MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER,
MEETING DATE: JUNE 7, 2011
SUBJECT: EULESS GRAPEVINE ROAD/STONE MYERS PARKWAY
ENGINEERING SERVICES AMENDMENT
RECOMMENDATION
City Council consider approving an amendment to the Engineering Services Contract with
AECOM in an amount of $22,410 for the design of sidewalk and street lights on Stone
Myers Parkway from Prospect Parkway to State Highway 360, authorize staff to execute
said agreement and take any necessary action.
FUNDING-
Funds are programmed for Euless Grapevine Road /Stone Myers Parkway from OOA GO
Bonds, Acct # 178- 78106 -012.
BACKGROUND:
Staff has proposed to the NCTCOG and TxDOT Staff that we add sidewalks and street
lights to this project for the segment of Stone Myers Parkway that existed prior to this
project. Both COG & TxDOT staff have agreed to our proposal and the RTC has approved
the funding for this addition.
The sidewalk and street lights will extend from Prospect Parkway to State Highway 360
and will connect with Big Bear Creek Trail on the east side of State Highway 360.
Staff recommends approval.
RAAGENDA12011\06- 07- 111Euless Gpv - SNIP Engr Contract Amendment.doc
AZCOMAECOM
1200 Summit Avenue
Suite 600
Fort Worth, Texas
76102
www.aecom.com
April 22, 2011
John Robertson, PE
City of Grapevine
200 South Main Street
Grapevine, TX 76051
Subject: Euless- Grapevine Road, Supplemental Agreement Number 5
Dear Mr. Robertson:
817 69B 6700 tel
817 698 6701 fax
AECOM has prepared a Supplemental Agreement No. 5 to provide design plans for a sidewalk and
illumination along the west side of Stone Myers between Prospect Parkway and Big Bear Creek Trail.
The supplemental agreement, which summarizes the revisions to the scope and the proposed fee to
accomplish this work, is attached.
After execution of this Supplemental Agreement No. 5, the Engineering Services Contract between the
City of Grapevine and AECOM Technical Services, Inc. for the Euless- Grapevine Road Project will be
modified as follows:
The Engineering Services Contract is revised to increase the compensation from $761,354 to
$783,764, an increase of $22,410. This increase in compensation is requested due to
additions to the Scope of Services as described in Exhibit 1A and Exhibit 1 B — Task and t=ee
Estimate. Exhibit IC shows the billing rates to be used with this supplemental agreement.
Compensation for these services will be in accordance with the original Engineering Services
Agreement dated November 12, 2002, Section 5.2 — Engineer's Liability.
All other terms and conditions of the Engineering Services Agreement dated November 12, 2002 are
unchanged and remain in full force and effect.
AECOM Technical Services, Inc.
By:
Don D'Adam
Vice President
City of Grapevine
By:
Date: Date:
Matt Singleton
Director of Public Works
EXHIBIT 1A
SUPPLEMENTAL AGREEMENT NO. 5
SCOPE OF SERVICES
EULESS -GRAPEVINE ROAD
PAVING AND DRAINAGE
April 22, 2011
0.0 GENERAL
0.1 Project Description
The services to be provided for this project under this Supplemental Agreement No. 5
are as follows. These items are in addition to the original paving and drainage contract
Scope of Services, the bid phase and construction phase services to be provided
under the 12 -inch waterline contract Scope of Services, and the Supplemental
Agreement No. 1, No. 2, No. 3 and No. 4 Scope of Services. This supplemental is
divided into Basic Services and Exclusions.
This scope shall be invoiced and paid for on a lump sum basis for all items except
1.1.g
BASIC SERVICES
1.0 Basic.Services — Final Engineering for Sidewalk Plans and Illumination Plans.
AECOM will provide design plans for approximately 2,500 linear feet of 1; -ft wide sidewalk
along the west side of Stone Myers Parkway that extends from Prospect Parkway to the Big
Bear Creek Trail. Crosswalks will be provided at Stone Myers t=B & WB and SH 360 Service
Roads NB & SB. Access ramps will be placed at intersections in accordance with ADA
compliance. ADA review by TDLR is required and will also be a component of this phase.
