HomeMy WebLinkAbout74-34790-22-27rsi0m, EllerCbee Wal EEak6 Inc.
GEOTECONSTRUCTION MATERIALS TESTING SERVICES
REPORT NO.:
74-34790-22-27rsi
REPORT OF:
Reinforcing Steel Inspection
CLIENT:
Wright Construction Company, Inc
PROJECT:
Wright Construction Office
DATE:
8/17/2022
INSPECTOR:
Saul Martinez
On this date, reinforcing steel was inspected for the parking lot and sidewalk.
The following Reinforcing Items were inspected.
Summary of Inspection
Items Inspected
Correct
Incorrect Items Inspected
Placing Drawings Approved
x
Dowel Bars in Place
Bar Size & Grade
x
Lapped Splices
Reinforcing Steel Clean
x
Column Ties Properly Tied & Spaced
Forms Clean
x
Proper Clearance from Forms
Number of Bars
x
Stirrup Spacing/Type
Bar Length & Shape
x
Welded Splices
Proper Bar Placement
x
Mechanical Splices
Properly Tied
x
Proper Cover
Proper Bar Supports
x
Plans or Cut Sheets used for Inspection: Sheet 14
Plan Sheet Approval Date: 8/16/2021
Remarks: Ashley with Wright informed rebar size is okay to be #3
Hector Martinez A..11 &ee,,
E.
General Manager Texas Firm No. F-4610
Cc: Wright — Ashley Wright awright@wrightconst.com
Correct Incorrect
x
x
x
x
4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117
Office 817-759-9999 • Fax 817-759-1888
Iip
!�
FF11 '' i e
g � ,it�pit„'i
i v
q
S".IM �§ Ig !al t! I
>i I. -I i- y00 1
N F N F N
If
V�
f ll 11 ! a
� r
'gal y F T
Li
y, if
(, :aj. Is
�+ =°(li;;:Z i a ii x le: i I' I�t — •/ I I i'
f•i�_ f a I' si �( � c.�.F;a°c'a .�. r j ii ( (I
a6 1� 6 will' r B, I
hillOf At
Ilk .19
Y NRp Ut NL
.A1TA RAAP pE nILS
Designed
N/A _ ° Ridinger
Designed by. lDR w m�
Drawn by. MAe --- PAVING DETAILS WRIGHT OFFICE B[JII,DING m a Q Associates, Inc.
N y Checked by. IRK GRAPEVINE, TEXAS �-
42' . R.. ,cxc Civil Engineers - Planners
Date: AUGUST 16, 2021 t= �fR sm x ca.«,a. -., sn. +m rw. Ro. ((c�a axa-mro
Project No. 005—OD6 L..n.wi.. r..a. soe: r.. R>(ur2� aarmi+