HomeMy WebLinkAbout74-34790-22-18rsiElle be Walcz k, Inc.
GEOTECHNIno
CONSTRUCTION MATERIALS TESTING SERVICES
REPORT NO.:
74-34790-22-18rsi
REPORT OF:
Reinforcing Steel Inspection
CLIENT:
Wright Construction Company, Inc
PROJECT:
Wright Construction Office
DATE:
4/12/2022
INSPECTOR:
Saul Martinez
On this date, reinforcing steel was inspected for the elevator pit.
The following Reinforcing Items were inspected.
Summary of Inspection
Items Inspected
Correct
Incorrect Items Inspected
(Placing Drawings Approved
x
Dowel Bars in Place
(Bar Size & Grade
x
(Lapped Splices
Reinforcing Steel Clean
x
I IColumn Ties Properly Tied & Spaced
IForms Clean
x
I IProper Clearance from Forms
INumber of Bars
x
I Stirrup Spacing/Type
IBar Length & Shape
x
I (Welded Splices
IProper Bar Placement
x
I IMechanical Splices
Properly Tied
x
I IProper Cover
IProper Bar Supports
x
Plans or Cut Sheets used for Inspection: S1.2
Plan Sheet Approval Date: 5/24/2021
Discrepancies: None
O&-
Hector Martinez
General Manager
Cc: Wright — Ashley Wright awright@wrightconst.com
4W6, Jr. P.E.
Texas Firm No. F-461
Correct Incorrect
x
x
x
x
x
4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117
Office 817-759-9999 • Fax 817-759-1888