HomeMy WebLinkAboutCOMA2014-2890THE FOLLOMJNG IS TO BE COMPLETED BY THE BUILDING INSPECTION DEPARTMENT
Construction Typ e:
Permit Valuation: $ jyS
Setbacks
Approval to Issue
Occupancy Group:
Fire Sprinkler: YES O
Front:z..s :
Electrical
Division:
Building Depth:
Left:
Plumbing
Zoning: C�
Building Width:
Rear: ; c -
Mechanical
Occupancy Load;
Right: Z
Plan Review Approval;
Date: 7A2,W
Building Permit Fee:
Site Plan Approval:
Fire Department:
Date:
yje— Date: 1te-1
Plan Review Fee:
Lot Drainage Fee:
Public Works Department:
Date:
Sewer Availability Rate:
Health Department:`
ate:
Water Availability Rate:
Approved for Permit:
Date: l
Total Fees:
Lot Drainage Submitted:
Approved:
Total Amount Due:
CITTOF GRAPEVINE
MECHANICAL x ELECTRICAL PLUMBING
?m
ju
PERMIT #BLDG.
I z1 -34,/
PERMIT#
1
COMA -14-2890
09/08/14
JOB ADDRESS: SUITE #
1501 Gaylord Trail, Building 2 - ICE Display
DESCRIPTION OF WORK:
Temporary AC System To System ICE Display
PROPERTY OWNER:
CONTRACTING COMPANY:
Gaylord Texan Resort & CC
SCG Mechanical, LP
ADDRESS:
ADDRESS:
1 Gaylord Drive
720 Industrial Drive, # 200
CITY/STATE/ZIP:
CITY/STATE/ZIP:
Nashville. TIN 37214-1207
Grapevine, TX 76051
PHONE NUMBER:
PHONE NUMBER:
(262) 237-7253
(972) 621-0001
TYPE OF OCCUPANCY
BUILDING AREA
OFT)
PERMIT FEES
AMOUNT DUE
EACH TRADE
I. R-3
1- 749
$ 33.25
SINGLE FAMILY, DUPLEX
750— 1,199
$ 49.88
TOWNHOUSE,
1,200- 1,500
$ 63.18
NEW CONSTRUCTION &
1,501 - 1,750
$ 76.48
ADDITIONS (PER UNIT)
1,751 - 2,000
$ 83.13
2,001 - 2,250
$ 89.78
TOTAL SQ.FOOT UNDER
2,251 - 3,000
$ 96.43
ROOF
3,001 - 3,500
$ 103.08
3,501 - 4,000
$ 109.73
$
4,001 +
$ 120.37
EACH TRADE
11. A, E, 1, R-1
1 - 500
$ 37.00
HOTELS, APARTMENTS,
501 — 100,000
$ 17.50+.035 PER
DRINKING/DINING,
100,001 — 500,000
$ 3,500.00+.03 SQUARE
EDUCATIONAL, ASSEMBLY,
500,001 +
$15,000.00+.02 FOOT
$
INSTITUTIONAL
EACH TRADE
111. B, F, H, M, S, U
1- 500
$ 37.00
OFFICE, RETAIL, WHOLESALE,
501- 50,000
$ 32.00+.01 PER
1
GARAGES, FACTORIES,
50,001- 100,000
$ 182.00+ .007 SQUARE
WORKSHOPS, SERVICE
100,001+
$ 582.00+.003 FOOT
STATIONS, WAREHOUSE
CONTRACT
EACH TRADE
IV. ANY OCCUPANCY GROUP
VALUATION OF
WORK
FINISH -OUTS,
SHELL COMPLETIONS,
0- 500
$ 37.00
ALTERATIONS OR
501- 1,500
$ 45.00
STAND ALONE PERMITS
1,501- 3,000
$ 57.00
CONTRACT VALUATION OF WORK:
3,001- 5,000
5,001- 50,000
50,001- 100,000
$ 72.00
$ 27.00+.009
$ 127.00+ .007 PER
$ 175,000
100,001- 500,000
500,001+
$ 327.00+.005 DOLLAR
$ 1,327.00+.003 IVALUATION
1,202.00
$ C�
EACH TRADE
V. MISCELLANEOUS
IRRIGATION SYSTEMS
$ 37.00
MOBILE HOME SERVICE
$ 37.00
TEMPORARY POLE SERVICE
$ 37.00
SWIMMING POOLS
$ 37.00
SIGN ELECTRIC
$ 37.00
0:\FORMS\DS APPLICATIONS - FEESWEP APPLICATION 4-1 i.doc
• l l
WHEN PLANS ARE REQUIRED BY CODES, ORDINANCES, OR AS DETERMINED BY THE BUILDING
OFFICIAL, THREE (3) SETS OF PLANS SHALL BE SUBMITTED IN HARD COPY FORMAT. ENGINEER SEALED
PLANS AND CALCULATIONS SHALL BE SUBMITTED AS REQUIRED BY CODES, ORDINANCES OR WHERE
OTHERWISE REQUIRED BY STATE LAW.
