HomeMy WebLinkAboutItem 06 - Main Street Developer AgreementFROM: BRUNO RUMBELOW, CITY MANAGER MEETING DATE: AUGUST 6, 2013 SUBJECT: DEVELOPER AGREEMENT WITH CHATEAU GROUP DEVELOPMENT LIMITED FOR THE GALLERY ON MAI STREET COMMERCIAL DEVELOPMENT I City Council consider approving a Developer's Agreement with Chateau Group 1 Development Limited to establish the City's and Developer's participation in the Street and Utility Improvements in and around the Gallery on Main Street site bordered by Main Street, Wall Street and Jenkins Street, authorizing the City Manager to execute said agreement and take any necessary action. City Staff and the developer have been discussing their respective needs for the development as well as improvements that the City Staff wishes to undertake. We have developed an agreement that meets the needs of both groups. The developer will perform the following: ® Curb replacement on Main Street 0 Period street light removal and replacement on Main Street (3) ® Curb construction on Wall Street 0 Curb construction on Jenkins Street north of Wall Street; east and west side (including new driveway apron into Jenkins Street parking lot) ® Sidewalk Construction on Main Street, Wall Street and Jenkins Street; North of Wall Street ® Pavement reconstruction on Jenkins Street north of Wall Street — cost of materials ($10,000.00) 0 Period style street light installation (new locations) around perimeter of site (7) ® 8" waterline construction on Jenkins Street between Wall Street and Northwest Highway — cost of Materials ($ 5,000.00) ® Banner pole east side Main Street to remain until close of GrapeFest ® New banner pole foundation construction — east side Main Street July 30, 2013 (3:16PM) City will perform the following: • Replace a 40 year old dead-end 4" waterline in Jenkins Street with an 8" waterline that will be connected to lines in Northwest Highway and Wall Street • Install a storm drainage pipe with inlets in Jenkins Street from Northwest Highway to the south side of Wall Street to collect surface water in Jenkins Street before it sheet flows across Wall Street • Reconstruct Jenkins Street subgrade with city crews in preparation for curb & gutter and asphalt surface • Perform asphalt placement on Jenkins Street and adjacent to the new curbs on Main Street and Wall Street • Remove banner pole - east side of Main Street after close of GrapeFest • Install new banner pole - east side of Main Street after foundation installed by developer The Developer • shall be allowed to close Jenkins Street from Wall Street north for a distance of 250 feet, the development's north property line during construction of the development improvements • shall clear Jenkins Street and return it to the City for annual Main Street Days and GrapeFest festivals 72 hours prior to closing of Main Street for each event. 0 shall be allowed to close Jenkins Street again after each festival has ended • shall be allowed to reserve the head -in parking on the west side of Jenkins Street for the Gallery on Main Street tenants • shall dedicate a public access easement around the perimeter of the site for wide sidewalks • shall maintain the sidewalks constructed within street right-of-way and public access easements The participation by the Developer and the City in this agreement is favorable for both parties. The needed water and storm drainage infrastructure improvements are a benefit to the City as well as the final pavement surface on Jenkins Street. The new curb & gutter on Jenkins Street, the water line and the final pavement surface are a functional as well as an aesthetic benefit to the Developer. JSL/ds July 30, 2013 (4:08PM) STATE OF TEXAS § COUNTY OF TARRANT § DEVELOPER'S AGREEMENT A WHEREAS, Chateau Group 1 Development Limited, L.P, a Texas Limited Partnership, hereinafter referred to as "Owner," is the owner of land in the City of Grapevine, Tarrant County, Texas, a Texas home -rule City, hereinafter referred to as "City", which land ("Property") is more specifically described as THE GALLERY ON MAIN STREET, City of Grapevine, Tarrant County, Texas, incorporated herein for all purposes; and WHEREAS, the Owner is proposing to develop the Property with a multi -tenant commercial building, (the "Project"); and WHEREAS, the "Project" necessitates the construction of head in parking spaces along the west side of Jenkins Street and also parallel spaces along the east side of Jenkins Street between Northwest Highway and Wall Street and due to the parking spaces being located on partially privately owned land the Owner shall have exclusive right to reserve any parking spaces on the west side of Jenkins Street and, WHEREAS, the "Project" provides an opportunity to replace an existing 40 year old dead end 4" water line with a new 8" waterline that will be connected to waterlines in Northwest Highway and Wall Street and improve fire flow to the "Project"; and WHEREAS, the replacement of the old waterline provides a benefit to the Owner and the City and as such, Owner agrees to fund the cost of the materials (Exhibit A attached) necessary to construct the 8" line, estimated to be no more than $ $5,000 and the City agrees to design and construct the line with all necessary appurtenances at its sole cost-, and WHEREAS, the City agrees to allow the Owner to close Jenkins Street from Wall Street north for a distance of approximately 250 feet, to the Property's north property line during the construction of the "Project" with the provision