MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: BRUNO RUMBELOW, CITY MANAGER �j-Z,
MEETING DATE: SEPTEMBER 20, 201
SUBJECT: MEADOWMERE PARK BOAT RAMP IMPROVEMENTS —
CHANGE ORDER NO. 1
RECOMMENDATION:
City Council to consider approval of Change Order No. 1 to the Meadowmere Park Boat
Ramp Improvements construction contract with Dean Electric dba Dean Construction in
the amount of $48,750. A copy of the change order is attached.
FUNDING SOURCE:
Funds are available from a $470,000 grant from the Texas Parks & Wildlife Department
The accounts are: 113 - 048850 -312 -10 & 113 -4899 -312 -10 —Grant
121- 48850- 312 -09- 000004 &121- 48899 - 312 -09- 000004 — City
BACKGROUND:
The Council approved a resolution at the September 16, 2008 meeting authorizing
participation in the State Boating Access Program managed by the Texas Parks &
Wildlife Department (TPWD). Staff subsequently submitted a grant application for a low
water boat ramp to the TPWD and the Texas Parks & Wildlife Commission approved the
grant at their January 2009 meeting. Staff submitted a second grant application to
TPWD for a restroom facility, picnic pavilion and other amenities in mid 2009 and the
grant was approved by the TPWD Commission in January of 2010. A total of $470,049
was approved by the TPWD Commission for the boat ramp improvements and the City's
match is $200,000.
The project includes the installation of a low water boat ramp and concrete drive and
turnaround, two courtesy docks and gangways, walkways, a pavilion, restroom, lighting,
landscaping and parking lot improvements.
This boat ramp is designed to be a low water boat ramp. When the project was sent out
for bids, the specifications stated that the end of the boat ramp was lake elevation 535,
which is the normal level of the lake. The project was bid this way because the elevation
of the lake could not be determined at the time of construction. Since the lake is over 3
feet below normal level, Change Order No. 1 will allow the ramp to be extended another
36 feet. The ramp is designed to be extended another 48 feet into the lake. However, it
would be cost prohibitive to extend the ramp that far at this time. As the lake level drops
in the future, staff will extend the ramp.
DE
September 14, 2011 (8:49AM)
mu 0 1 ) 'w
w o
Document
The Contract is changed as follows:
36 x 30 13oat Ramp including excavation $48,750.00
HASM ON CURRIM LAKE ELEVATION.
The original (Contract Sum) ( F? Ice) was 387,053'.55 .
Net change by previously authorized Change Orders 1-0-
The (Contrast Sum) ( ) prior to this Change Order was '$ 387, 053.55
The ( Contract Sum) ( ) xxdU be (increased)
by axis Change Order 48, 750.00
The new Contract Sum including this Change Order will be $ 435,803.55
The Contract Time will be (increased) ( ) by ( 60 ) days
The date of Substantizl Completion as Of the date of this Change Order therefore is
(Note: 71his sunuttaty noes not reflect changes in the Contract Sum, Contract Vine or Gisaraniced Marina an Price which
have been authori; ed by Con.4ncction Chaatge Directive.)
NOT'VAUD UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR.
. D CON UCTION
CONSTRUCTION MANAGER
ARCHITECT
701 Hall St.
Cedar Hill, Texas 75104 —
ADDRESS r '-
ADDRESS
BY RATE
BY Grey Firek�augh, Pres. DATE g /13 /ao11"
CITY OF G'R&EUINE
CONTRACTOR -
WEShady
Sol Brd6li Dr.
evine....1exas '76051
ADDRESS
ADDRESS..
BY DATE.
BY DATE
tlaim. Yciii taClrmid Wgn an oiri'Binal A11A. Cont.rrw: t Nli' ct,.tul'ne nt„ i:::wru iaIP'�'ie t�z�s . .' +t., ... �r, FLF�. k1€ �r,9i ?:.auras That
N °Inan e.s w1fli not be obs=ilreri..
AIA Document G7DIlCi &'m -1992. Copyright 0 1992 by The American Institute of Architects. All rights reserved. A
it protected by U.S. Copyright Law and tntornattonsl Treatles. an`, or any portion
of It, may result in covere civil and criminal penalties, and will be prosocuted to the maximum entent passible under the lawn. Purchasers are
permitted to reproduce ten (19) copies of this document when completed To report copyright violations DMA Contract Documents, e-mail The Amen=
Institute a Architects' legal counsel, copyrightLftia crg.