV Pre -Rig trusses for lighting & pie-rigof non -ice points '.9/4-9/10 MDM/Aggreko Install Scaffold/Air Handlers 9/8-9/12 PSAV Dimmers 8 -Sep GET' - Manroadsneartentandnstallbarracades/sto signs <1 -Oct.: Pick up of props for transfer HOTOPP Aerial props arrive 26 -Se PSAV' t:Rig aerial. props -:9127-9/28 -: FREEMAN Install drapes 18 -Sep GET/PSAV Utilities hooked to ISA offices & work rooms / rooms available with working phones, Internet, HVAC, power, and fax lines 30 -Sep ISA Associate Producer7Tech Director arrive at sites to set up office, review inventory, test equipment and prepare for arrival of artisans Advance Team 1 -Oct GET -ENG Apply heat tape to doors/ Weather stripping/ Drains for doors 10/1-10/7 LD Rough lighting focus 9/29-9130 GET Cold Room sealed for refrigeration cool to 55 degrees) 2 -Oct ARENA Seal Tent/ Eliminate Leaks/ Button down. for refrid eration 10/2-10/4 GET -ENG install ICE dump area and call for dum sters 1 -Oct ISA Advance teams arrive at sites 5 -Oct Security Start shifts 'at the tent 11pm7am confirm staff 9/29 6 -Oct' Aggreko Install air handlers for connector tent 10/8-1019 ENG Install fence around chillers 10/9-10/10 ISA/HOTOPP Artisan teams/HOTOPP art directors arrive to create attraction. 8 -Oct GET Welcome ISA artisans 9 -Oct ISA Call for 3 more dum sters 9 -Oct ISA Begin 33 days of continuous ice carving 9 -Oct ARENA Install Connector tent/ Curtains 10/12-10/14 LS Install exit/ emergency lighting in connector tent 14 -Oct PSAV Install AV in connector tent 16 -Oct FREEMAN Carpet lay down in connector tent 17 -Oct ARENA Install decorative fence on ramp and awning at exit 10/18-10!19 GET Preliminary Fire Marshall inspection 3 -Nov ISA ISA carpet lay down 9 -Nov LD Final lighting:focus 11/8-11!10 GET - fire Marshall inspection 7 -Nov ISA/GET/HOTOPP Walk through and sign -off of displays /Show Read 11 -Nov ISA Artisans depart and return to China 12 -Nov HOTOPP Art Directors depart 13 -Nov Media / video We GET STARS rail 13 -Nov GET STARS viewin 13 -Nov GET Media da NIP evenin reception 13 -Nov GET Publicoperation of attraction through 3 -Jan ISA Carpet and drape strike starts in evening 3 -Jan ISA Removal of ice and attraction -related expendables from Cold Room to an environmentaly approved location adjacent to the Cold Room as provided by GET 3 -Jan ISA Artisan maintenance team departs 12 -Jan GET Dry out Cold Room 11 -Jan GET Shut down operation as Cold Room. Removal of refrigeration equipment 1 112-1113 Hotopp striking of overhead props / rigging 11 -Jan GET Take down of clear span structure and insulated Cold Room 12 -Jan ISA Final area cleanup and project conclusion/Associate Producers depart 14 -Jan GET Melting Period ! Ice Debris Clean Up Max. 50 days to melt ice?) updated by Chris 10 -Jul Not confirmed yet due to groups