that the area will be cleared and returned to the City for the annual Main Street Days and Grapefest festivals 72 hours prior to closing of Main Street for each event and will remain available for City use during the entire duration of each festival at which time, the roadway again may be closed, and WHEREAS, the Owner plans to construct concrete curb & gutter bordering both sides of Jenkins Street associated with the head in and parallel parking and fund the cost of an asphalt overlay, to be applied by the City, of Jenkins Street to upgrade the pavement surface between the curbs after use of the area for construction staging has been completed; and OAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 1 WHEREAS, the City has an interest in extending an underground storm drainage line along Jenkins Street from an existing system in Northwest Highway to the south side of the intersection of Wall Street and Jenkins Street to resolve an existing roadway drainage problem and, as such, the City shall provide the design work, material and construction for the storm drainage line and WHEREAS, the construction of both a waterline and a storm drainage line in the pavement area of Jenkins Street will disrupt the pavement subgrade sufficiently to necessitate a re -stabilization of the subgrade in advance of paving; and WHEREAS, the Owner and the City agree that the City shall provide the design work and shall perform the re -stabilization of the subgrade, in advance of the curb and gutter placement by the Owner, and the City shall place the asphalt base and shall place the final asphalt surface course with City crews; and WHEREAS, the Owner agrees to fund the material cost (Exhibit A attached) for the asphalt pavement on Jenkins Street at an estimated cost of $ 10,000.00; and WHEREAS, the Project includes the construction of new curb and gutter along the Property's frontage on Main Street, Wall Street and both sides of Jenkins Street; and WHEREAS, the Owner and City agree that the asphalt repair and tie—in to the new curb and gutter shall be performed by City forces with the cost of materials being funded by the Owner, and WHEREAS, the City is currently planning to reconstruct the parking lot in the northeast corner of Jenkins Street and Wall Street to a condition matching recent parking lot construction in the downtown area including the relocation of the drive to Jenkins Street north of its current location to provide for better flow through the lot and the City plans to grade the lot during this reconstruction period to reduce or eliminate the need for a retaining wall along the east side of Jenkins Street, with intent of allowing pedestrians to step from the parking lot to the abutting sidewalk on the east side of Jenkins Street with little or no difference in elevation between the lot and the sidewalk. In the event that the parking lot elevation cannot be lowered sufficiently to match the sidewalk elevation, it is anticipated that no more than a 6" high curb will need to be incorporated into the Owner's construction of the sidewalk which will be constructed flush with the top of the street curb, approximately 6" above the street. WHEREAS, the Owner and City agree that the construction of the concrete drive approach for this new drive location shall be included in the Owners construction of the curb and gutter on Jenkins Street at the Owners cost-, and WHEREAS, the Owner agrees to dedicate a public access easement around the perimeter of the building (defined by a Public Access Exhibit) for sidewalks planned with the Project, but by granting this public access easement to the City, Owner requests the OAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 ON City to add Owner's name (or its assigns) to the City's liability policy as an "Additional Insured." WHEREAS, the Owner agrees to maintain the sidewalks constructed with the Project within the street right of way and public access easement, with the exception of any area containing iconic hardscape or statues that are owned and supplied by the City and any area that is within 3 feet from any point of the footprint of the hardscape, which said area and content shall be the sole responsibility of the City; and WHEREAS, the Owner agrees to provide street light bases and conduit in the public Right -of -Way around the building to accommodate ten (10) antique light poles (positioned per the Street Lighting Plan of the approved construction drawings) to match the existing City owned poles currently along Main Street and the Owner hereby agrees to pay to the City the cost for Oncor to remove existing light poles and fixtures and purchase ten (10) new light poles and fixtures to be installed by the City upon Owner provided bases. The City shall thereafter be responsible for on-going maintenance of the poles and fixtures as well as being financially responsible for the energy to illuminate the fixtures and WHEREAS, the City utilizes two banner poles on the north end of Main Street to display advertising for upcoming events and in an effort to help promote GrapeFest 2013, Owner agrees to leave the existing pole located on the east side of Main Street intact until GrapeFest 2013 is concluded while concurrently providing the labor and concrete foundation for the future re -location of the existing banner pole located along the east side of Main Street (location shown on attached Exhibit B) and a matching concrete foundation, directly across the street from the selected east side