HomeMy WebLinkAboutItem 13 - CDBGMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: APRIL 19, 2022 SUBJECT: ESOLUTION FOR CONSTRUCTION CONTRACT AWARD - 47TH AND 48TH YEAR COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM AND APPROPRIATE FUNDING RECOMMENDATION: City Council to consider a resolution approving the Tarrant County contract with McClendon Construction Company, Inc. for the 47th and 48th Year Community Development Block Grant street reconstruction project and an ordinance appropriating funds. FUNDING SOURCE: Funds are available in the Capital Project Streets Fund 178 in the estimated amount of $712,000. BACKGROUND: The scope of the project is the reconstruction of the 600 and 700 blocks of East Worth Street from Austin to Ruth including concrete paving, gutters, sidewalks, handicap ramps, parking spaces and driveway approaches, as well as a replacement and lowering of a 6" waterline in the 600 block of East Worth Street. These two blocks run adjacent to Faith Christian School. The roadway reconstruction project is located in the Original Town of Grapevine, CDBG Target Area designated as census tract 1137.05 Block Group 4, in the Housing and Urban Development (HUD) Low/Moderate Income Survey Data (LMISD). The proposed project will improve the area by providing an improved travel surface for both motorists and pedestrians in the neighborhood as well as improved water quality and fire protection. On March 2, 2021, Council held a Public Hearing for the project. This project is to be funded through two years of CDBG funding (47th and 48th year). At the time of the public hearing, the estimated cost of the project with engineering was $1,265,000 of which, approximately $480,000 is expected to be provided by Tarrant County and the City's match was expected to be $785,000 over the two years of CDBG funding. The application process requires that the following statement be included in the memo: "The City shall be responsible for all costs of the 47th Year and 48th Year CDBG project that exceeds the amount of the grant fund." Bids were received and opened on March 30, 2022. There were a total of two bidders on this project. The bids were as follows: McClendon Construction Company, Inc. $1,027,128 Nu -Way Construction, LLC $1,365,540 Bids have been reviewed and references checked. The Engineer of Record and City staff recommend Council approving the resolution to award the contract to McClendon Construction Company, Inc. in an amount estimated to be $1,027,128. In addition, funds in the amount of $164,340.48 (16%) are being requested for construction related services. This includes 10% for construction contingencies, 4% for inspection, and 2% for materials testing. Tarrant County manages the CDBG program and will provide project management and process payments from McClendon Construction Company, Inc. for the project. Tarrant County will fund $480,000 in construction funding, which leaves a City obligation of $547,128. Estimated cost to the City, including the City obligation and contingency, is $711,468.48 (rounded to $712,000). This is lower than the City estimated match at the Public Hearing of $785,000. Funds are available in the Capital Projects Street Fund. Staff recommends approval. _ A E Worth Street E TEXAS ST T EARRX S' f`. if - �;l o ro j ect Extent Prepared for City Cowici7 ifeeting on Ge�rc w0Q� Tuesday, April l9th , 2022 o - oPita , �..� - ` AMW� Am.. t r r • ti.. 100, E WORTH ST ft 74 , w 7f ,21 26 r ,z, r 114 DFW A Airport I 360 ILNUT ST ,21 I{ RESOLUTION NO. 2022-003 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, SUPPORTING THE TARRANT COUNTY TRANSPORTATION BOND PROGRAM; AUTHORIZING CITY STAFF TO SUBMIT CANDIDATE PROJECTS; AUTHORIZING FUNDING PARTICIPATION WITH TARRANT COUNTY, AND PROVIDING AN EFFECTIVE DATE WHEREAS, On March 2, 2021, the City Council of the City of Grapevine, Texas conducted a public hearing related to the proposed 47t" and 48t" Year Community Development Block Grant Program (CDBG); and WHEREAS, On March 2, 2021, the City Council of the City of Grapevine, Texas approved the 47t" and 48t" Year CDBG program for the reconstruction of the 600 and 700 blocks of east Worth Street (from Austin to Ruth Streets); and WHEREAS, Tarrant County, Texas solicited bids for the 47t" and 48t" Year CDBG program; and WHEREAS, The City of Grapevine City Council is approving the hiring of McClendon Construction Company, Inc. as the low bidder for the 47t" and 48t" Year CDBG Project; and WHEREAS, The City of Grapevine is approving the bid amount of $1,027,128.00 submitted by McClendon Construction Company, Inc. and a project contingency in the amount of $164,340.48 for the 47t" and 48t" Year CDBG Project; and WHEREAS, The City of Grapevine commits up to an amount of $712,000 toward construction of the 47t" and 48t" Year CDBG Project; and WHEREAS, The City of Grapevine accepts the construction time on the project will be 120 calendar days; and WHEREAS, all constitutional and statutory prerequisites for the approval of this resolution have been met, including but not limited to the Open Meetings Act; and WHEREAS, the City Council deems the adoption of this resolution to be in the best interests of the health, safety, and welfare of the public. