Loading...
HomeMy WebLinkAbout04/26/2022 - F211334-1037563 - IN PLACE NUCLEAR DENSITY TESTOur test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written Remarks: approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-010(8/2/2016) Geotechnical Engineering | Construction Materials Testing | Environmental Engineering This report is in general compliance with one or more of the following technical standards: D6938-15 Respectfully Submitted, Paul Delaney Gauge Information Non-compliant results are indicated by an asterisk(*) if applicable. Serial No:10071 Manufacturer:Humboldt Model:H5001 EZ 13 Standard Count:(D):3142 (M):337 Wet Density (pcf) Dry Density (pcf) Percent Moisture (%) Percent Compaction (%) General Location Area:Yard / Utilities Test No.Test Location Lift/ Depth Mat. No. Probe Depth (in.) Field Test Data 14.5 108.2 -2 2 96.4 15Red Sandy Clay (Select Fill) Dark Brown and Brown Clay with Sand 382 22.4 9510 0 4 952 Project Specifications Mat. No. Optimum Moisture (%) Max Dry Weight (pcf) Proctor Report No. Moisture Min. (%) Max. Compaction Min. (%) Max.Material Description/Classification PI Material Information Laboratory Data 100 100 1 Alpha Testing, LLC 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 In-Place Nuclear Density Test Report 1 104 Armour Road Report Date: 4/26/2022 North Kansas City, MO 64116 Weather: Partly Cloudy Work Order Number: 1037563 Grapevine, Texas Page Number: 1 of Client:Chicken N Pickle Service Date: 04/22/2022 94.1 24.2 98Sanitary Sewer Line SS-2, Station 2+75 FG 2 6 116.9 119.2 94.8 Project:Chicken N Pickle Grapevine Project Number: F211334 Off Champagne Boulevard and Merlot Avenue Technician: Sullivan, Maddox 97 12.9 96 97 98 99 97 98 99 93.7 24.6 97 25.7 989Sanitary Sewer Line SS-2, Station 1+75 FG-1.0 2 6 12 Sanitary Sewer Line SS-2, Station 2+75 FG-1.0 2 6 11 Sanitary Sewer Line SS-2, Station 2+75 FG-2.0 95.1 26.0 116.8 117.1 94.6 23.826 10 Sanitary Sewer Line SS-2, Station 1+75 FG 2 6 6 10' S and 65' E from SW Corner of Building FG-0.67 1 6 7 Sanitary Sewer Line SS-2 Manhole, Station 1+75.88 West Quadrant FG-1.0 2 6 FG 2 6 118.7 104.7 13.4 3 7' S and 18' E from SW Corner of Building FG-1.0 1 6 2 5' S and 50' E from SW Corner of Building FG-1.5 1 6 118.9 105.3 1 5' S and 15' E from SW Corner of Building FG-1.5 1 6 118.7 118.7 104.9 119.8 5 10' S and 25' E from SW Corner of Building FG-0.67 1 6 4 7' S and 60' E from SW Corner of Building FG-1.0 1 6 118.8 8 Sanitary Sewer Line SS-2 Manhole, Station 1+75.88 East Quadrant 94.6 25.5 95.0 24.9 97 105.6 12.5 98 117.7 118.6 105.2 12.7 13.5119.1 104.2 13.0