Loading...
HomeMy WebLinkAbout74-34790-22-21rsiEllerbee-Walczak Inc. imu GEOTECHNICAL ENGINEERING & CONSTRUCTION MATERIALS TESTING SERVICES REPORT NO.: 74-34790-22-21 rsi REPORT OF: Reinforcing Steel Inspection CLIENT: Wright Construction Company, Inc PROJECT: Wright Construction Office DATE: 5/4/2022 INSPECTOR: Josue Aguado On this date, reinforcing steel was inspected for the footing of retaining wall/wall. The following Reinforcing Items were inspected. Summary of Inspection Items Inspected Correct Incorrect Items Inspected Correct Incorrect Placing Drawings Approved x Dowel Bars in Place x Bar Size & Grade x Lapped Splices x Reinforcing Steel Clean x I lColumn Ties Properly Tied & Spaced x (Forms Clean x (Proper Clearance from Forms x Number of Bars x (Stirrup Spacing/Type x Bar Length & Shape x lWelded Splices Proper Bar Placement x (Mechanical Splices Properly Tied x I Proper Cover x Proper Bar Supports x Plans or Cut Sheets used for Inspection: S1.1A Plan Sheet Approval Date: 3/8/2022 Remarks: Hector Martinez General Manager Cc: Number 5 rebars used. PFFirm nce, Jr., P.No. F-4610 Wright — Ashley Wright awright@wrightconst.com 4501 Broadway Ave. • P.O. Box 14809 • Haltom City, Texas 76117 Office 817-759-9999 • Fax 817-759-1888