Loading...
HomeMy WebLinkAbout05/17/2022 - F211334-1046352 - REINFORCING STEEL• Plan Sheet: Grapevine, Texas SC2.1 Not Correct Reinforcement Clean Form Clean Item Observed Correct Grade Reinforcement Number of Reinforcement N/A X X Size of Reinforcement N/A •Date: X X X Stirrup Spacing Not Correct Proper Placement Reinforcement Tied Properly X X Item Observed Bar Length & Spacing Grade Beam / Column Size X Building B Foundation Plan SC1.2 1 of 1 Clear 5/17/2022 Off Champagne Boulevard and Merlot Avenue F211334 Technician:Sullivan, Maddox 11/5/2021 Detail Sheet: Report Date: Weather: Chicken N Pickle Grapevine 1046352 Geotechnical Engineering | Construction Materials Testing | Environmental Engineering Footings: C5/CH-CJ and CL/C5-C7 The representative utilized the following provided project plans to perform the observation: Support chairs added under rebar, Trash removed from form. Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written X approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-019(8/2/2016) Drawings Approved Observation Information X Project: Alpha Testing, LLC 5058 Brush Creek Rd Fort Worth, TX 76119 www.alphatesting.com TBPE Firm No. 813 Reinforcing Steel Observation Report • • Page Number: The representative observed the reinforcing steel related items for the following area: An Alpha Testing engineering representative traveled to the above referenced project to perform a reinforcing steel observation as scheduled. 05/11/2022Service Date:Client:Chicken N Pickle 104 Armour Road North Kansas City, MO 64116 Work Order Number: Project Number: Correct X X Proper Cover Proper Support Dowels in Place Stirrup Size X X Respectfully Submitted, Remarks: Paul Delaney X Sheathing X The contractor was notified of the observation result and the engineering representative returned to the Fort Worth Office. Correct Splicing Based on the representative's visual observation using the provided project plans, the area was compliant X PT Drawings X Cable/Tendon Count & Spacing X Cable/Tendon Drape X