HomeMy WebLinkAboutCA2022-19A Future With A Past
12 April 2022
Ida Norris
224 Ruth Street
Grapevine, Texas 76051
817-975-7734
RE: HISTORIC PRESERVATION COMMISSION
CERTIFICATE OF APPROPRIATENESS #CA22-19
G. L. HUNT FOUNDATION REPAIR COMPANY
D. E. BOX ADDITION HISTORIC DISTRICT, #HL10-09, ORDINANCE #2011-58
224 RUTH STREET
GRAPEVINE, TEXAS 76051
This letter confirms on April 12, 2022 the Historic Preservation Staff approved with
conditions #CA22-19 for the property addressed 224 Ruth Street, legally described as Block
1, Lot 4, D. E. Box Addition, City of Grapevine to the Grapevine Historic Preservation
Ordinance 91-73 (Appendix G — Grapevine Code of Ordinances), as amended, for the
following:
1. Contractor to excavate the crawl space under existing pier and beam foundation and
make necessary repairs to the footings, piers and beams as needed;
as per the attached plan, photos and specifications with the condition a permit be obtained
from the Building Department.
An approved Certificate of Appropriateness is not an approved building permit; a
building permit is / is not required. Contact the City of Grapevine's Building
Department at 817.410.3165 for fees and information regarding permits.
Thank you,
"b
Gi-fV k
David Klempin
Historic Preservation Officer
wdk
THE CITY OF GRAPEVINE
HISTORIC PRESERVATION • 636 South Main Street • Grapevine, Texas • 76051 • Phone 817/410-3197
Fax Number 817/410-3125
CERTIFICATE OF APPROPRIATENESS APPLICATION
Property Owner Name, Address & Phone Number F—Applicant Name, Address & Phone Number
700 I - / S I'1
Phone: . / () )
Mobile
,
Legal Descri tion
Block I Lot
Drawings/Sketches Attached r
Photographs Attached
Yes o No %J Current o Historic
Material Sample(s) Attached lease list L
1 hereby certify that this information is correct to the best of my knowledge and that the said work will be done in conformance
with all submissions herein set forth, and in compliance with the City of Grapevine's Historic Overlay District Ordinances and
Building Codes. APPROVAL OF A CERTIFICATE OF APPROPRIATENESS DOES NOT CONSTITUTE APPROVAL OF
OTHER REQUIRED BUILDING PERMITS.
ai
Si ned x % Print Name �J (5 22r 5
f Owner or Contractor
Office Use
o Approve Approved with Conditions:
Staff
HPC ��2 ►y r r2b-s�
o Denied
x x Aj 6ilj —L'42a��
Chair — Historic Preservation Commission Histor c Preservation giffice,
x Date C� 2-, Z
Building Official
THIS IS NOT A BUILDING PERMIT.
A SEPARATE BUILDING PERMIT MUST BE FILED AND APPROVED BY
THE BUILDING DEPARTMENT BEFORE STARTING WORK.
DELIVER TO: HISTORIC PRESERVATION DEPARTMENT
636 SOUTH MAIN STREET, GRAPEVINE, TEXAS
APR 0 7 2022
oq-
14
MI.
A<:�A z7--r5
0
z
0
Y
U
N
0
0
LV
r
Y
• H
'^
N
Z
T
'^N`
W
J
>
Vf �/Y�
trnn•
aU
to �
v
O
U2
z�
a
>
>
i
a
c
C
O
0
m
a_
r
0
U
L
=
1"')
L=
m
tMWC
THOMAS
--- CONSULTANTS -----
Date: March 28, 2022
Attention: GL Hunt Foundation Repair
Subject: Initial Foundation Repair Consultation Report
P&B Foundation
224 Ruth Street Grapevine, TX 76051
Good Afternoon:
}Zj Cj
601 Corry A Edwards Driv
Kennedale, Texas 76060
info@tecdfw.com
(817)576-1973
Texas Registered Engineering Firm F-15336
APR iQ 2022
Thomas Engineering Consultants (TEC) was retained to conduct a review of the limited foundation repair plan
prepared by GL Foundation Repair (the contractor) to determine, in our opinion, if the recommended remediation
plan is a reasonable plan of repair based on the relative elevation map provided.
The contractor provided a limited repair plan that included the pier locations and pre -lift elevations for the
structure for our review. No other information was provided regarding prior engineering reports,
recommendations for foundation repairs or construction documents relative to this structure. If existing piers are
shown in the limited repair plan, their locations were provided by the client and are approximated — we do not
certify their performance or existence. If the reader would like to determine if they are present, they must contact
the owner or contractor to obtain an engineering certificate for them. TEC has not performed a visual inspection
of the subject structure.