banner foundation location, provided that the City reimburse the Owner for the cost of the relocating the banner foundation on the west side of Main Street and that the City be responsible for the removal and re -installation of both banner poles after the conclusion of GrapeFest 2013. NOW, THEREFORE, the parties to this Contract, the City and the "Owner", do enter into this Cost Participation Contract, for good and valuable consideration, the receipt and sufficiency of such consideration being hereby acknowledged, and in the mutual promises and mutual benefits that flow to each party, do hereby contract, covenant, warrant, and agree as follows: Section 1. That all matters stated in the preamble above are found to be true and correct and are incorporated into the body of this Cost Participation Contract as if copied verbatim in their entirety. Section 2. The "Owner" hereby agrees, at its sole cost, to employ a civil engineer registered in the State of Texas to prepare and seal the construction plans of the roadway improvements to Main Street, Wall Street and Jenkins Street. Section 3. The "Owner" hereby agrees to fund the costs for a registered civil OAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 3 engineer to provide Construction Phase Engineering Services during the construction of the roadway improvements. Section 4. That the City agrees to design and construct the 8" waterline in Jenkins Street, the storm drainage line in Jenkins Street and reconstruct the roadway subgrade and asphalt pavement of Jenkins Street with City forces and to provide Owner with an itemized materials list and pricing for water line, storm drainage line and asphalt overlay material, (Exhibit A attached) which shall be made part of this Agreement. Section 5. That the Owner agrees to provide funding for the materials necessary for the construction of the 8" waterline and the asphalt pavement final surface course in Jenkins Street from Northwest Highway to Wall Street. Section 6. That the Owner agrees to construct all curb and gutter on Main Street, Wall Street and Jenkins Street, including the drive approach to the parking lot in the northeast corner of Jenkins Street and Wall Street at its sole cost. Section 7. That the Owner agrees to dedicate the necessary public access easements for the sidewalk constructed on the west, south and east boundary of the Project, subject to the terms herein. Section 8. That the Owner agrees to pay to the City the cost for removal of the three existing street lights by Oncor reflected in Exhibit B and purchase ten new street lights on Main Street, Wall Street and Jenkins Street, including conduit and pull boxes, at owner's sole cost. Installation of the ten new street lights shall be performed by the City at its cost. Section 9. That the City agrees to install a new Oncor power supply pedestal and meter box to provide power to the new street lights constructed with the "Project" at the City's cost. Section 10.1ndemnity Provisions. The "Owner" shall waive all claims, fully release, indemnify, defend and hold harmless the City and all of its officials, officers, agents, consultants and employees in both their public and private capacities, from any and all liability, claims, suits, demands or causes of action, including all expenses of litigation and / or settlement which may arise by injury to property or person occasioned by error, omission, intentional or negligent act of "Owner", its officers, agents, consultants and employees arising out of or in connection with this Contract, or on or about the property, and "Owner" will, at its own cost and expense, defend and protect the City and all of its officials, officers, agents, consultants and employees in both their public and private capacities, from any and all such claims and demands. Also, "Owner" agrees to and shall indemnify, defend and hold harmless the City and all of its officials, officers, agents, consultants and employees in both their public and private capacities, from and against any and all claims, losses, damages, causes of action, suit and liability of every kind, including all expenses of litigation, court costs and attorneys' fees for injury to or death of any person or for any damage to any property arising out of or in connection with the construction under this Contract on or near the Subject property. OAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 4 This indemnity shall apply whether the claims, suits, losses, damages, causes of action or liability arise in whole or in part from the intentional acts or negligence of "Owners" or any of their officers, officials, agents, consultants and employees, whether said negligence is contractual, comparative negligence, concurrent negligence, gross negligence or any other form of negligence. The City shall be responsible only for the City's primary negligence. The provisions above in this Section 6 shall apply only to errors, omissions, and acts occurring during the construction of the Project and not afterwards. Provided, however, that nothing contained in this Contract shall waive the City's defenses or immunities under Section 101.001 et seq. of the Texas Civil Practice and Remedies Code or other applicable statutory or common law. Section 11. Indemnity Against Design Defects. Approval of the City Engineer or other City employee, official, consultant, employee, or officer of any plans, designs or specifications submitted by the "Owner" under this Contract shall not constitute or be