Loading...
HomeMy WebLinkAboutItem 09 - Sanitary Sewer ReplacementMEMO TO: FROM: MEETING DATE: SUBJECT: RECOMMENDATION i ° ° °'I "EIIIM ft HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BRUNO RUMBELOW, CITY MANAGER JUNE 7, 2011 SANITARY SEWER REPLACEMENT, PHASE 2 CONSTRUCTION PROJECT AWARD OF CONTRACT City Council consider approving the Sanitary Sewer Replacement, Phase 2 construction contractto Horseshoe Construction, Inc. in an amountof $1,729,398.00, authorize staff to execute said contract and take any necessary action. FUNDING: Funds are programmed for this project in 96, 97 and 01 Utility Bonds BACKGROUND: The project will replace existing sanitary sewer lines in the Lakeview /Lakeridge Drive area, north of Kimball. Five bids were received on May 3, 2011. Horseshoe Construction, Inc. was the low bidder at $1,729,398.00. Bids were as follows: Horseshoe Construction $ 1,729.398.00 UtiliTex — Civil Utilities $ 1,844,769.30 Hall Albert Construction $ 1,870,477.20 PM Construction $ 2,088,247.58 Circle C Construction $ 2,306,139.00 The construction will be primarily trenchless construction where the existing lines will be burst in place and simultaneously replaced with a new line. New sewer services and cleanouts will be installed for residents served by the lines in these areas. Manholes and cleanouts for the sewer will be replaced or rehabilitated. A sewer aerial crossing is also to be replaced with this project Horseshoe Construction Inc. is qualified to perform this type of work and references were positive. Staff recommends approval. RAAGENDA12011k06 -07- 1111 &1 ph2 Constr Award.doc 11117 Shady Trail j Dallas, TX 752291972.620.1255 May 5, 2011 John Robertson, P.E. City of Grapevine P.O. Box 95104 Grapevine, TX 76099 Re: 2009 Sanitary Sewer Replacements — Phase 2 Dear Mr. Robertson: The following bids were received for the above referenced project on May 3, 2011: TOTAL BID AMOUNT 1. Horseshoe Construction $1,729,398.00 2. UtiliTex — Civil Utilities $1,844,769.30 3. Hall Albert Construction $1,870,477.20 4. PM Construction $2,088,247.58 5 Circle C Construction $2,306,139.00 The Engineer's Estimate was $2,300,000 with no contingency added. Horseshoe Construction has submitted a experience record with references for those particular projects. Most of the experience they reported was from the Houston area. I contacted two of the local cities that Horseshoe has had projects with recently: City of Keller, Chad Bartee, PE. Chad said that Horseshoe is working on several projects as part of a maintenance contract. He said they do good work, very responsive to the City and to residents, kept project areas clean and were easy to work with. City of Mesquite, Jim Palmer, PE. Jim said he had recently completed three separate contracts with Horseshoe and he would welcome them to bid more projects. He said they were easy to work with and responsive. Although Burgess & Niple has not completed a pipe bursting project recently with Horseshoe, we find no reason based on the references we contacted that would disqualify Horseshoe from being awarded the project. Therefore, we recommend that Horseshoe Construction be awarded this project. If you have any questions concerning the contract recommendation, please call. Sincerely, Burgess & Niple, Inc. Lowell D. DeGroot, P.E. Senior Project Manager Enclosure: Bid Tab, reference list