OTHER INSPECTIONS AND FEES:
• INSPECTIONS OUTSIDE NORMAL BUSINESS HOURS (2HR MINIMUM)...............................................$42.00/HOUR*
• REINSPECTION FEES.................................................................................................................. $42.00
• PERMITS FOR WHICH NO FEE IS SPECIFICALLY INDICATED........................................................... $37.00
• INSPECTIONS FOR WHICH NO FEE IS SPECIFICALLY INDICATED (1/2 HOUR MINIMUM)......................$42.00/HOUR
• ADDITIONAL PLAN REVIEW REQUIRED BY CHANGES, ADDITIONS, OR REVISIONS TO
APPROVEDPLANS ............................................ ........................................................................... $42.00/HOUR
• BUILDING PERMIT FEES FOR THE GRAPEVINE-COLLEYVILLE INDEPENDENT SCHOOL DISTRICT
SHALL BE 25% OF THE FEES ESTABLISHED IN THIS TABLE
• FOR USE OF OUTSIDE CONSULTANTS FOR PLAN CHECKING AND INSPECTIONS, OR BOTH......... ACTUAL COSTS**
I HEREBY CERTIFY THAT THE FOREGOING IS CORRECT TO THE BEST OF MY KNOWLEDGE AND ALL WORK WILL BE
PERFORMED ACCORDING TO THE DOCUMENTS APPROVED BY THE BUILDING DEPARTMENT AND IN COMPLIANCE
WITH THE CITY OF GRAPEVINE CODES REGULATING CONSTRUCTION. IT IS UNDERSTOOD THAT THE ISSUANCE OF
THIS PERMIT DOES NOT GRANT OR AUTHORIZE ANY VIOLATION OF ANY CODE OR ORDINANCE OF THE CITY OF
GRAPEVINE.
I RR T ALL WORK THAT IS REQUIRED TO COMPLY WITH ANY FEDERAL, STATE, AND / OR
OCAL REGARDING ENERGY CONSERVATION WILL BE PERFORMED IN ACCORDANCE WITH THOSE LAWS,
AND T T VERIFICATION F ENERGY CODE COMPLIANCE SHALL BE SUBMITTED TO THE CITY UPON REQUEST.
Steve Breeding, President
SIG URE OF CONTRACTOR OR AUTHORIZED AGENT PRINTED NAME
(OR HOMEOWNER FOR HOMEOWNERS PERMITS)
PHONE #: (972) 621-0001
EMAIL:
*OR THE TOTAL HOURLY COST TO THE JURISDICTION WHICHEVER IS GREATER.
**ACTUAL COSTS INCLUDE ADMINISTRATIVE AND OVERHEAD COSTS.
CITY OF GRAPEVINE, BUILDING INSPECTIONS, P. O. BOX 95104, GRAPEVINE, TX
5/Zl/Ul HtVISLIJ: lU/Ul, 5/06, 2/01, 7107, 8/09, 11/09, 4/11
OAFORMS\DS APPLICATIONS - FEES\MEP APPLICATION 4-1l.doc
(817) 410-3165
2014 ICF( Timelines
updated by Chris
10 -Jul
Not confirmed yet due to groups
INDIVIDUAL PROPERTY SCHEDULES
Texan:
GET
Start set-up of Cold Room Tent
1 -Au..
