Loading...
HomeMy WebLinkAbout04/29/2022 - F211334-1040588 - REINFORCING STEELItem Observed Correct Proper Placement Reinforcement Tied Properly Grade Reinforcement Number of Reinforcement X X N/A 1/7/2022 X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct Martinez, Sean The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. Detail Sheet:• Plan Sheet: Grapevine, Texas Report Date: Weather: Chicken N Pickle Grapevine Page Number: 1040588 1 of 1 Clear 4/29/2022 Off Champagne Boulevard and Merlot Avenue F211334 Technician: Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Grade Beams: Building A at CA/C1-C9, CA-CC.5/C1, CA-CC.5/C9 The representative utilized the following provided project plans to perform the observation: Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Drawings Approved Observation Information X X SC1.1 SC2.1 Not Correct Reinforcement Clean Project: Alpha Testing, LLC 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report • • 04/29/2022Service Date:Client:Chicken N Pickle 104 Armour Road North Kansas City, MO 64116 Work Order Number: Project Number: Correct Splicing Correct X X Item Observed Bar Length & Spacing Respectfully Submitted, Remarks: Paul Delaney X Proper Cover Proper Support Dowels in Place Stirrup Size Form Clean X Sheathing X X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X Grade Beam / Column Size