HomeMy WebLinkAbout05/31/2022 - F211334-1054640 - MASONRY OBSERVATIONDrawings Utilized
4
Masonry
Prisms Made No
Mortar Cubes
Made 6
Amount
Sand
Cement Amerimix preblend S
Lime
Cement Amerimix preblend
Grout Prisms
Made
Lime
Water
Sand
Gravel Gravel
Gravel
Cement
Lime
Mixing of Materials
X
TypeSource/Manufacturer Material Source/Manufacturer Type
Sand
Material Wet Dry N/A
X
X
CMU Blocks
X
X
Mortar (If Applicable)
Type of Mixer for Mortar
(If Applicable):
Type of Mixer for Grout
(If Applicable):
1 of
General Location:Elevator Shaft Walls
1
General Information
X
Courses:25-32 (Doorway and above)Ambient Temp.:
Ɣ
Ɣ
Ɣ
Plan Sheet:
Detail Sheet:
Date:
Item ObservedItem Observed Correct Not Correct
SR 3.1
Work Order Number:
Project Number:
Thompson, Bryan
Client:
Technician:
Project:
Report Date:
Weather:North Kansas City, MO 64116
Alpha Testing, LLC
5058 Brush Creek Rd
Fort Worth, TX 76119
www.alphatesting.com
TBPE Firm No. 813
Masonry
Observation Report
Chicken N Pickle
104 Armour Road 5/31/2022
05/27/2022Service Date:
Clear
Grapevine, Texas Page Number:
1054640
N/A
Reinforcing Steel Placement X Reinforcing Steel Embedment
Reinforcement Observation
N/ANot CorrectCorrect
Chicken N Pickle Grapevine F211334
X
Off Champagne Boulevard and Merlot Avenue
Geotechnical Engineering | Construction Materials Testing | Environmental Engineering
Remarks:
Reinforcing Steel Spacing X Bond Beam/Lintel Location X
Reinforcing Steel Ties
X Wall OpeningsReinforcing Steel Size
Reinforcing Steel Splices
approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Technician time is from portal to portal. MF-013(8/2/2016)
Paul Delaney
Our test results and reports are for the exclusive use of the Client (and designated recipients) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written
SR 3.1
4/5/2022
X Bond Beam/Lintel Reinforcement X
X Bond Beam/Lintel Grouted
Respectfully Submitted,
79°F
X
Grout (If Applicable)
Stationary mixer
Stationary mixer
Water
Storage of Materials Method of Mixing Materials
Material Amount