GET
Electricity provided for work light, fans & power tools
4 -Au
LS/Aggreko
Cable trays, wire and pipes
8/4-8/6
Security
Gaurding Cable and Equipment
8/5-8/7
GET
Inspection for the floors and wires and 40 yards dumpster delivered
and porta-potties
6 -Aug
ARENA
Crane
8 -Au
GET
Cold Room exhibit area flooring installed CLOSE FLOOR
7 -Au
PSAV
Beam clamps
11 -Au
GET
Cold Room wall insulation installed and roof panels
818-8/26
Aggreko
Air handlers arrive on site
11 -Sep
Aggreko
Chillers arrive at site for set-up
19 -Sep
Aggreko
Begin set-up of refrigerating systems
22 -Sep
GET
Paint Cold Room floor black
31 -Au
GET
Floor paint in Cold Room dries (no activities in Cold Room)/
GET & ISA Storage Trailers arrive at site (request dock space)
1 -Sep
LS
Install high bas
1 -Sep
GET/SWINGLIFT.
_.Delivery Hotopp equipment for the floor request dock space)
1Sep:..
GET
Duct install
HOTOPP
Paint ground plan on floor NO ONE ELSE IN TENT
9/2-9/3
ARENA
AV tent/doors and ramps
3 -Se
-PSAV
Pre -Rig trusses for lighting & pie-rigof non -ice points
'.9/4-9/10
MDM/Aggreko
Install Scaffold/Air Handlers
9/8-9/12
PSAV
Dimmers
8 -Sep
GET'
- Manroadsneartentandnstallbarracades/sto signs
<1 -Oct.:
Pick up of props for transfer
HOTOPP
Aerial props arrive
26 -Se
PSAV'
t:Rig aerial. props
-:9127-9/28 -:
FREEMAN
Install drapes
18 -Sep
GET/PSAV
Utilities hooked to ISA offices & work rooms / rooms available with
working phones, Internet, HVAC, power, and fax lines
30 -Sep
ISA
Associate Producer7Tech Director arrive at sites to set up office, review
inventory, test equipment and prepare for arrival of artisans Advance
Team
1 -Oct
GET -ENG
Apply heat tape to doors/ Weather stripping/ Drains for doors
10/1-10/7
LD
Rough lighting focus
9/29-9130
GET
Cold Room sealed for refrigeration cool to 55 degrees)
2 -Oct
ARENA
Seal Tent/ Eliminate Leaks/ Button down. for refrid eration
10/2-10/4
GET -ENG
install ICE dump area and call for dum sters
1 -Oct
ISA
Advance teams arrive at sites
5 -Oct
Security
Start shifts 'at the tent 11pm7am confirm staff 9/29
6 -Oct'
Aggreko
Install air handlers for connector tent
10/8-1019
ENG
Install fence around chillers
10/9-10/10
ISA/HOTOPP
Artisan teams/HOTOPP art directors arrive to create attraction.
8 -Oct
GET
Welcome ISA artisans
9 -Oct
ISA
Call for 3 more dum sters
9 -Oct
ISA
Begin 33 days of continuous ice carving
9 -Oct
ARENA
Install Connector tent/ Curtains
10/12-10/14
LS
Install exit/ emergency lighting in connector tent
14 -Oct
PSAV
Install AV in connector tent
16 -Oct
FREEMAN
Carpet lay down in connector tent
17 -Oct
ARENA
Install decorative fence on ramp and awning at exit
10/18-10!19
GET
Preliminary Fire Marshall inspection
3 -Nov
ISA
ISA carpet lay down
9 -Nov
LD
Final lighting:focus
11/8-11!10
GET -
fire Marshall inspection
7 -Nov
ISA/GET/HOTOPP
Walk through and sign -off of displays /Show Read
11 -Nov
ISA
Artisans depart and return to China
12 -Nov
HOTOPP
Art Directors depart
13 -Nov
Media / video
We
GET
STARS rail
13 -Nov
GET
STARS viewin
13 -Nov
GET
Media da NIP evenin reception
13 -Nov
GET
Publicoperation of attraction through
3 -Jan
ISA
Carpet and drape strike starts in evening
3 -Jan
ISA
Removal of ice and attraction -related expendables from Cold Room to
an environmentaly approved location adjacent to the Cold Room as
provided by GET
3 -Jan
ISA
Artisan maintenance team departs
12 -Jan
GET
Dry out Cold Room
11 -Jan
GET
Shut down operation as Cold Room. Removal of refrigeration
equipment
1
112-1113
Hotopp
striking of overhead props / rigging
11 -Jan
GET
Take down of clear span structure and insulated Cold Room
12 -Jan
ISA
Final area cleanup and project conclusion/Associate Producers depart
14 -Jan
GET
Melting Period ! Ice Debris Clean Up Max. 50 days to melt ice?)
updated by Chris
10 -Jul
Not confirmed yet due to groups