Loading...
HomeMy WebLinkAboutC-45818anEllerbee-Walczak Inc. GEOTECHNICAL ENGINEERING & CONSTRUCTION MATERIALS TESTING SERVICES COMPRESSIVE STRENGTH (4x8 inch. Cylinder) Client: Wright Construction Co, Inc Report #: C-45818 Project: Wright Construction Office Technician: Betuan E Cabral Supplier: Cowtown Redi Mix Placement: 4/23/2022 Strength*: 4500 PSI ID # Age Test Load Frac. Strength Pass Design ID: Hand Date (lbs.) Type (PSI) Fail Ticket: 106 1 7 4/30 51215 3 4076 Truck: 101 F 2 28 5/21 65490 5 5212 Pass Batch Time: 4:46 AM 3 28 5/21 66095 3 5260 Pass Sample Time: 5:21 AM 4 28 5/21 61625 5 4904 Pass Ambient Temp: 70 Material Temp: 70 Air %: 2 Unit Weight (pcf): 142.8 Consolidation: Rodding Slump (inches): 6 Location: From the end of Scribner Street to South 50Ft ID # Age Test Load Frac. Strength Pass Design ID: Hand Date (lbs.) Type (PSI) Fail Ticket: 106 5 7 4/30 49325 3 3925 Truck: 935 6 28 5/21 64740 3 5152 Pass Batch Time: 7:22 AM 7 28 5/21 60345 3 4802 Pass Sample Time: 8:10 AM 8 28 5/21 61645 5 4906 Pass Ambient Temp: 72 Material Temp: 70 Air %: 1.5 Unit Weight (pcf): 143.6 Consolidation: Rodding Slump (Inches): 6 Location: From the end of Scribner Street to South 20Ft Remarks: * Specified Strength Requirement given by: Concrete delivery ticket Specifications: Field and laboratory tests by EWI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231 Hector Martinez General Manager 6ela nc / .9erFirm No. F-4610 Distribution: Wright Construction Co, Inc - Ashley Wright 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888 C-45818 Page 1 of 1 r STONE OVERFLOW STRUCTURE N.T.S. T � g i(ti I/ 10SANITARYREF+ EASEMENT / P.R. T.C. 1. I n•\ y R 8• PU571Lti1'D1.tl / / -- I I ❑ LP \ \ O /7058 � (NNIL Tort/ ic • PVaLB60• • PVO.ee7.r • POC..6 8 7.r FL V ET) NCH HCTE EXIMo FABRIC CN Wm1 TH D a a BTExw TK calm SW BAGS FILLED MIN FILTER MW aw ONE AT FACM EM AIR) Og11E11 BACB M SETREEN M PREVENT CMS BETWEER\- 8• MIN. TOP OF uY PAVEMENT Tiaiar wB+�Aur N THE STONE EACH GUTTER AT THE DMTRANSVERSE OF SILT To GUTTER INBETRFIIA 11r. 1/Y HARCMME FABEMy�.' @ONOS1W11L QI w oT� loh e 0 � I � ' � I �\ ea \ I\ I \ ea I I \ . c0 I a« I \ CONCRETE PANNC\ \ I \ SOL C ea E 0 I \ I JCvr&4' _lcvcv — SO 1� y -• _ tx T OF WAY \ 6Oa CONSTRUCTION ENTRANCE NOTES: 1. LTON = 5 INCHES MINIMUM CRUSHED ROCK. 2. LENGTH: AS EFFECTIVE, BUT NOT LESS THAN 50 FEET. 3. THICKNESS: NOT LESS THAN 6 INCHES. 4. WIDTH NOT LESS THAN 25 FEET. 5. WASHING WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC ROADWAY. WHEN WASHING IS REQUIRED. IT SHALL BE DONE ON AN AREA STABILIZED MATH CRUSHED STONE WHICH DRAINS INTO AN APPROVED TRAP. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING STORM DRAIN. DITCH OR DETENTION PONDS. 6. MAINTENANCE THE ENTRANCE SHALL BE MAINTAINED IN CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAYS. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AND REPAI AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC ROADWAY, MUST BE REMOVED IMMEDIATELY. 7. DRAINA ENTRANCE MUST BE PROPERLY GRADED OR INCORPORATE A DRAINAGE SWALE TO PREVENT RUNOFF FROM LEAVING THE CONSTRUCTION SITE. 8. CONTRACTOR TO COORDINATE EXACT LOCATION OF THIS DETAIL