Loading...
HomeMy WebLinkAboutWS Item 02 - DFW Connector Design IssuesWS IIS MEMO TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: RUMBELOW, CITY MANAGER SA2, MEETING DATE: AUGUST 6, 2013 SUBJECT: WORKSHOP — UPDATE ON DFW CONNECTOR The DFW Connector project is expected to reach substantial completion in September 2013. As with any large project, there are several outstanding design issues that have become apparent during the course of the project. Staff will provide an update on the noteworthy items and the actions already being taken to address them. Topics include: • Potential for a new ramp from southbound William D. Tate Avenue (SH 121 frontage road) to southbound SH 360 • Potential for a new driveway from back of Tom Thumb shopping center to Wall Street • Potential for a free right -turn lane from eastbound SH 114 frontage road to southbound William D. Tate Avenue • Striping/signage changes on both frontage roads at Northwest Highway/FM 1709 to provide dual left turn lanes • Striping/signage changes on Northwest Highway at Park Boulevard to reduce driver confusion and lane changing July 31, 2013 (10:46AM)