Loading...
HomeMy WebLinkAbout74-34790-22-25rsisoEllerbee-Walczak Inc. GEOTECHNICAL ENGINEERING & CONSTRUCTION MATERIALS TESTING SERVICES REPORT NO.: 74-34790-22-25rsi REPORT OF: Reinforcing Steel Inspection CLIENT: Wright Construction Company, Inc PROJECT: Wright Construction Office DATE: 7/27/2022 INSPECTOR: Issac Gutierrez On this date, reinforcing steel was inspected for the sidewalk on North, East and South side of building. The following Reinforcing Items were inspected. Summary of Inspection Items Inspected Correct Incorrect Items Inspected Correct Placing Drawings Approved x Dowel Bars in Place x Bar Size & Grade x Lapped Splices x Reinforcing Steel Clean x Column Ties Properly Tied & Spaced x Forms Clean x Proper Clearance from Forms x Number of Bars x Istirrup Spacing/Type x Bar Length & Shape x lWelded Splices Proper Bar Placement x (Mechanical Splices Properly Tied x I Proper Cover Proper Bar Supports x Plans or Cut Sheets used for Inspection: S.1.2 Plan Sheet Approval Date: 5/24/2021 Discrepancies: None Hector Martinez General Manager Cc: Wright —Ashley Wright awright@wrightconst.com T eil awren e, Jr., P.E. Texas Firm No. F-4610 Incorrect 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888