Loading...
HomeMy WebLinkAbout74-34790-22-28rsiEMEllerbee-Walczak Inc. GEOTECHNICAL ENGINEERIN6 & CONSTRUCTION MATERIALS TESTING SERVICES REPORT NO.: 74-34790-22-28rsi REPORT OF: Reinforcing Steel Inspection CLIENT: Wright Construction Company, Inc PROJECT: Wright Construction Office DATE: 9/1 /2022 INSPECTOR: TJ Luke On this date, reinforcing steel was inspected for the three light poles for exterior lighting. The following Reinforcing Items were inspected. Summary of Inspection Items Inspected Correct Incorrect I Items Inspected Correct Incorrect Placing Drawings Approved x Dowel Bars in Place x Bar Size & Grade x Lapped Splices l Reinforcing Steel Clean x Column Ties Properly Tied & Spaced x Forms Clean x Proper Clearance from Forms x Number of Bars x Stirrup Spacing/Type Bar Length & Shape x lWelded Splices Proper Bar Placement x Mechanical Splices Properly Tied x Proper Cover Proper Bar Supports x Plans or Cut Sheets used for Inspection: E0.2 Plan Sheet Approval Date: 10/21/2021 Discrepancies: None .41� Hector Martinez General Manager Cc: Wright — Ashley Wright awright@wrightconst.com Texas Firm No. F-4610 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888