Loading...
HomeMy WebLinkAboutC-45756Ellerbee-Walczak Inc. GEOTECHNICAL ENGINEERING & CONSTRUCTION MATERIALS TESTING SERVICES COMPRESSIVE STRENGTH (4x8 inch. Cylinder) Client: Wright Construction Co, Inc Report #: C-45756 Project: Wright Construction Office Technician: Jason P Fruge' Supplier: Placement: 4/8/2022 Strength*: 4500 PSI ID # Age Test Load Frac. Strength Pass Design ID: Date (lbs.) Type (PSI) Fail Ticket: 1 7 4/15 78835 3 6273 Truck: 2 28 5/6 84830 5 6751 Pass Batch Time: 3 28 5/6 91985 3 7320 Pass Sample Time: 4 28 5/6 82275 2 6547 Pass Ambient Temp: Material Temp: Air %: Unit Weight (pcf): Consolidation: Slump (Inches): Location: Elevator Pit Floor Remarks: Contractor made Cylinders, Teddy had me leave molds with Mike. Moved pour to 1 PM 817-739-1983 * Specified Strength Requirement given by: Concrete delivery ticket Specifications: Field and laboratory tests by EWI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231 Hector Martinez, General Manager aLawL- Texas Firm No. F-4610 Distribution: Wright Construction Co, Inc - Ashley Wright 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888 C-45756 Page 1 of 1