The foundation system has settled towards the areas where piers are located on the limited repair plan and
physical damage is present which indicates a need for remedial measures according to the contractor. GL Hunt
Foundation Repair has included the following items in their recommended limited repair plan:
• Excavate crawlspace soils to access substructure for further evaluation. Upon further evaluation,
additional work to substructure may become necessary.
The foundation repairs are to meet or exceed 2015 IRC. Upon review of the elevation drawing and based on the
contractor's evaluation of the property, we believe the proposed limited repair plan to be a reasonable and limited
repair.
Expectations and Additional Recommendations:
This report provides our reasonable professional opinion of the condition of the foundation on the date of the
inspection by the contractor and is based on the data provided to us and does not take into consideration any
changes in the condition of the foundation or soils after that date. The contents of this report supersede any
verbal comments made regarding the structure before, during or after the inspection. Although document review
is an integral part of the foundation repair process, we recommend obtaining a visual inspection by a licensed
engineer. TEC can complete this visual inspection for an additional fee.
Thomas Engineering Consultants
Page 2 of 6
Property Address: 224 Ruth Street Grapevine, TX 76051
This limited repair plan is intended to provide a reasonable repair to improve the performance of the foundation
and is not intended to level the foundation. The contractor shall determine the amount of elevation correction
needed based on the reaction of the structure during the lift in order to minimize damages and additional stress.
Because the structure has endured pre -repair foundation differential movement, residual differential elevation and
perceptible floor slope or other noticeable issues may remain following the foundation repairs. Damage to the
structure may arise during the foundation repair installation activities. We recommend pre -lift and post -lift
plumbing tests be performed on the sewer and potable plumbing lines. Any leak found shall be repaired
immediately.
The soils beneath and surrounding the structure are known to shrink and swell as the seasonal soil moisture
content fluctuates. Moving forward, we anticipate that some cracks in the interior and exterior walls will surface
due to seasonal movement within the soils, even after foundation repair. Periodic repair of this type of cracking
may be needed.
A foundation and yard watering and foundation maintenance program will help control seasonal movement. It is
important that the soils be stabilized and maintained with grass or ground cover around the perimeter of the
structure. In addition, tree and shrub removal or root barrier installations are advisable if trees or bushes are
observed to be close to the foundation. Tree roots can cause "heave" or settlement of the foundation where roots
grow and absorb moisture over time when planted close to the foundation (tree roots extend approximately as far
or further than tree limbs).
Maintaining the soils around the structure to slope away from the foundation to prevent excessive ponding near
the foundation in areas that are not already sloping away will help prevent future foundation movement. We
recommend that a full gutter system with gutter extensions be maintained to discharge a minimum of 4 feet from
the foundation (not in landscaped flower beds or any other location that will trap water near the foundation).
Ponding near the foundation can cause "heaving" (upward movement of the foundation), settlement of the
foundation due to overly saturated clays soil or erosion of soil embedment around the foundation.
If the owner, at any time, observes standing water near the foundation, we recommend that they consult with an
engineer or a drainage contractor immediately.
Disclaimer:
We do not warrant the future performance of the subject foundation and the reader is urged to review the
Disclosure & Disclaimer for other limitations and standard recommendations. The limit of liability is limited to the
fee paid for this opinion. No further agreement shall be made, altered, or varied except by written instrument.
This report has been completed to document the repairs to be implemented by the contractor. Neither Thomas
Engineering Consultants nor Thomas A LaLonde, Jr, P.E., are responsible for liability to the owner or others for
acts or omissions of the contractor to carry out the repairs in accordance with their agreement or for the
construction means, methods, techniques, sequences, procedures or the safety precautions incident thereto. The
contractor is solely responsible for the warranty of the work they performed in accordance with their agreement.
Please see the pier specifications and limited repair plan for more information.
LrOO
07 2022
V;APR
j�:`is
Thomas Engineering Consultants
Page 3 of 6
Property Address: 224 Ruth Street Grapevine, TX 76051
Very truly yours, sysP�EOFTFxgs�11
................................
/ TH°MAS A. LeLON... JR.
Thomas A. LaLonde, Jr., P.E., M.ASCE /leg; 11172 Q
y°T•. <•c se�.••�a��
Registered Professional Engineer s....... oi�
State of Texas #93572
3/28/202�
APR Q 7 2022
By
Thomas Engineering Consultants
{ C442z-II
Page 4 of 6
Property Address: 224 Ruth Street Grapevine, TX 76051
DISCLOSURE & DISCLAIMER:
It is known to knowledgeable professional engineers that the soils in this area are subject to movement due
to expansion, contraction or densification of the soils etc. This soil movement could possibly cause the
foundation to move after the remediation plan within the attached report has been implemented and may
impact the stability of the foundation and cause damage. NO WARRANTY IS EXPRESSED OR IMPLIED
BY THIS ENGINEER AS TO THE PERFORMANCE OF THIS FOUNDATION OR THE REPAIRS
THERETO. Diligent foundation maintenance to maintain consistent soil conditions along the perimeter
should reduce further problems after the recommendations within this report have been implemented.
