HomeMy WebLinkAbout05/17/2022 - F211334-1046352 - REINFORCING STEEL•
Plan Sheet:
Grapevine, Texas
SC2.1
Not Correct
Reinforcement Clean
Form Clean
Item Observed Correct
Grade Reinforcement
Number of Reinforcement
N/A
X
X
Size of Reinforcement
N/A
•Date:
X
X
X
Stirrup Spacing
Not Correct
Proper Placement
Reinforcement Tied Properly
X
X
Item Observed
Bar Length & Spacing
Grade Beam / Column Size
X
Building B Foundation Plan SC1.2
1 of 1
Clear
5/17/2022
Off Champagne Boulevard and Merlot Avenue
F211334
Technician:Sullivan, Maddox
11/5/2021
Detail Sheet:
Report Date:
Weather:
Chicken N Pickle Grapevine
1046352
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Footings: C5/CH-CJ and CL/C5-C7
The representative utilized the following provided project plans to perform the observation:
Support chairs added under rebar, Trash removed from form.
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
X
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016)
Drawings Approved
Observation Information
X
Project:
Alpha Testing, LLC
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Reinforcing Steel
Observation Report
•
•
Page Number:
The representative observed the reinforcing steel related items for the following area:
An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled.
05/11/2022Service Date:Client:Chicken N Pickle
104 Armour Road
North Kansas City, MO 64116
Work Order Number:
Project Number:
Correct
X
X
Proper Cover
Proper Support
Dowels in Place
Stirrup Size
X
X
Respectfully Submitted,
Remarks:
Paul Delaney
X
Sheathing
X
The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office.
Correct Splicing
Based on the representative's visual observation using the provided project plans, the area was compliant
X
PT Drawings X Cable/Tendon Count &
Spacing X
Cable/Tendon Drape X