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated hereinabove are found to be true and correct and are incorporated herein by reference as if copied in their entirety. Section 2. That the City Council of the City of Grapevine, Texas, approves the terms as set forth above concerning the 47t" and 48t" Year CDBG Project to be submitted to the Tarrant County Community Development Division for approval by the Tarrant County Commissioner's Court Section 3. That this resolution shall take effect from and after the date of its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 19th day of April, 2022. APPROVED: William D. Tate Mayor ATTEST: Tara Brooks City Secretary APPROVED AS TO FORM: Matthew C.G. Boyle City Attorney :Z •7[�ii�•77�rewzly410111k a ORDINANCE NO. 2022-022 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS, AUTHORIZING THE APPROPRIATION OF $712,000 IN THE CAPITAL PROJECT STREET FUND, DECLARING AN EMERGENCY AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council of the City of Grapevine desires to approve a Resolution supporting the Tarrant County Transportation Bond Program; and WHEREAS, On March 2, 2021, the City Council of the City of Grapevine, Texas conducted a public hearing related to the proposed 47t" and 48t" Year Community Development Block Grant Program (CDBG); and WHEREAS, On March 2, 2021, the City Council of the City of Grapevine, Texas approved the 47t" and 48t" Year CDBG program for the reconstruction of the 600 and 700 blocks of East Worth Street (from Austin to Ruth Streets), and WHEREAS, Tarrant County, Texas solicited bids for the 47t" and 48t" Year CDBG program; and WHEREAS, The City of Grapevine City Council is approving the hiring of McClendon Construction Company, Inc. as the low bidder for the 47t" and 48t" Year CDBG Project; and WHEREAS, The City of Grapevine is approving the bid amount of $1,027,128.00 submitted by McClendon Construction Company, Inc. and a project contingency in the amount of $164,340.48 for the 47t" and 48t" Year CDBG Project; and WHEREAS, The City of Grapevine commits up to an amount of $712,000 toward construction of the 47t" and 48t" Year CDBG Project; and WHEREAS, all constitutional and statutory prerequisites for the approval of this ordinance have been met, including but not limited to the Open Meetings Act and Chapter 211 of the Local Government Code; and WHEREAS, the City Council deems the adoption of this ordinance to be in the best interests of the health, safety, and welfare of the public. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS: Section 1. That all matters stated hereinabove are found to be true and correct and are incorporated herein by reference as if copied in their entirety. Section 2. That the City Council hereby authorizes $712,000 to be appropriated from the Capital Project Streets Fund for the 47t" and 48t" Year CDBG project. Section 3. That the terms and provisions of this ordinance shall be deemed to be severable, and that if the validity of any section, subsection, word, sentence or phrase shall be held to be invalid, it shall not affect the remaining part of this ordinance. Section 4. That the fact that the present ordinances and regulations of the City of Grapevine, Texas, are inadequate to properly safeguard the health, safety, morals, peace and general welfare of the inhabitants of the City of Grapevine, Texas, creates an emergency for the immediate preservation of the public business, property, health, safety and general welfare of the public which requires that this ordinance shall become effective from and after the date of its final passage, and it is accordingly so ordained. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF GRAPEVINE, TEXAS on this the 19th day of April, 2022. APPROVED: William D. Tate Mayor ATTEST: Tara Brooks City Secretary APPROVED AS TO FORM: Matthew C.G. Boyle City Attorney Ordinance No. 2022-000 2