Loading...
HomeMy WebLinkAboutWS Item 02 - Potential Street ProjectsMEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL MEETING DATE: JULY 21, 2015 SUBJECT: WORKSHOP — POTENTIAL STREET PROJECTS On May 5, Staff presented an update on the Master Thoroughfare Plan. At that time, Council asked us to bring back any recommended additions or deletions, along with estimated costs. Attached is a list of the project candidates divided into three categories: • Streets on the City Thoroughfare Plan yet to be improved to recommended capacity • Streets in need of major reconstruction • Street improvements warranting consideration Should Council direct staff to proceed, costs for any additional G. O. Bond projects (for example, fire station upgrades/reconstruction) and potential options in 2016 for an election will follow in a future workshop. CITY COUNCIL 1 JULY 21, 2015 POTENTIALPROJECTS FOR A GO BOND Heritage Ave; Mustang Rd to SH 26 Construct new four lane divided roadway segment with curb & gutter, underground drainage, sidewalks and street lighting partially on DFW Property. Approximately 2,400 LF. Heritage Ave; Bridge & Connections Construct a new four lane divided roadway section with curb & gutter, underground drainage, sidewalks and street lighting across Big Bear Creek. Includes connection of Parr Lane to Heritage Ave from the west. Approximately 2,500 LF. Roberts Rd; Hall Johnson Rd to Colleyville City Limit Reconstruct Roberts Rd to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 2,100 LF. Hughes Rd; SH 121 to Euless Grapevine Rd Reconstruct Hughes Rd to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 5,100 LF. Euless Grapevine Rd; SH 360 to Glade Rd Construct the east one half of roadway between Hughes Rd and Glade Rd. Construct full pavement width for a four lane pavement section from Hughes Rd to SH 360. Approximately 3,500 LF. Wall Street; Main St to Texan Trail Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 1,800 LF. Wall Street: Main St to Dove Rd Reconstruct the roadway to an improved four lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 2,500 LF. FY 16 Public Works Street CIP Listing Individual Descriptions 7-13-15 Ruth Wall St; NW Hwy to Wildwood Dr Reconstruct segment of Ruth Wall Rd that is experiencing significant distress in the concrete pavement due to soil movement. Approximately 2,100 LF. Dove Loop; Dooley St to Boyd Dr Reconstruct segment of Dove Loop that is experiencing significant distress in the pavement due to soil movement and roadway age. Oldest segment of Dove Loop constructed more than 30 years ago. Staff has had this segment on its list for a couple of years but have been waiting for the 2015 W & WW Project to complete the waterline replacement in the corridor before taking any major action. Approximately 1,200 LF. Dooley St; College St to Wall St Reconstruct segment of Dooley St that is experiencing significant distress in the concrete pavement due to soil movement. Approximately 1,800 LF. Boyd Dr; Dove Loop to NW Hwy Reconstruct asphalt roadway to address pavement failures in another old roadway. Primary route for Fire Dept emergency runs from Station # 1. Approximately 1,800 LF. Baze Rd; Hughes Rd to Glade Rd Reconstruct concrete roadway to address pavement failures in an old four lane divided roadway. Approximately 2,800 LF. Fairway Drive Improvements Widening of Fairway Drive from SH 26 to Cowboys GC Entrance. In conjunction with a dual left turn from SH 26 to Fairway Dr, these improvements should improve the operation of the current left turn and provide a significant Length of 2 lane NB roadway with a required merge before the Dam. Approximately 2,500 LF. Hudgins St Widening and Re -alignment; Main St to Dooley St Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Re-routing of roadway at east end to tie into Dooley St. Approximately 1,500 LF. FY 16 Public Works Street CIP Listing Individual Descriptions 7-13-15 Kimball Rd; Meadowmere Dr to Silvercrest Ln Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 3,500 LF. Kimball Rd; Meadowmere Dr to Dove Rd Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 3,500 LF. Bushong Rd; Dooley St to Ruth Wall Rd Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 2,400 LF. Wildwood Dr; Dooley St to Ruth Wall Rd Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Approximately 2,650 LF. College St; Ball St to Church St Reconstruct the roadway to an improved two lane pavement section with curb & gutter, underground drainage, sidewalks and street lighting. Includes improvements to the crossing of Morehead Branch. Approximately 1,500 LF. Dove Rd; NW Hwy to Wall St Reconstruct the roadway and reconfigure the intersection at Wall St to improve flow for the principal movements. Approximately 650 LF. Dove Loop; Ruth Wall Rd to SH 26 Extend roadway in a four lane divided configuration from Ruth Wall Rd to SH 26 across Gaylord Property. Will provide improved operation for Ruth Wall EB & WB traffic to access SH 26 and SH 121, IH 635 & FM 2499. Approximately 2,000 LF. FY 16 Public Works Street CIP Listing Individual Descriptions 7-13-15