GEOTECHNICAL ENGINEERING &
CONSTRUCTION MATERIALS TESTING SERVICES
REPORT NO.:
74-34790-22-25rsi
REPORT OF:
Reinforcing Steel Inspection
CLIENT:
Wright Construction Company, Inc
PROJECT:
Wright Construction Office
DATE:
7/27/2022
INSPECTOR:
Issac Gutierrez
On this date, reinforcing steel was inspected for the sidewalk on North, East and South side of building.
The following Reinforcing Items were inspected.
Summary of Inspection
Items Inspected
Correct
Incorrect Items Inspected Correct
Placing Drawings Approved
x
Dowel Bars in Place x
Bar Size & Grade
x
Lapped Splices x
Reinforcing Steel Clean
x
Column Ties Properly Tied & Spaced x
Forms Clean
x
Proper Clearance from Forms x
Number of Bars
x
Istirrup Spacing/Type x
Bar Length & Shape
x
lWelded Splices
Proper Bar Placement
x
(Mechanical Splices
Properly Tied
x
I Proper Cover
Proper Bar Supports
x
Plans or Cut Sheets used for Inspection: S.1.2
Plan Sheet Approval Date: 5/24/2021
Discrepancies: None
Hector Martinez
General Manager
Cc: Wright —Ashley Wright awright@wrightconst.com
T eil awren e, Jr., P.E.
Texas Firm No. F-4610