AECOM will also prepare illumination plans including foundations, poles, conduit, and wiring,
connecting the poles to a power source in accordance with TxDOT standards. The
foundations and conduit will be installed on the along the back side of the proposed sidewalk
from Prospect Parkway to SH -360. No illumination will be installed west of SH -360.
AECOM will conduct complete internal QA/QC reviews prior to submittal. Grapevine, TxDOT
and TDLR review comments will be integrated into the design for final plans_
This phase is further broken out into individual tasks:
1.1 Final Plans Submittal
a. Site Survey will be performed and will indentify surface features of the project
area (see Attachment A). The survey limits will be:
• Between back of existing curb to approximately 20 ft from the curb,
along the proposed alignment along Stone Myers Parkway.
• Stone Myers Parkway Intersection at SH 360 service road as required
for crosswalk.
• Between existing curbs of Stone Myers Parkway and SH 360 service
road turnaround at overpass.
City of Grapevine -- Exhibit A 4/22/2011
Euless- Grapevine Road Page 1 of 2
b. Typical Section Sheets will be provided to show sidewalk adjacent to existing
roadway.
c. Sidewalk Plan sheets will be prepared and will show the sidewalk along the
west side of Stone Myers Parkway, including any needed access ramps or
hand rail. The sidewalk plans will include existing roadway and features
according to survey_ Only the plan view will be shown, and it will be double
banked. It is anticipated that 6 plan sheets will be required for the project.
Half -size sheets will be produced at 1" = 40' scale. Sidewalk plans will be
prepared in accordance with TxDOT specifications.
d. AECOM will locate conduit, wiring, foundations, and poles for illumination
along the alignment of the project to TxDOT standards, including voltage drop
calculations. These items will be shown on separate plan sheets. It is
anticipated that three (3) single banked plan sheets will be required at 1"
100' scale.
e. Quantities will be prepared for the sidewalk, ramps, handrail, illumination, and
associated items. Ancillary quantities may be needed due to the placement of
the sidewalk. These quantities include the soil retention blanket, top soil,
vegetative watering, and seeding.
f. Submit final plans to TxDOT and Grapevine. AECOM will then meet with
TxDOT/Grapevine, review comments, address comments, and resubmit the
plans. This task is limited to one meeting.
g. Submit Plans to TDLR for ADA review and approval. This item shall be
invoiced as a time and material item.
. Provide QAIQC for preparation of plans and quantities.
2.0 EXCLUSIONS
The scope of this agreement includes only the services listed above. Services specifically
excluded from this scope of services include, but are not limited to, the following items:
• Design for trench safety
• Geotechnical investigations, coordination with geotechnical firm, and materials
testing
• Construction inspection services
• Construction progress tracking or report
• Utility location verification
• Monthly coordination meeting with contractor(s), inspection personnel or City
representatives
• Review of Contractor's monthly progress report or request for payment
• Performance of public involvement activities
• Environmental work of any type
• DFW approval /review
City of Grapevine — Exhibit A 412212011
Euless- Grapevine Road Page 2 of 2
m O
00
a
�
-
-14r.
T--
-
0
r
°•
d
�
a
win
W
J E
0
d
_
3
C
d
E
V
- -----
Ell
� N
®
0
LL
a
J
NUn4eesw�
N
Q
[V
w
m
®
t
°3
ao
csF
O
of a
d'rrNYmv
x
N
S'
D
O
� �
r O
O r
V r
m
�
d
po
O
�
C
Q
r
Ci
CJ
LL
d
a
n
Yn
a
Ew
o
b
m
c
m
LL
�
e 11
�
d U, C
z¢
® z
d
n C�
w
'D
z
m
��
®m
®
c
0.' W
c
m
a
h m
um
Q X a
a ®
c
c
F- $7
LU m
Y
n tin $
a
w
E5
fir°
F-��
r
=a
cne
�mfn
a°0ap
a
a
�,�nvaTw
c
m
N
m
3
3
Y
n
a
N
Q
N
C
E
c
E
4