However, seasonal moisture variations, water leaks, erosion and other factors may affect the stability of the
foundation and put it in danger of further damage.
REPORT LIMITATIONS:
This report is written for informational purposes only and is not intended to be a detailed technical evaluation
of the property or an inventory of defects. The opinions expressed in this report are based on a visual
evaluation of current conditions observed at the time of the inspection. THERE IS NO WARRANTY,
EXPRESSED OR IMPLIED, CONCERNING THIS ENGINEERING REPORT.
The information in this report supersedes any verbal comments, expressed or implied, made by Thomas
Engineering Consultants or its principals, agents or employees. The client agrees that neither TEC nor its
employees or owners will be responsible for:
1. Knowledge of the subsurface conditions without extensive geotechnical data obtained from onsite
drilling and testing of the recovered samples,
2. Knowledge of cracks, vertical differential displacement of floors without uncovering of the floor by the
client; and
3. Any other element such as joists or beams and other structural members that is boxed or otherwise
not readily available to TEC for viewing, and releases TEC from any liability attributable to such
knowledge or conditions.
Any prescribed repair or maintenance plan detailed by this report is based on observations of apparent
performance of the structure at the time of this assessment. Compliance with any code or specification
other than as expressly noted is specifically excluded.
The provided Relative Floor Elevation Survey and resulting recommendations are based on conditions as
they now exist and DOES NOT IMPLY OR WARRANT THAT OTHER PROBLEMS AND OR AREAS MAY
NOT MANIFEST IN THE FUTURE. This report was prepared expressly for the client and expressly for the
purposes indicated by the client. Permission for use by any other person for any purpose, or by the client for
different purpose is denied unless otherwise stated in writing by TEC.
TEC SHALL HAVE NO LIABILITY FOR ACTS OR OMISSIONS BY THE CONTRACTOR OR HIS
SUBCONTRACTORS PERFORMING WORK ON THIS PROJECT, OR THE FAILURE OF THE
CONTRACTOR TO PERFORM THE WORK IN ACCORDANCE WITH THE REPAIR PLAN. TEC IS NOT
RESPONSIBLE FOR THE CONSTRUCTION MEANS, METH-ODS, TECHNIQUES, SEQUENCE OR
PROCEDURES OR THE PRECAUTIONS INCIDENTAL THERETO.
TEC expressly DISCLAIMS ANY WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE and the
client expressly disclaims that it has contracted for or received any warranty of fitness for a particular
purpose with respect to this report. THE REPORT UNDER THIS AGREEMENT IS THE OPINION OF TEC
AND THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON TFff
�� n
THIS AGREEMENT.
T T
APR 0 7 2022
.' /S`
Thomas Engineering Consultants
Chzz•-��
Page 5 of 6
Property Address: 224 Ruth Street Grapevine, TX 76051
GL Hunt — Limited Repair Plan
Add On Shed
J
Covered Patio R�waaled o c� Is Our"
-2.9 n Slab Structure Add On
1.4 0. 2 0.
A 1.5
-0.8
-0. .9
43
- -1. -0.5 0.1
4
a.0
_
pns►asamd -- —" _
0.6 _ _ -0.2
- .6 -0.3 40
G.L.Hunt
JUSTIN BRITS
JUSTINGGLHUNT.COM
Ida Norris
darlahelms@verizon.net
Project
Ruth Street Structural Correction
APR 0 7 2022
By'
Please Note:
This drawing is provided for preliminary permitting purposes only and is a limited plan of repair. Additional work may
be needed once the foundation work has begun based on the performance of this limited plan of repair. Thomas
Engineering Consultants has provided review of this limited plan of repair and it is our opinion that it is reasonable
and safe for the structure. If interior piers are shown on this drawing the contractor will place them based on the
locations of grade beams, plumbing lines and post tension cables, therefore, the locations shown on this map are
approximate. The contractor shall provide the means -and -methods of this installation. Additional repairs may be
required upon review of the structure by Thomas Engineering Consultants. This is a proposed scope of work and has
not been completed therefore we do not certify any existing or proposed foundation repair work on this map at this
time. If the reader would like to be certain that any proposed or existing repairs have been completed they must
request an engineering certificate for the subject foundation work from the foundation repair company.