deemed to be a release of the responsibility and liability of the "Owner", their engineer, contractors, employees, officers, or agents for the accuracy and competency of their design and specifications. Such approval shall not be deemed to be an assumption of such responsibility or liability by the City for any defect in the design and specifications prepared by the consulting engineer, his officers, agents, servants, or employees, it being the intent of the parties that approval by the City Engineer or other City employee, official, consultant, or officer signifies the City's approval of only the general design concept of the improvements to be constructed. In this connection, the "Owners" shall, for a period of one (1) year following the City's acceptance of the Project, indemnify and hold harmless the City, its officials, officers, agents, servants and employees, from any loss, damage, liability or expense on account of damage to property and injuries, including death, to any and all persons which may arise out of any defect, deficiency or negligence of the engineer's designs and specifications incorporated into any improvements constructed in accordance therewith, and the "Owners" shall defend at his own expense any suits or other proceedings brought against the City, its officials, officers, agents, servants or employees, or any of them, on account thereof, to pay all expenses and satisfy all judgements which may be incurred by or rendered against them, collectively or individually, personally or in their official capacity, in connection herewith. Section 12. Approval of Plans The "Owner" and City agree that approval of plans and specifications by the City shall not be construed as representing or implying that improvements built in accordance therewith shall be free of defects. Any such approvals shall in no event be construed as representing or guaranteeing that any improvement built in accordance therewith will be designed or built in a good and workmanlike manner. Neither the City nor its elected officials, officers, employees, contractors and/or agents shall be responsible or liable in damages or otherwise to anyone submitting plans and specifications for approval by the City for any defects in any plans or specifications submitted, revised, or approved, in the loss or damages to any person arising out of approval or disapproval or failure to approve or disapprove any plans or specifications, for any loss or damage arising from the non-compliance of such plans or specifications with any governmental ordinance or regulation, nor any defects in construction undertaken pursuant to such plans and specifications. CiAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 ki Section 14. Upon completion of the construction of the Project, the public improvements addressed in this document, with the exception of the sidewalks, and all appurtenances thereto shall become the property of and shall be maintained by the City (subject to the warranties of the contractor performing the work). Section 15. Upon completion of the construction of the Project, the sidewalks constructed within street right of way and public access easements shall be maintained by the Owner (subject to the warranties of the contractor performing the work). Section 16. Notwithstanding anything in this Contract, nothing herein waives any right of immunity available to the City under applicable law. With respect to any indemnity provided for herein from "Owner" to City, "Owner" do not assume any liability for damages above and beyond what is recoverable against the City itself based on immunity or damage limits applicable to the City. Section 17. This Contract shall not be assignable without the express written consent of City and "Owners." Executed this Day of _, 2013. CHATEAU GROUP I DEVELOPMEN1 LIMITED, LP a Texas Limited Partnership Gary Hazelwood President City Attorney OAcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 0 M"WOMM Before me, a notary public, on this day personally appeared , known to me to be the person whose name is subscribed to the foregoing document and acknowledged to me that he executed the same for the purposes and consideration therein expressed. Given under my hand and seal of office this day of 2013. Notary Public Signature Notary Public Printed or Typed Name My commission expires: HIMIXON Before me, a notary public, on this day personally appeared I known to me to be the person whose name is subscribed to the foregoing document and acknowledged to me that he executed the same for the purposes and consideration therein expressed. Given under my hand and seal of office this day of 72013 Notary Public Signature Notary Public Printed or Typed Name My commission expires: Wcontract & interlocal\Developer Contract\'The Gallery on Main Street' Final 7-11-13 7 GALLERY ON MAIN STREET EXHIBIT'A' kins Paving psi u�p 2" overlay (NW HWY to Wall) Lime stablization Developer's portion Jenkins Water III. C900 water pipe Fittings Developer's portior, .O,uantity Unit Unit Cost Cost 1 LS $5,200.00 $5,200.001 1 LS $4,800.00 $4,800.00i 000.001 320 LF $7.03 $2,250.00 1 LS $2,750.00 $2,750.00 $5,000.00 0:\Capital Projects\Cost Estimates\Private Development\Gailery on Main Street cost estimate Rev Ex A 2013.xis :Street Lig Pole Proposed IStreet Light Banner Location Pole Street Light Pole Street Light 'Pole Street Lightl Pole-. ­ _7 A CC ITEM #6 va Street Light 'Pole 42 _z— Street L Pole -Street Lig Pole Street Light Pole I Light Pole %OEO