Loading...
HomeMy WebLinkAboutItem 09 - Meadowmere ParkI IIIFEN MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: BRUNO RUMBELOW, CITY MANAGER �j-Z, MEETING DATE: SEPTEMBER 20, 201 SUBJECT: MEADOWMERE PARK BOAT RAMP IMPROVEMENTS — CHANGE ORDER NO. 1 RECOMMENDATION: City Council to consider approval of Change Order No. 1 to the Meadowmere Park Boat Ramp Improvements construction contract with Dean Electric dba Dean Construction in the amount of $48,750. A copy of the change order is attached. FUNDING SOURCE: Funds are available from a $470,000 grant from the Texas Parks & Wildlife Department The accounts are: 113 - 048850 -312 -10 & 113 -4899 -312 -10 —Grant 121- 48850- 312 -09- 000004 &121- 48899 - 312 -09- 000004 — City BACKGROUND: The Council approved a resolution at the September 16, 2008 meeting authorizing participation in the State Boating Access Program managed by the Texas Parks & Wildlife Department (TPWD). Staff subsequently submitted a grant application for a low water boat ramp to the TPWD and the Texas Parks & Wildlife Commission approved the grant at their January 2009 meeting. Staff submitted a second grant application to TPWD for a restroom facility, picnic pavilion and other amenities in mid 2009 and the grant was approved by the TPWD Commission in January of 2010. A total of $470,049 was approved by the TPWD Commission for the boat ramp improvements and the City's match is $200,000. The project includes the installation of a low water boat ramp and concrete drive and turnaround, two courtesy docks and gangways, walkways, a pavilion, restroom, lighting, landscaping and parking lot improvements. This boat ramp is designed to be a low water boat ramp. When the project was sent out for bids, the specifications stated that the end of the boat ramp was lake elevation 535, which is the normal level of the lake. The project was bid this way because the elevation of the lake could not be determined at the time of construction. Since the lake is over 3 feet below normal level, Change Order No. 1 will allow the ramp to be extended another 36 feet. The ramp is designed to be extended another 48 feet into the lake. However, it would be cost prohibitive to extend the ramp that far at this time. As the lake level drops in the future, staff will extend the ramp. DE September 14, 2011 (8:49AM) mu 0 1 ) 'w w o Document The Contract is changed as follows: 36 x 30 13oat Ramp including excavation $48,750.00 HASM ON CURRIM LAKE ELEVATION. The original (Contract Sum) ( F? Ice) was 387,053'.55 . Net change by previously authorized Change Orders 1-0- The (Contrast Sum) ( ) prior to this Change Order was '$ 387, 053.55 The ( Contract Sum) ( ) xxdU be (increased) by axis Change Order 48, 750.00 The new Contract Sum including this Change Order will be $ 435,803.55 The Contract Time will be (increased) ( ) by ( 60 ) days The date of Substantizl Completion as Of the date of this Change Order therefore is (Note: 71his sunuttaty noes not reflect changes in the Contract Sum, Contract Vine or Gisaraniced Marina an Price which have been authori; ed by Con.4ncction Chaatge Directive.) NOT'VAUD UNTIL SIGNED BY THE OWNER, CONSTRUCTION MANAGER, ARCHITECT AND CONTRACTOR. . D CON UCTION CONSTRUCTION MANAGER ARCHITECT 701 Hall St. Cedar Hill, Texas 75104 — ADDRESS r '- ADDRESS BY RATE BY Grey Firek�augh, Pres. DATE g /13 /ao11" CITY OF G'R&EUINE CONTRACTOR - WEShady Sol Brd6li Dr. evine....1exas '76051 ADDRESS ADDRESS.. BY DATE. BY DATE tlaim. Yciii taClrmid Wgn an oiri'Binal A11A. Cont.rrw: t Nli' ct,.tul'ne nt„ i:::wru iaIP'�'ie t�z�s . .' +t., ... �r, FLF�. k1€ �r,9i ?:.auras That N °Inan e.s w1fli not be obs=ilreri.. AIA Document G7DIlCi &'m -1992. Copyright 0 1992 by The American Institute of Architects. All rights reserved. A it protected by U.S. Copyright Law and tntornattonsl Treatles. an`, or any portion of It, may result in covere civil and criminal penalties, and will be prosocuted to the maximum entent passible under the lawn. Purchasers are permitted to reproduce ten (19) copies of this document when completed To report copyright violations DMA Contract Documents, e-mail The Amen= Institute a Architects' legal counsel, copyrightLftia crg.