Loading...
HomeMy WebLinkAbout74-34790-22-20rsiEllerbee-Walczak Inc. off GEOTECHNICAL ENGINEERING: & CONSTRUCTION MATERIALS TESTING SERVICES REPORT NO.: 74-34790-22-20rsi REPORT OF: Reinforcing Steel Inspection CLIENT: Wright Construction Company, Inc PROJECT: Wright Construction Office DATE: 4/22/2022 INSPECTOR: Joshua Guiles On this date, reinforcing steel was inspected for the office building slab & grade beams first floor. The following Reinforcing Items were inspected. Summary of Inspection Items Inspected Correct Incorrect I Items Inspected Correct Incorrect Placing Drawings Approved x IlDowel Bars in Place x Bar Size & Grade x ILapped Splices x Reinforcing Steel Clean x lColumn Ties Properly Tied & Spaced x Forms Clean x I Proper Clearance from Forms x Number of Bars x Istirrup Spacing/Type x Bar Length & Shape x lWelded Splices Proper Bar Placement x I Mechanical Splices Properly Tied x I Proper Cover x Proper Bar Supports x Plans or Cut Sheets used for Inspection: S1.1 Plan Sheet Approval Date: 5/24/2021 Remarks: Contractor told technician he will fix and replace any missing or broken rebar chairs. Hector Martinez General Manager Texas Firm No. F-4610 Cc: Wright — Ashley Wright awright@wrightconst.com 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888